Nearby Permits

Addition at 10950 E Elliot Rd

Mesa Development Services permit BLD2016-05436, opened Aug 18, 2016 for 10950 E Elliot Rd: addition. Cip #c01600 signal butte water treatment plant phase II . Scope of work for this phase II submittal includes construction of the following areas with (occupancy group/construction type): carbon dioxide area (h-4/ii-b), thickened sludge pump station (f-2/ii-b), mechanical dewatering building (f-2/ii-b), chemical bulding (mixed-f1/h4/ii-b), sodium hypochlorite building (f-2/ii-b), ozone generation building (mixed-f1/h4/ii-b), fluoride building (mixed/ii-b), operations building (b/iii-b), treatment complex (f-2/ii-b). Fire sprinkler systems inlcuded. Additional construction work will include installation of yard piping, electrical ductbanks, chemical trenches, miscellaneous yard facilities, replacement of chainlink fencing with cmu block wall, landscaping, irrigation and existing facility improvements. See permit #bld2016-02393 for phase 1 submittal. Special inspections required for steel, fabricators, concrete, masonry, soils, pier foundations, smoke control, fire lanes/roadways, field welding, penetrations in fire rated assemblies. Two new landscape water meters, 1" and 2" . New 10" domestic water meter. New 8" domestic water meter. One new 3 phase electric meter. Fire alarm is by defered submittal.

Permit number
BLD2016-05436
Opened
Type of work
Addition
Status
Issued
Reported cost
Not listed
ZIP code
85212 (from the permit's location)
City's category
Com (OTH) -- Additions
City's status
Issued
Source
Mesa Development Services permit data (this record)

Type of work and status are our standard labels, so permits compare across cities. The city's own wording is shown above. Costs under $100 are shown as not listed, because filers often enter $0 or $1 when no cost is required.

All permits at 10950 E Elliot Rd

Mesa Development Services last updated its data Oct 1, 2026. We checked it 2026-10-02 04:56 UTC. Official data.