Nearby Permits

Permit is only for installation of one solaredge energy bank 10kwh battery and a 225-amp main panel upgrade

Electrical at 649 S Hobson, Mesa

Mesa Development Services permit PMT25-05687: opened Mar 31, 2025 for electrical work at 649 S Hobson. Permit is only for installation of one solaredge energy bank 10kwh battery and a 225-amp main panel upgrade. All work to be performed per 2018 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your scope of work. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. Ref addenda pmt25-05687a for main panel relocation.

Permit number
PMT25-05687
Opened
Type of work
Electrical
Status
Issued
Reported cost
Not listed
ZIP code
85204 (from the permit's location)
City's category
Electrical, Residential Permit
City's status
C of C Issued
Source
Mesa Development Services permit data (this record)

Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.

All permits at 649 S Hobson, and what's permitted nearby

Mesa Development Services updated its data Oct 6, 2026. We checked it Oct 7, 05:53 UTC. See the city's official records (City of Mesa).

For agents and scripts: This page as Markdown · JSON