1) Install 60A/240V EV charger circuit in existing 100A/240V Eaton panel located in the garage.2) Pipe 3/4"
Electrical at 4450 Monroe Ct, Naperville
City of Naperville permit RESD-0574-2024: issued Jan 7, 2025 for electrical work at 4450 Monroe Ct. 1) Install 60A/240V EV charger circuit in existing 100A/240V Eaton panel located in the garage.2) Pipe 3/4" steel conduit from existing Eaton panel to the Tesla Universal Wall Connector (provided by homeowner) to be located on the south wall of the garag.
- Permit number
- RESD-0574-2024
- Issued
- Type of work
- Electrical
- Status
- Expired
- Reported cost
- $650
- ZIP code
- 60564
- City's category
- Resd electric vehicle charging station, residential
- City's status
- Expired
- Source
- City of Naperville permit data (this record)
Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.
All permits at 4450 Monroe Ct, and what's permitted nearby
The newest permit in the city's data is from Sep 30, 2026, 8 days ago. Permits issued after that won't appear here until the city publishes them.
City of Naperville updated its data Oct 7, 2026. We checked it Oct 8, 12:04 UTC. See the city's official records.
For agents and scripts: This page as Markdown · JSON