Building permits in New York City 10021
Newest first.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 175 East 74 Street, Manhattan | Scaffold or sidewalk shed | Facade Inspection via Industrial Rope Access as shown on plans | – | |
| 1065 Lexington Avenue, Manhattan | Mechanical (HVAC) | Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | $7,000 | |
| 1065 Lexington Avenue, Manhattan | Scaffold or sidewalk shed | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | – | |
| 1065 Lexington Avenue, Manhattan | Scaffold or sidewalk shed | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | – | |
| 178 East 73 Street, Manhattan | Mechanical (HVAC) | Interior modification of existing hydronic heating system including replacement of radiators, install 4 unit heaters & associated piping, & reconnection of existing bathroom &… | – | |
| 210 East 73 Street, Manhattan | Alteration or repair | General construction to combine units 2E and 2F into one unit. | $305,000 | |
| 927 Fifth Avenue, Manhattan | Alteration or repair | Structural work filed in conjunction with apartment renovation of the 9th Floor. | $25,001 | |
| 149 East 73 Street, Manhattan | Alteration or repair | Herewith file plans for the interior renovation of Apt. 5B, work to include minor partition layout changes and new finishes, Total Apt. SF is 2400 SF; plumbing to be filed as a… | $300,000 | |
| 301 East 69 Street, Manhattan | Mechanical (HVAC) | Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. | $2,850,000 | |
| 301 East 69 Street, Manhattan | Alteration or repair | Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. | $2,850,000 | |
| 301 East 69 Street, Manhattan | Alteration or repair | Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. | $2,850,000 | |
| 301 East 69 Street, Manhattan | Mechanical (HVAC) | Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. | $2,850,000 | |
| 1 East 70 Street, Manhattan | Scaffold or sidewalk shed | Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy. | – | |
| 444 East 75 Street, Manhattan | Plumbing | Plumbing work in apartments occupying part of the third floor per plans filed herewith. No change to use, egress or occupancy under this application | $16,000 | |
| 444 East 75 Street, Manhattan | Alteration or repair | Combination and interior renovation of existing apartments occupying part of the 3rd floor. Per plans filed herewith. No change to use, egress or occupancy under this application. | $150,000 | |
| 132 East 72 Street, Manhattan | Scaffold or sidewalk shed | Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code… | $1,000 | |
| 927 5 Avenue, Manhattan | Alteration or repair | Replacement in kind of two double hung windows in the living room. Replacement of two existing bay windows with new double hung windows in the kitchen to match building standard… | $167,747 | |
| 203 East 69 Street, Manhattan | Scaffold or sidewalk shed | IRA to assist with Condition Assessment. | – | |
| 245 East 72 Street, Manhattan | Alteration or repair | Conversion of existing storage rm to tenant recreation rm in cellar. Conversion of existing office to residential apartment on first floor. | $95,000 | |
| 10 East 76 Street, Manhattan | Alteration or repair | Interior renovation of an existing multiple dwelling. No change to use, occupancy or egress under this application. | $500,000 | |
| 35 East 75 Street, Manhattan | Alteration or repair | Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl (apt combination of suite 11 d & e). Supersede application #… | $284,625 | |
| 812 Park Avenue, Manhattan | Scaffold or sidewalk shed | File suspended scaffold outrigger systems for facade restoration and inspection. | – | |
| 3 East 69 Street, Manhattan | Mechanical (HVAC) | Mechanical work in conjunction with the duplex apartment renovation of apt 3/4c to include new thru-wall ac units. No change in use, occupancy, or egress. | $30,000 | |
| 12 East 69 Street, Manhattan | Mechanical (HVAC) | Installation of temporary system scaffold stair tower as per plan. No change in use, egress or occupancy. | $1,000 | |
| 422 East 72 Street, Manhattan | Alteration or repair | Facade repairs as per plans been filled herewith. | $1,300,000 |
NYC Department of Buildings last updated its data Oct 1, 2026. We checked it 2026-10-01 22:59 UTC. Official data.