Skip map
Map preview
Open mapBack to list
- Searched address
- New building
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
1 Harborside Dr
Boston, MA 02128
200 permits on record here. The newest, Sep 15: Electrical scope associated with connecting terminal a to terminal b. Within a quarter mile, the city has issued 10 more permits (9 projects) since May 1.
Within
Since
Here200 permits · 1 Harborside Dr
-
Sep 15$6,000,000
-
Sep 9$6,650
-
Terminal E TA-4 & TA-5 Urban Umbrella Installing conduit and and wire for lights and heatersElectricalAug 31$250,000
-
Aug 25$7,880
-
MASSPORT Demo unused receptaclesElectricalAug 13$24,175
-
Aug 7$88,540
-
Aug 5$10,000
-
Aug 5$10,000
-
Jul 23$96,435
-
Jul 2$8,375
-
Logan Airport - L1773-C3 SatteliteElectricalJul 1$18,300
-
May 15$124,670
-
Apr 30$93,765
-
Massport CHP Boiler 3 ReplacementElectricalApr 29$168,320
-
Apr 28$5,000
-
Apr 24$10,639
-
Apr 16$514,375
-
Apr 10$2,500
-
Apr 1$70,000
-
Apr 1$170,000
-
Mar 23$7,000
-
Feb 24$124,000
-
Jan 14 to 15$2,450,000
-
Jan 14$50,000
-
Logan Terminal E Chick-Fil-AElectricalJan 9$28,545
-
Jan 7$1,735
-
Dec 22, 2025$50,000
-
Dec 22, 2025$50,000
-
Dec 22, 2025$10,000
-
Dec 22, 2025$10,000
-
Logan Airport, Terminal C2E Modernization - C3 Club Misc.Low Voltage HVAC Control Wiring KG-253826ElectricalDec 22, 2025$200,000
-
Dec 9, 2025$136,590
-
Dec 4, 2025$200,000
-
Dec 3, 2025$500,000
-
Dec 2, 2025$40,000
-
Dec 2, 2025$50,000
-
Dec 2, 2025$60,000
-
Dec 2, 2025$8,745,000
-
Terminal C Airside: Remove and store 1 high mast light pole and modify an existing emergency fuel shut-off… × 2 permitsElectricalOct 27, 2025 to Dec 1, 2025$260,000
-
Nov 14, 2025$100,000
-
Logan, FedEx DX SystemElectricalOct 21, 2025$5,640
-
Sep 30, 2025$25,220
-
Sep 3, 2025$6,000
-
Aug 27, 2025$15,000
-
Install new 600A feed from existing switchboard to outdoor power house for construction siteElectricalJul 31, 2025$64,000
-
Provide preventative maintenanceElectricalJun 24, 2025$334,433
-
Jun 17, 2025$200,000
-
Jun 16, 2025$80,000
-
Apr 8, 2025$5,000
-
Apr 8, 2025$32,000
-
Massport LOC - Misc RenovationsElectricalApr 2, 2025$3,640
-
Jan 30, 2025$20,000
-
Jan 30, 2025$25,000
-
Jan 30, 2025$50,000
-
E24094 MPA Delta OPPS fitoutElectricalDec 9, 2024$160,000
-
Nov 26, 2024$50,000
-
Nov 25, 2024$1,500
-
Nov 14, 2024$50,000
-
Nov 7, 2024$185,000
-
Oct 1, 2024$24,664
-
Sep 23, 2024$8,000
-
Massport LOC Fitness CenterElectricalSep 16, 2024$3,995
-
Sep 9, 2024$1,000
-
Aug 21, 2024$2,500
-
Jul 15, 2024$5,000
-
Tell Data - for fitness center remodelElectricalJul 11, 2024$10,000
-
Jul 11, 2024$45,000
-
Jul 11, 2024$120,000
-
Apr 30, 2024$178,200
-
Apr 26, 2024$1,000
-
Apr 12, 2024$480,000
-
Mar 4, 2024$2,000
-
Oct 23, 2023$900
-
Refeeding two new garage doorsElectricalSep 7, 2023$82,000
-
E22078 MPA 1 Harborside Phase 2ElectricalJul 26, 2023$30,000
-
Refresh for duty free storeElectricalJul 10, 2023$4,000
-
Remove 144 existing light fixtures from hangar ceiling and install 144 new LED light fixturesElectricalApr 11, 2023$55,000
-
Legal Seafood Terminal A, Space #23ElectricalApr 5, 2023$3,500
-
Terminal E, Space E3-A54ElectricalMar 16, 2023$17,865
-
Terminal E (Expansion) Space E3-A28ElectricalMar 16, 2023$7,600
-
Terminal E (Expansion) Space E3-A28Fire systemsMar 16, 2023$6,865
-
Mar 1, 2023$1,200
-
Mar 1, 2023$27,500
-
Terminal C, Pier B, Space CB2-A10ElectricalMar 1, 2023$3,500
-
Terminal C, Pier B, Space CB2-A10Fire systemsMar 1, 2023$8,900
-
Oct 31, 2022$12,441
-
E11078 1 panelboard, 1 transformerElectricalSep 15, 2022$94,000
-
Jun 6, 2022$20,000
-
May 10, 2021$4,000
-
Dec 15, 2020$7,650
-
Dec 14, 2020$2,800
-
Demo old existing panel replace with new panel 277/480/ 150 amps at Delta cargo area terminal AElectricalDec 11, 2020$1,800
-
Oct 28, 2020$1,475
-
Oct 21, 2020$100,000
-
Installation of 240/120V 200A temporary electrical service for general site construction powerElectricalSep 21, 2020$2,500
-
Aug 13, 2020$32,000
-
Installation of BA security devices at Chase Bank 1 Harborside Dr Boston MA 02128 (8-61375-01)ElectricalJun 19, 2020$2,102
-
Installation of underground conduitElectricalJun 11, 2020$42,300
-
Install Temporary Power equipmentElectricalApr 2, 2020$250,000
-
Apr 2, 2020$2,300,000
-
Mar 11, 2020$500
-
Jan 23, 2020$7,500
-
Jan 10, 2020$16,000
-
Dec 6, 2019$20,000
-
Nov 19, 2019$1,080
-
Nov 19, 2019$1,080
-
Nov 8, 2019$800
-
Oct 30, 2019$302,000
-
Oct 23, 2019$30,000
-
Oct 23, 2019$3,500
-
Install (6) car 6 location consisting of (2) cat 6 cable in each location for 3rd fl garage entranceElectricalOct 18, 2019$7,500
-
Low voltageElectricalOct 18, 2019$6,500
-
Oct 18, 2019$5,000
-
Oct 18, 2019$6,500
-
Oct 18, 2019$60,000
-
Oct 18, 2019$100,000
-
Oct 15, 2019$18,000
-
Oct 3, 2019$2,500
-
Oct 1, 2019$50,000
-
Sep 12, 2019$10,000
-
Aug 20, 2019$10,000
-
Second floor renovation of the LOC projectFire systemsAug 13, 2019$10,000
-
Aug 13, 2019$80,000
-
Installation of underground duct bankElectricalAug 12, 2019$283,000
-
Aug 8, 2019$12,000
-
Jun 26, 2019$10,000
-
Fire Alarm for office renovationFire systemsJun 17, 2019$10,000
-
Electrical work for office renovationElectricalJun 17, 2019$50,000
-
Install 14) cat 6 locations consisting of (3) cat 6 cables in each location @ Logan office CenterElectricalJun 13, 2019$7,200
-
Jun 6, 2019$10,000
-
Wire radios for new antennasElectricalJun 6, 2019$2,000
-
HVAC & lighting upgradeElectricalApr 18, 2019$255,000
-
Apr 5, 2019$10,000
-
Mar 21, 2019$1,200
-
Mar 18, 2019$5,000
-
Power and data (EMT sleeves only) for (10) ticket kiosks locations at terminal A Delta airlinesElectricalMar 18, 2019$18,000
-
Mar 13, 2019$30,000
-
Feb 27, 2019$20,000
-
Feb 27, 2019$175,000
-
Feb 26, 2019$3,000
-
Feb 15, 2019$5,000
-
Feb 6, 2019$10,000
-
Jan 25, 2019$8,000
-
Installation of Cat6 cableElectricalJan 16, 2019$4,000
-
18-1141. Small retail marketElectricalJan 14, 2019$75,000
-
Jan 14, 2019$1,000
-
Dec 20, 2018$18,000
-
Dec 13, 2018$10,000
-
Dec 12, 2018$2,000
-
Install new 5KV switch, panel boardElectricalNov 28, 2018$176,035
-
Replace like for like water heaterElectricalNov 20, 2018$1,000
-
RestaurantPlumbingNov 1, 2018$10,000
-
Renovation of retail space at Terminal CElectricalNov 1, 2018$30,120
-
Install new Cat 6 for 5 POS locationsElectricalOct 31, 2018$2,800
-
Oct 31, 2018$8,400
-
Oct 31, 2018$90,000
-
Oct 29, 2018$680
-
Renovation of existing space Terminal CElectricalOct 29, 2018$4,230
-
Renovation of existing space, Terminal CFire systemsOct 29, 2018$13,060
-
Renovation of existing space Terminal C Pier B space CB2-A19 to new Dunkin Donuts restaurantElectricalOct 29, 2018$72,220
-
Oct 22, 2018$64,000
-
Office cubicles wiringElectricalOct 22, 2018$5,000
-
Oct 11, 2018$45,000
-
Oct 11, 2018$50,000
-
Oct 10, 2018$9,979
-
Remodel second floor bid roomElectricalOct 2, 2018$18,000
-
Sep 19, 2018$300,000
-
Modifications to the Delta Glycol systemElectricalSep 5, 2018$27,000
-
Aug 29, 2018$725,000
-
Aug 13, 2018$1,000
-
Aug 7, 2018$10,000
-
Aug 7, 2018$67,300
-
Jul 20, 2018$40,000
-
Jul 20, 2018$50,000
-
Wire cubicles on third floorElectricalJun 5, 2018$4,000
-
May 31, 2018$30,000
-
18-377 Hudson NewsFire systemsMay 22, 2018$5,000
-
18-378 5th and SunsetFire systemsMay 22, 2018$5,000
-
18-377 Hudson NewsElectricalMay 22, 2018$45,000
-
18-378 5th and SunsetElectricalMay 22, 2018$45,000
-
May 14, 2018$30,000
-
Apr 30, 2018$200,000
-
Apr 19, 2018$800
-
Apr 2, 2018$61,000
-
Mar 21, 2018$5,500
-
Relocation of 3 existing Horn StrobesFire systemsMar 15, 2018$6,000
-
Renovation to an existing CafeElectricalMar 15, 2018$89,000
-
Add one in duct detector and remote test station for new roof top energy recover unit (ERU-1)Fire systemsMar 6, 2018$7,500
-
Annual MaintenanceElectricalMar 6, 2018not listed
-
Installation of Cat6 cableElectricalFeb 8, 2018$1,800
-
Installation of Cat6 cable and jacksElectricalFeb 8, 2018$2,500
-
Feb 2, 2018$56,000
-
Massport - United Term B - IT RoomElectricalJan 23, 2018$10,500
-
Nov 27, 2017$3,300
-
Selective demolition, constructionElectricalNov 3, 2017$173,400
-
Runway 4R-22L RehabilitationElectricalOct 26, 2017$5,000
Sort
Within a quarter mile1,000 ft to ¼ mi · 10 permits in 9 projects
-
L26504-100 MPA Terminal A Run a dual location to bag claims 1-4100 Terminal Rd · 0.21 mi E · ElectricalAug 24$5,000
-
Disconnect and remove power from 30 existing check in kiosks × 2 permits100 Terminal Rd · 0.21 mi E · ElectricalJul 21$105,000
-
Roof replacement, no structural changes25 Jeffries St · 0.23 mi NW · RoofingJul 10$12,687
-
Install 9 replacement windows - no structural work56 Jeffries St · 0.23 mi W · Alteration or repairJun 26$9,000
-
Adding power outlets for new displays located in Terminal A Bag Claim100 Terminal Rd · 0.21 mi E · ElectricalJun 23$80,000
-
Add 2 FA AV devices - Terminal A Satellite - 1st floor100 Terminal Rd · 0.21 mi E · Fire systemsMay 15$10,000
-
Replace existing lighting - Terminal A Satellite - 1st floor100 Terminal Rd · 0.21 mi E · ElectricalMay 15$40,000
-
Fire Alarm for Alaska Air build out of offices and customer service stations @Terminal A - Pier B - Levels 1…100 Terminal Rd · 0.21 mi E · Fire systemsMay 12$45,000
-
Power, lighting for Alaska Air build out of offices and customer service stations @ Terminal B - Pier B…100 Terminal Rd · 0.21 mi E · ElectricalMay 12$200,000
Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 12:37 UTC. Official data.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near