Nearby Permits
Map of 65 permits and 1 zoning request within a quarter mile of 12 Tyndale StAlteration or repair, 125 Durnell Av, Oct 7, 2026Plumbing, 3 Newburg St, Oct 7, 2026Alteration or repair, 77 Fletcher St, Oct 1, 2026Plumbing, 951 South St, Sep 30, 2026Plumbing, 951 South St, Sep 30, 2026Electrical, 27 Ainsworth St, Sep 30, 2026Electrical, 56 Tyndale St, Sep 25, 2026Alteration or repair, 85 Belgrade Av, Sep 24, 2026Electrical, 19-21 Fresno St, Sep 23, 2026Alteration or repair, 11 Orange St, Sep 22, 2026Mechanical (HVAC), 27 Ainsworth St, Sep 22, 2026Solar, 11 Metcalf St, Sep 22, 2026Electrical, 18-20 Fresno St, Sep 22, 2026Plumbing, 72 Walworth St, Sep 18, 2026Electrical, 14 Farquhar St, Sep 17, 2026Solar, 11 Metcalf St, Sep 16, 2026Electrical, 85 Robert St, Sep 14, 2026Alteration or repair, 1 Colberg Av, Sep 3, 2026Electrical, 11 Metcalf St, Sep 2, 2026Demolition, 19-21 Fresno St, Aug 25, 2026Electrical, 24 Newburg St, Aug 25, 2026Alteration or repair, 198-200 Belgrade Av, Aug 24, 2026Alteration or repair, 103 Belgrade Av, Aug 17, 2026Electrical, 21 Walworth St, Aug 12, 2026Alteration or repair, 103 Belgrade Av, Aug 7, 2026Fire systems, 35 Ainsworth St, Jul 31, 2026Alteration or repair, 140 Belgrade Av, Jul 29, 2026Alteration or repair, 4 Hillock St, Jul 23, 2026Electrical, 17 Metcalf St, Jul 18, 2026Alteration or repair, 85 Robert St, Jul 15, 2026Electrical, 869-871 South St, Jul 14, 2026Electrical, 35 Ainsworth St, Jul 10, 2026Plumbing, 16-18 Bradfield Av, Jul 9, 2026Plumbing, 35 Ainsworth St, Jul 7, 2026Alteration or repair, 42 S Fairview St, Jun 29, 2026Electrical, 16-18 Bradfield Av, Jun 28, 2026Plumbing, 75 Congreve St, Jun 26, 2026Alteration or repair, 136 Belgrade Av, Jun 23, 2026Alteration or repair, 100 Tyndale St, Jun 19, 2026Plumbing, 52 Fletcher St, Jun 16, 2026Plumbing, 52 Fletcher St, Jun 15, 2026Alteration or repair, 35 Ainsworth St, Jun 15, 2026Plumbing, 24 Newburg St, Jun 13, 2026Plumbing, 24 Newburg St, Jun 13, 2026Plumbing, 42 S Fairview St, Jun 12, 2026Roofing, 14 Farquhar St, Jun 10, 2026Alteration or repair, 951 South St, Jun 10, 2026Plumbing, 72-74 Durnell Av, Jun 10, 2026Electrical, 24 Newburg St, Jun 6, 2026Plumbing, 72-74 Durnell Av, Jun 4, 2026Alteration or repair, 100 Walworth St, Jun 3, 2026Alteration or repair, 48 Bradfield Av, May 31, 2026Alteration or repair, 52 Fletcher St, May 29, 2026Plumbing, 20 Aldrich St, May 22, 2026Plumbing, 20 Aldrich St, May 22, 2026Electrical, 52 Fletcher St, May 21, 2026Addition, 52 Aldrich St, May 19, 2026Plumbing, 49 Penfield St, May 15, 2026Electrical, 49 Penfield St, May 15, 2026Plumbing, 29 Pinehurst St, May 8, 2026Fire systems, 951 South St, May 5, 2026Electrical, 67 Robert St, May 5, 2026Electrical, 29 Pinehurst St, May 3, 2026Alteration or repair, 49 Penfield St, May 1, 2026New building, 19-21 Fresno St, Aug 26, 2026Zoning request · Hearing date Sep 22 · 86 Walworth St · Zoning appeal: "Proposed addition and change of use from existing 2.5 story two family residence to 6 unit…"660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Zoning request

12 Tyndale St

Boston, MA 02131

At this address
4 permits on record. Newest issued Sep 10, 2025: Asphalt shingles replacement on both sections of mansard
Within ¼ mile
65 more permits (63 projects) issued since May 1. One is for a new building, 0.21 mi away.
Teardown, rebuild
19-21 Fresno St: demolition permitted Aug 25, a new building Aug 26.
MayJunJulAugSepOct
Here4 permits · 12 Tyndale St
  1. Sep 10, 2025$10,299
  2. Jan 14, 2016$16,500
  3. Dec 16, 2015$10,000
  4. May 29, 2013$21,694
Next doorunder 250 ft · 1 permit
  1. Aug 12$1,336
This block250 to 1,000 ft · 42 permits in 40 projects
  1. Retest 1st & 2nd floor
    3 Newburg St · 480 ft SW · Plumbing
    Oct 7$1,700
  2. Sep 30$25,000
  3. Sep 30$6,000
  4. Sep 30$9,000
  5. Sep 25$2,000
  6. Sep 22$32,800
  7. Sep 22$72,000
  8. Sep 16 to 22$107,962
  9. Sep 18$500
  10. Sep 17$2,000
  11. Sep 14$3,800
  12. Sep 3$8,384
  13. Sep 2$8,200
  14. Aug 25$4,800
  15. Repair store front
    198-200 Belgrade Av · 580 ft SW · Alteration or repair
    Aug 24$74,800
  16. Insulate walls, Unit #1
    103 Belgrade Av · 800 ft E · Alteration or repair
    Aug 17$4,341
  17. Aug 7$9,091
  18. Jul 29$6,224
  19. Jul 18$16,500
  20. Jul 15$77,500
  21. Jul 9$6,500
  22. Jun 28$3,000
  23. Jun 23$10,630
  24. Gas stove replacement
    52 Fletcher St · 930 ft N · Plumbing
    Jun 16$750
  25. Jun 15$2,500
  26. Jun 13$11,000
  27. Jun 13$1,000
  28. Jun 10$15,243
  29. Jun 10$320,000
  30. Jun 10$4,200
  31. Jun 6$7,500
  32. Jun 4$4,200
  33. May 31$65,146
  34. Kitchen remodel Labor and assembly
    52 Fletcher St · 930 ft N · Alteration or repair
    May 29$13,350
  35. Replacement of gas water heater × 2 permits
    20 Aldrich St · 770 ft SW · Plumbing
    May 22$2,232
  36. May 21$500
  37. Remodeling
    49 Penfield St · 980 ft SE · Plumbing
    May 15$1,000
  38. Laundry wiring
    49 Penfield St · 980 ft SE · Electrical
    May 15$2,500
  39. May 5$2,000
  40. May 1$66,750
Within a quarter mile1,000 ft to ¼ mi · 22 permits · 1 new building, $950,000
  1. Oct 7$377,200
  2. Install 13 replacement windows
    77 Fletcher St · 0.24 mi N · Alteration or repair
    Oct 1$10,710
  3. Sep 24$132,701
  4. Sep 23$50,000
  5. Dedicated Stove Circuit
    18-20 Fresno St · 0.22 mi S · Electrical
    Sep 22$1,285
  6. Aug 26$950,000
  7. Aug 25$35,000
  8. Jul 31$18,500
  9. Jul 23$2,500
  10. Jul 14$4,550
  11. Jul 10$28,600
  12. Jul 7$1,000
  13. Jun 29$19,231
  14. Irrigation install
    75 Congreve St · 0.24 mi NW · Plumbing
    Jun 26$600
  15. Insulate walls from interior
    100 Tyndale St · 0.22 mi W · Alteration or repair
    Jun 19$3,228
  16. Jun 15$50,000
  17. Jun 12$4,959
  18. Jun 3$4,243
  19. May 19$416,130
  20. May 8$1,400
  21. May 5$5,797
  22. May 3$6,500
Zoning requests nearby1 request · as of Oct 10

Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.

  1. Zoning appeal: "Proposed addition and change of use from existing 2.5 story two family residence to 6 unit…"
    86 Walworth St · 930 ft S · No decision posted · city: "Hearing Concluded" · case BOA1787126
    Hearing date Sep 22filed Oct 9, 2025
More on this streetTyndale St · 10 nearest addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits, zoning requests and hearing dates at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 9, 2026. We checked it Oct 10, 18:05 UTC. See the city's official records.

Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 10, 15:17 UTC.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning