Nearby Permits
Map of 66 permits within a quarter mile of 148 Central AvAlteration or repair, 15 Westminster St, Sep 28, 2026Roofing, 21 Park St, Sep 24, 2026Electrical, 700 Metropolitan Av, Sep 23, 2026Alteration or repair, 15 Elm St, Sep 22, 2026Solar, 8 Thatcher St, Sep 16, 2026Plumbing, 19 Thatcher St, Sep 15, 2026Plumbing, 19 Thatcher St, Sep 15, 2026Solar, 8 Thatcher St, Sep 14, 2026Alteration or repair, 706 Metropolitan Av, Sep 9, 2026Alteration or repair, 87 Arlington St, Sep 2, 2026Plumbing, 107 West St, Sep 2, 2026Plumbing, 107 West St, Aug 27, 2026Electrical, 107 West St, Aug 26, 2026Alteration or repair, 380 Huntington Av, Aug 24, 2026Alteration or repair, 105 Arlington St, Aug 21, 2026Alteration or repair, 35 Lexington Av, Aug 17, 2026Electrical, 10 Park St, Aug 14, 2026Alteration or repair, 40-40a Greenwood Av, Aug 14, 2026Electrical, 40-40a Greenwood Av, Aug 12, 2026Electrical, 415 Huntington Av, Aug 4, 2026Alteration or repair, 703 Metropolitan Av, Aug 4, 2026Alteration or repair, 105 Arlington St, Aug 3, 2026Alteration or repair, 17 Laval St, Jul 28, 2026Electrical, 380 Huntington Av, Jul 23, 2026Fire systems, 132 Central Av, Jul 22, 2026Alteration or repair, 25-27 Elm St, Jul 21, 2026Alteration or repair, 17 Laval St, Jul 21, 2026Roofing, 103 West St, Jul 20, 2026Plumbing, 132 Central Av, Jul 16, 2026Plumbing, 132 Central Av, Jul 16, 2026Solar, 40-40a Greenwood Av, Jul 8, 2026Plumbing, 34 Thatcher St, Jul 7, 2026Electrical, 125-127 West St, Jul 3, 2026Fire systems, 125-127 West St, Jul 3, 2026Electrical, 125-127 West St, Jul 3, 2026Alteration or repair, 415 Huntington Av, Jul 2, 2026Electrical, 131 West St, Jul 1, 2026Solar, 131 West St, Jun 26, 2026Electrical, 1070-1080 Hyde Park Av, Jun 26, 2026Electrical, 59 Greenwood Av, Jun 26, 2026Alteration or repair, 132 Westminster St, Jun 24, 2026Alteration or repair, 59 Greenwood Av, Jun 23, 2026Alteration or repair, 132 Westminster St, Jun 17, 2026Alteration or repair, 125-127 West St, Jun 12, 2026Alteration or repair, 93-103 Arlington St, Jun 10, 2026Roofing, 59 Greenwood Av, Jun 10, 2026Solar, 131 West St, Jun 10, 2026Mechanical (HVAC), 1101 Hyde Park Av, Jun 8, 2026Alteration or repair, 88 Arlington St, Jun 5, 2026Alteration or repair, 34 Thatcher St, Jun 2, 2026Alteration or repair, 107 West St, Jun 2, 2026Solar, 5 Manion Rd, Jun 2, 2026Electrical, 93-103 Arlington St, Jun 2, 2026Solar, 40-40a Greenwood Av, May 26, 2026Solar, 68 Arlington St, May 20, 2026Solar, 68 Arlington St, May 20, 2026Solar, 9 Lockwood St, May 18, 2026Electrical, 1101 Hyde Park Av, May 15, 2026Alteration or repair, 3-5 Thatcher St, May 14, 2026Roofing, 87 Arlington St, May 12, 2026Plumbing, 88 Arlington St, May 7, 2026Electrical, 1098-1100 Hyde Park Av, May 4, 2026Alteration or repair, 34 Thatcher St, May 1, 2026New building, 57 Thatcher St, Sep 17, 2026New building, 704 Metropolitan Av, Sep 16, 2026New building, 132 Central Av, Jul 14, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade

148 Central Av

Boston, MA 02136

The biggest project within a quarter mile since May 1: a $1.4M new building at 704 Metropolitan Av, permitted Sep 16.

Two permits on record here. The newest, Jul 28, 2025: Remove and replace crumbling front porch. Within a quarter mile, the city has issued 66 more permits (62 projects) since May 1. Three are for new buildings, the nearest 310 ft away.

MayJunJulAugSepOct
Here2 permits · 148 Central Av
  1. Jul 28, 2025$10,000
  2. Apr 1, 2021$1,000
This block250 to 1,000 ft · 37 permits in 36 projects · 2 new buildings, $1.4M
  1. Sep 24$22,000
  2. Sep 23$10,000
  3. Sep 16$1,385,000
  4. Sep 15$5,500
  5. Sep 15$5,500
  6. Sep 9$1,000
  7. Sep 2$31,505
  8. Residential weatherization/air sealing
    380 Huntington Av · 950 ft NE · Alteration or repair
    Aug 24$5,000
  9. Weatherization, Insulation, Air Sealing
    105 Arlington St · 600 ft SW · Alteration or repair
    Aug 21$4,943
  10. Aug 17not listed
  11. Aug 14$3,000
  12. Aug 14not listed
  13. Aug 12$2,000
  14. Aug 4$850
  15. Aug 4$3,630
  16. Aug 3not listed
  17. Jul 28$33,726
  18. Jul 23$10,145
  19. Wire fire alarm
    132 Central Av · 310 ft S · Fire systems
    Jul 22$2,500
  20. Jul 21not listed
  21. Jul 16$14,600
  22. Water heaters Stove
    132 Central Av · 310 ft S · Plumbing
    Jul 16$6,800
  23. Wire 4 units
    132 Central Av · 310 ft S · New building
    Jul 14$50,000
  24. May 26 to Jul 8$66,411
  25. Jul 2$23,980
  26. Jun 26$7,500
  27. Jun 26$6,000
  28. Jun 23not listed
  29. Front and back deck replacement
    93-103 Arlington St · 570 ft S · Alteration or repair
    Jun 10$39,500
  30. Jun 10$2,800
  31. Jun 5$30,711
  32. Jun 2$700
  33. May 18$55,461
  34. May 14$9,000
  35. Replace roof
    87 Arlington St · 590 ft S · Roofing
    May 12$37,835
  36. May 7$4,959
Within a quarter mile1,000 ft to ¼ mi · 29 permits in 26 projects · 1 new building, $350,000
  1. Sep 28$21,000
  2. Sep 22$12,179
  3. Sep 17$350,000
  4. Sep 14 to 16$80,100
  5. Sep 2$20,000
  6. Aug 27$6,000
  7. Aug 26$29,000
  8. Removing and replacing 2 windows
    25-27 Elm St · 0.23 mi S · Alteration or repair
    Jul 21$2,430
  9. Strip and re-roof
    103 West St · 0.22 mi SW · Roofing
    Jul 20$13,000
  10. Jul 7$12,000
  11. Low voltage wiring
    125-127 West St · 0.22 mi SW · Electrical
    Jul 3$1,000
  12. Hardwired smoke detectors
    125-127 West St · 0.22 mi SW · Fire systems
    Jul 3$1,000
  13. Jul 3$20,000
  14. Jul 1$4,000
  15. Jun 10 to 26$119,100
  16. Siding
    132 Westminster St · 0.20 mi NE · Alteration or repair
    Jun 24$26,000
  17. Jun 17$13,500
  18. Jun 12$650,000
  19. Jun 8$17,750
  20. Jun 2$16,000
  21. Jun 2$130,000
  22. Jun 2$499
  23. May 20$41,400
  24. May 15$2,000
  25. May 4$4,000
  26. May 1not listed

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 16:23 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near