Skip map
Map preview
Open mapBack to list
- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Paperwork or other
197 Eighth St
Boston, MA 02129
200 permits on record here. The newest, Sep 16: In apt 232 upgrade bath lights and reccesses lights throut out the unit. Within a quarter mile, the city has issued 25 more permits since May 1.
Within
Since
Here200 permits · 197 Eighth St
-
Sep 16$5,500
-
Sep 16$7,000
-
Installing new tub in bathroomPlumbingAug 13$2,200
-
Aug 13$1,800
-
Remodel a bathroom no changes and changing the floorUnit 232Alteration or repairAug 11$79,960
-
Remodel bathroon no changes and akitchen as well no changes and refinishing the harwood floorAlteration or repairAug 11$77,430
-
Install shower stall in unit 506PlumbingAug 4$1,200
-
Jun 18not listed
-
Remodel, installing nrw fixturesPlumbingJun 1$2,000
-
Replace tub to showerPlumbingMay 1$1,500
-
Removal of bath tub and installation of stand up shower unit 506Alteration or repairApr 22$13,980
-
Remove existing bathtub & wall surround to be replaced with new walk in shower & wall surround & a new vanityAlteration or repairApr 22$19,500
-
Apr 17$10,780
-
Mar 24$1,900
-
Mar 24$4,500
-
Removal of existing kitchen cabinets counter top and replace them with new ones bring electrical up to code…Alteration or repairMar 13$128,000
-
Feb 26$5,500
-
Feb 2$2,800
-
Remodel the kitchen and and master bathroom removal of existing harwood floo and replaced with new one unit…Alteration or repairJan 28$138,140
-
Removal of bath tub to accomodate the installation of stand up shower removal of tiles surranding the wet…Alteration or repairOct 24, 2025$18,740
-
Oct 23, 2025$2,200
-
Sep 25, 2025$5,000
-
Sep 9, 2025$6,000
-
Flagship Boiler ReplacementElectricalAug 28, 2025$80,000
-
Tub to shower conversion in 6th floor bathroom unit #625Alteration or repairAug 27, 2025$24,613
-
Aug 27, 2025$4,000
-
Renovation of two bathAlteration or repairAug 26, 2025$56,858
-
Bathroom renoElectricalAug 26, 2025$3,500
-
Aug 20, 2025$20,000
-
Aug 20, 2025$20,000
-
Jul 31, 2025$8,500
-
Jul 28, 2025$16,500
-
2 Bed/2 Bath condo renovationElectricalJul 21, 2025$15,000
-
Jun 23, 2025$2,500
-
This is for unit #615Alteration or repairJun 6, 2025$297,328
-
Removal of kitchen cabinets and hang new kitchen cabinets demolition of bathroom and installation of new…Alteration or repairMay 22, 2025$108,590
-
May 22, 2025$4,500
-
May 13, 2025$1,900
-
Remodel the master bathroom removal the toilet vanity and standup shower removal of existing flooring and…Alteration or repairApr 8, 2025$124,600
-
Apr 8, 2025$10,780
-
Mar 3, 2025$5,500
-
Feb 12, 2025$2,500
-
Jan 6, 2025$5,500
-
Dec 27, 2024$11,500
-
Relocate eixistig island exchange all of interior door and baseboards build a partition wall on the foyer to…Alteration or repairDec 24, 2024$125,440
-
Full apartment remodelingAlteration or repairDec 18, 2024$81,800
-
Oct 18, 2024$1,200
-
Remove section of partition wall and relocate electrical as neededAlteration or repairOct 1, 2024$16,895
-
Sep 23, 2024$5,600
-
Sep 16, 2024$2,700
-
Sep 10, 2024$15,000
-
Removal of kitchen cabinets hardwood floor installation of new kitchen cabinets and installation of new tie…Alteration or repairJul 25, 2024$84,678
-
Apr 16, 2024$8,680
-
Feb 14, 2024$1,250
-
Feb 14, 2024$3,000
-
Kitchen/bath/laundry renoPlumbingFeb 8, 2024$5,000
-
Feb 5, 2024$40,000
-
Feb 1, 2024$2,000
-
Remodel a bathroom removal of bath tub toilet vanity and drywall and tile surronding bath tub installation of…Alteration or repairJan 12, 2024$29,800
-
Replace Kitchen cabinets, replace flooring in unitAlteration or repairNov 6, 2023$93,200
-
Unit 801/802 - Interior renovation of existing unitAlteration or repairOct 26, 2023$1,208,850
-
Oct 20, 2023$3,000
-
In the apt 420ElectricalAug 2, 2023$4,500
-
Jul 13, 2023$2,000
-
In ph10 upgrade 3 bathrooms and kitchenElectricalJun 20, 2023$8,500
-
May 10, 2023$3,500
-
Remodel of master bathroom and kitchen removal of kitchen cabinets dishwasher fridge and tile and drywall…Alteration or repairApr 20, 2023$74,980
-
Remodel master bath and guest bath removal bathtub vanity toilet and tile installation bath tub toilet vanity…Alteration or repairMar 30, 2023$48,960
-
Removal of kitchen cabinets installation of new kitchen remodel master bath no changes remodel guest bath no…Alteration or repairMar 30, 2023$182,980
-
Unit#510 (5th. floor): Run within unitElectricalFeb 17, 2023$1,200
-
Feb 17, 2023$17,400
-
Dec 20, 2022$4,000
-
Remove and reinstall kitchen cabinetry/counters (same layout)Alteration or repairDec 8, 2022$97,200
-
Dec 1, 2022$1,200
-
Install shower stallPlumbingNov 30, 2022$1,000
-
Work being done in unit 619PlumbingNov 30, 2022$6,000
-
Nov 7, 2022$8,000
-
Remodel a master bathroom and refinish hardwood floorAlteration or repairNov 3, 2022$47,830
-
Sep 20, 2022$950
-
Renovate master bath, replace tub with showerAlteration or repairSep 9, 2022$73,700
-
Installing new bathroomsPlumbingSep 9, 2022$2,000
-
Sep 9, 2022$2,000
-
Renovate both bathrooms and kitchenAlteration or repairAug 23, 2022$100,600
-
Removal of harwood floor installation of new engeenierd floor remodel of 2 bathrooms keeping existing vanitys…Alteration or repairAug 9, 2022$125,900
-
2 Full BathroomPlumbingAug 8, 2022$4,000
-
Jul 28, 2022$16,530
-
Remodel 2 batrroomns no changes of existing laid out removal of fixtures and drywall and tile installation of…Alteration or repairJun 28, 2022$40,885
-
Kitchen and 2 Bathroom RenovationAlteration or repairJun 1, 2022$15,000
-
Mar 28, 2022$26,500
-
Mar 28, 2022$2,700
-
Mar 11, 2022$2,400
-
Mar 10, 2022$29,000
-
Replace kitchen cabinets, appliancesAlteration or repairMar 8, 2022$138,800
-
Feb 10, 2022$7,000
-
Feb 8, 2022$3,800
-
New shower and vanity and toilet no rough new vanity and toilet no rough and new kitchen no roughPlumbingFeb 7, 2022$8,000
-
Feb 7, 2022$4,300
-
No structural workAlteration or repairJan 24, 2022$298,110
-
Kitchen reno \ bathroom renoElectricalJan 14, 2022$8,500
-
Bathrooms remodel, Demo, electric,plumbing, waterproofing, tileAlteration or repairJan 13, 2022$102,403
-
Remodel of kitchen and bathroom installation of new kitchen cabinets and flooring and tile the bathroom walls…Alteration or repairJan 12, 2022$43,550
-
Jan 12, 2022$10,000
-
Nov 23, 2021$3,500
-
Nov 12, 2021$800
-
Finish KitchenPlumbingNov 10, 2021$2,100
-
Nov 9, 2021$4,500
-
Remodel Master Kitchen and Master BathroomAlteration or repairNov 1, 2021$104,850
-
Remodel kitchenElectricalOct 19, 2021$5,000
-
Remdel 2 batrhooms and kitchen and replace flooringAlteration or repairOct 18, 2021$75,000
-
Installing new fixturesPlumbingOct 18, 2021$4,500
-
Renovate kitchen renovate master bathroom new tile floor in powder roomAlteration or repairOct 5, 2021$152,123
-
Sep 22, 2021$3,000
-
Renovation of Kitchen, Master Bath, and guest bathroomAlteration or repairSep 7, 2021$87,873
-
Jul 12, 2021 to Aug 10, 2021$1,500
-
Removal of existing kitchen cabinets and replaced same laid out and floor remodel of master bathroom and half…Alteration or repairJul 23, 2021$70,000
-
Jul 22, 2021$5,000
-
PH 17 Kitchen Upgrades, New Flooring, paintingAlteration or repairJun 18, 2021$98,137
-
Renovation of the one level residenceAlteration or repairJun 10, 2021$164,400
-
Jun 8, 2021$2,400
-
Jun 7, 2021$5,000
-
Jun 7, 2021$40,852
-
This includes partial demolition of kitchen baseboards and floor in the entirety of the condominiumAlteration or repairMay 18, 2021$78,000
-
Apr 21, 2021$10,000
-
Kitchen renovation / bar areaFire systemsApr 15, 2021$7,500
-
Relocate panel to other side of wallElectricalApr 8, 2021$20,000
-
Replace all existing conventional smoke/heat detector of the existing EST-3 fire alarm systemFire systemsMar 24, 2021$185,700
-
Unit 704. Renovate Kitchen &Alteration or repairMar 23, 2021$72,260
-
Kitchen remodelElectricalMar 22, 2021$2,700
-
Replace all existing conventional initiating/detection device of the EST-3 fire alarm system with new…Fire systemsMar 2, 2021$185,700
-
In unit PH 21Alteration or repairFeb 27, 2021$150,000
-
Renovation of an existing commercial office space for a new tenantAlteration or repairFeb 24, 2021$18,360
-
Install 2 new outlets for TVsElectricalFeb 22, 2021$500
-
Kitchen Remodel - master bath - vanityAlteration or repairDec 21, 2020$59,000
-
Kitchen renovation, laundry room lay-out changes and other interior carpentry and electric workAlteration or repairOct 28, 2020$40,000
-
Sep 29, 2020$6,000
-
Remodel 197 Eighth Street unit 612 with 23 recessed lights adding switching in kitchen and bathroomsElectricalSep 14, 2020$2,200
-
Remodel CondoElectricalAug 31, 2020$15,000
-
Aug 25, 2020$5,000
-
Renovation of the one level residenceAlteration or repairAug 24, 2020$144,900
-
Penthouse 2 renovationElectricalJul 28, 2020$19,000
-
Jul 23, 2020$468,299
-
Renovate (2) bathrooms and kitchenAlteration or repairJul 22, 2020$148,735
-
Renovate two story condo including: Existing kitchen and 3 bathsAlteration or repairJun 23, 2020$323,650
-
RenovationPlumbingJun 19, 2020$10,000
-
Kitchen remodel unit 404ElectricalJun 4, 2020$2,500
-
Mar 3, 2020$4,500
-
Mar 3, 2020$1,800
-
Bathroom and kitchen renovation on the third floor unitAlteration or repairFeb 6, 2020$6,000
-
Remodel kitchen, bath and living roomElectricalFeb 4, 2020$3,400
-
Jan 29, 2020$13,000
-
Demo and install new kitchen cabinets and counters no structural changesAlteration or repairJan 17, 2020$27,100
-
Jan 14, 2020$6,000
-
Bathroom Remodel Unit 722Alteration or repairJan 9, 2020$37,514
-
Renovation of single level residenceAlteration or repairJan 6, 2020$274,400
-
Update of condo;unit# 323 kitchenAlteration or repairJan 3, 2020$72,613
-
Dec 6, 2019$40,583
-
Nov 26, 2019$3,200
-
Remodel kitchenElectricalNov 26, 2019$4,000
-
Nov 18, 2019$5,000
-
Renovation of the one level residenceAlteration or repairNov 15, 2019$126,600
-
Nov 7, 2019$2,500
-
Oct 22, 2019$15,000
-
Replacement of 12 water sourced heat pumpsMechanical (HVAC)Oct 15, 2019$167,000
-
Unit 629 and 631: Interior Renovation of units 629 and 631Alteration or repairSep 10, 2019$150,904
-
Jul 24, 2019$500
-
Rough in kitchen to code old workElectricalJul 15, 2019$4,500
-
6th floor Unit # 605 Remove kitchen cabinetsAlteration or repairJun 14, 2019$44,150
-
May 31, 2019$8,500
-
May 30, 2019$4,000
-
Renovation of kitchen and 2 bathrooms in unit 205Alteration or repairApr 25, 2019$70,315
-
Kitchen RemodelElectricalMar 20, 2019$10,000
-
Mar 6, 2019$1,200
-
Renovate kitchen, tile floor, cabinetsAlteration or repairFeb 15, 2019$41,000
-
Kitchen and master bath renovationElectricalJan 15, 2019$9,000
-
Remodel bathroom, and kitchenPlumbingDec 30, 2018$10,000
-
Unit #625-Renovate existing kitchen and master bathroom including;removal of finishesAlteration or repairDec 19, 2018$200,858
-
Two bathroom remodel in unit 628ElectricalNov 20, 2018$4,000
-
Kitchen and Bathroom remodelElectricalOct 19, 2018$6,000
-
Confirm daycare/education use;as part of the occupancy.Alteration or repairOct 19, 2018$100
-
Bathroom remodel kitchen remodelPlumbingOct 17, 2018$5,000
-
Unit PH210: Replace cabinets and counters in existing kitchen (cabinetry supplied and installed by other)Alteration or repairSep 25, 2018$152,400
-
Sep 11, 2018$4,000
-
Using a temporary Van Mounted GeneratorElectricalAug 23, 2018$300
-
Bathroom renovationsPlumbingAug 22, 2018$5,000
-
Unit 628-General construction – interior-Hallway =plaster with demo-;Side room= demo with plaster…Alteration or repairJul 30, 2018$60,000
-
Jul 25, 2018$7,500
-
Power up nac panelElectricalJul 25, 2018$500
-
Installing steel framing for internal roomsAlteration or repairMay 21, 2018$1,500
-
May 21, 2018$2,000
-
Completely wiring on 1st floor academyElectricalMay 21, 2018$46,000
-
Furnish and install new drywall partitionsAlteration or repairApr 26, 2018$610,212
-
Mar 16, 2018$7,500
-
Add two sinks and ejectorPlumbingMar 14, 2018$3,500
-
Electrical demolitionElectricalMar 7, 2018$3,000
-
Feb 26, 2018$4,200
-
Remove and replace sealants around windows on Stack 07Alteration or repairFeb 15, 2018$41,911
-
Feb 13, 2018$12,000
-
Move partition walls according to plans provided by customerAlteration or repairFeb 7, 2018$30,000
-
Jan 29, 2018$7,500
Sort
This block250 to 1,000 ft · 22 permits
-
Remove and replace kitchen cabinets, countertops, appliances42 Eighth St · 470 ft NW · Alteration or repairSep 29$110,450
-
Renovation of existing common area bathrooms to increase fixture count and maintain ADA compliance1 First Av · 960 ft NW · Alteration or repairSep 28$205,000
-
Remodeling 3 bathrooms55 Constellation Wh · 540 ft NE · Alteration or repairSep 18$289,450
-
Work consiss only on a convertion of bath tub to a walk in shower7 Shipway Pl · 840 ft N · Alteration or repairSep 18$15,000
-
Replace tub to shower, lav and toilet3 Constellation Wh · 760 ft E · PlumbingSep 8$2,000
-
Demo existing hardwood floors in kitchen and dining room13 Constellation Wh · 780 ft E · Alteration or repairAug 27$9,500
-
Devices replacement on existing bathroom apartment 113 Constellation Wh · 760 ft E · ElectricalAug 25$1,500
-
Scope of work consists of the interior reconfiguration of an existing studio condominium unit into a…42 Eighth St · 470 ft NW · Alteration or repairAug 24$3,000
-
Related project under Permit SF18713293 Constellation Wh · 760 ft E · Alteration or repairAug 20$14,000
-
Renovated bathroom: Tub/shower, toilet and lav31 Constellation Wh · 610 ft E · PlumbingAug 5$2,000
-
Bathroom remodel full rewire apartment 113 Constellation Wh · 760 ft E · ElectricalAug 5$2,500
-
Wiring kitchen, bathroom 16 recessed lights add 4 receptacles42 Eighth St · 470 ft NW · ElectricalAug 4$6,000
-
Unit #3115 - Kitchen renovation42 Eighth St · 470 ft NW · PlumbingJul 22$1,000
-
Gas Range Replacement42 Eighth St · 470 ft NW · PlumbingJul 22$1,000
-
Master bathroom remodeling, no structural work3 Constellation Wh · 760 ft E · Alteration or repairJul 13$36,500
-
Post water damage renovation that includes stud repairs/new studs42 Eighth St · 470 ft NW · Alteration or repairJul 12$90,648
-
Installing a temporary weighted 10x10 frame tent with sliding walls on Pier 4 for Sail Boston3 Constellation Wh · 760 ft E · OtherJul 1$600
-
Install 1 patio door for replacement30 Shipway Pl · 880 ft N · Alteration or repairJun 5$14,592
-
Replace fixtures two bathrooms and kitchen31 Constellation Wh · 610 ft E · PlumbingMay 26$6,000
-
Unit 3212. Taking over from previous plumber42 Eighth St · 470 ft NW · PlumbingMay 21$1,500
-
Kitchen liv 2 bed 2 bathrooms and library remodel31 Constellation Wh · 610 ft E · ElectricalMay 20$8,000
-
Interior non-structural renovations31 Constellation Wh · 610 ft E · Alteration or repairMay 6$60,000
Within a quarter mile1,000 ft to ¼ mi · 3 permits
-
Installation of Fire Alarm1 Constitution Rd · 0.23 mi W · ElectricalSep 28$38,602
-
Renovations of existing tenant area Lighting1 Constitution Rd · 0.23 mi W · ElectricalAug 5$140,000
-
Provide temporary power for outdoor event utilizing portable diesel generator1 Constitution Rd · 0.23 mi W · ElectricalJul 21$500
Boston Inspectional Services Department updated its data Oct 2, 2026. We checked it Oct 3, 08:57 UTC. Official data.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near