267 Charles St
Boston, MA 02114
The biggest project within a quarter mile since May 1: a $2.6M alteration or repair at 1-2 Longfellow Pl, permitted Aug 31.
200 permits on record here. The newest, Oct 1: Renovation of existing CT suite associated with Building permit SF1903688 Ellison 2 Rm 230 & 230A. Within a quarter mile, the city has issued 173 more permits (170 projects) since May 1.
Within
Since
Here200 permits · 267 Charles St
-
Renovation of existing CT suite associated with Building permit SF1903688 Ellison 2 Rm 230 & 230AElectricalOct 1$50,250
-
Renovation of the CT Room, including the installation of new finishesAlteration or repairSep 30$594,244
-
Sep 24$20,000
-
Install drip pan with associated piping in Ellison Sub-Basement Fire Pump RoomAlteration or repairAug 20$98,717
-
Jul 31$4,000
-
Jul 31$32,000
-
Replacement of the chiller, installation of blocking and flashing at RTU curbsAlteration or repairJul 29$643,175
-
On Subbasement FloorFire systemsJul 17$14,000
-
Demo existing &Alteration or repairJul 13$1,041,665
-
Renovation of 2nd floor of Ellison Building - Phase 2 Renovating Existing MRI Associated Patient AreaFire systemsJul 7$4,500
-
Jul 7$61,000
-
Jun 1$3,000
-
Rewiring of new sprinkler riser devices in Ellison stair 2 No new devices are being installedElectricalJun 1$25,000
-
May 26$603,945
-
Ellison 5th floor mechanical roomElectricalApr 21$22,000
-
Add Floor Sink to Prep KitchenPlumbingFeb 20$12,500
-
Install low voltage Cat6A data cabling for 2nd floor renovation 25-00244-10 MGH Ellison 2 Reading RmElectricalFeb 12$3,400
-
Feb 3$63,000
-
24-0037-10 MGH Low VoltageElectricalDec 4, 2025$2,000
-
Dec 3, 2025$18,000
-
Renovation of an existing areaElectricalNov 25, 2025$17,000
-
Nov 25, 2025$8,500
-
Renovation of an existing pediatric fluoroscopy room with new MEPAlteration or repairNov 21, 2025$636,252
-
Renovation of existing reading roomAlteration or repairNov 14, 2025$200,042
-
Demolition of spaceElectricalOct 20, 2025$1,000
-
Sep 3, 2025$7,500
-
MGH Ellison - 18th Floor Patient RoomsElectricalSep 3, 2025$32,513
-
Aug 27, 2025$14,000
-
MGH Ellison - 17th Floor Patient RoomsElectricalAug 22, 2025$25,656
-
Demolition of spaceAlteration or repairAug 18, 2025$75,000
-
Aug 15, 2025$170,212
-
Renovation of Hospital MRIPlumbingJul 22, 2025$220,592
-
Jul 22, 2025$2,500
-
Renovation of 2nd floor of Ellison Building - Phase 1 Renovating Existing MRI Room and MRI Equipment AreaFire systemsJul 9, 2025$7,000
-
Jul 9, 2025$94,000
-
Jul 9, 2025$2,500
-
Renovation of an existing MRI room on the 2nd floor of the Ellison building at Massachusetts General HospitalAlteration or repairJun 16, 2025$2,500,000
-
May 27, 2025$13,500
-
May 12, 2025$15,000
-
Renovate a portion of Ellison 2nd Floor for new mobile equipmentAlteration or repairMay 9, 2025$159,729
-
Install new doors, frames and hardware in existing corridorsAlteration or repairMar 6, 2025$40,000
-
MGH Ellison 5 AHU Cross ConnectElectricalOct 22, 2024$44,615
-
MGH Ellison 14 Burn ICU RenoElectricalOct 11, 2024$7,500
-
Oct 2, 2024$10,000
-
Renovation to existing Fluoroscopy Rooms on the 2nd floor of the Ellison building at Massachusetts General…Alteration or repairSep 24, 2024$821,521
-
Sep 16, 2024$93,500
-
Sep 9, 2024$365,618
-
Replacing existing AHU unit on Ellison Level 5Alteration or repairJul 25, 2024$1,425,000
-
Jul 22, 2024$82,000
-
Jul 22, 2024$5,000
-
Jul 17, 2024$3,000
-
Ellison building 5th fl installing of fire alarmFire systemsJul 17, 2024$3,000
-
Jul 17, 2024$40,000
-
Jun 18, 2024$1,000
-
Jun 18, 2024$3,000
-
Jun 18, 2024$65,000
-
Replacing the medical vacuum pump and associated pipingAlteration or repairJun 13, 2024$1,000
-
Renovation of existing burn unit patient rooms to include new ICU rooms and renovated bathroomsAlteration or repairJun 11, 2024$1,446,761
-
Hospital Renovation of ICUPlumbingMay 22, 2024$288,000
-
Mar 22, 2024$10,000
-
Installation of water and sanitary piping in fluoroscopy unit to feed new fixtures × 2 permitsPlumbingFeb 21 to 26, 2024$115,000
-
Renovation of the existing Fluoro space on the second floor of the Ellison Building at MGHAlteration or repairJan 29, 2024$1,210,506
-
Jan 23, 2024$105,000
-
Jan 23, 2024$5,000
-
Phase 2 - Installing new hand sinks and toilets for new Procedure rooms and patient toilets (420300)PlumbingJan 22, 2024$500,000
-
Installation of patient lifts in Ellison Building 3rd FloorAlteration or repairSep 12, 2023$12,000
-
Renovation of existing area phase 2 & 2aFire systemsAug 4, 2023$20,000
-
Renovation of existing area Phase 2 & 2AElectricalAug 4, 2023$700,000
-
May 31, 2023$384,200
-
Installation of patient lifts in Ellison Building 3rd FloorAlteration or repairJan 10, 2023$200,833
-
Removal & replacement of architectural finishesAlteration or repairSep 2, 2022$136,683
-
Aug 16, 2022$196,000
-
Replacing existing Domestic Water Pump with newAlteration or repairJul 8, 2022$30,000
-
Jun 13, 2022$7,500
-
Jun 7, 2022$384,200
-
Mar 21, 2022$130,000
-
Mar 21, 2022$3,000
-
Mar 21, 2022$22,000
-
Feb 20, 2022$15,000
-
Renovation of existing areaElectricalFeb 20, 2022$60,000
-
Jan 28, 2022$384,200
-
Replace existing fire pump in Ellison building basementAlteration or repairJan 14, 2022$854,973
-
MGH Pediatric Unit ExpansionElectricalNov 4, 2021$2,500
-
Mass General Hospital - Ellison Bldg - 2nd FloorAlteration or repairOct 7, 2021$604,090
-
Sep 15, 2021$48,000
-
267 Charles Street- MGH Ellison 228 IR CT. Misc Low Voltage HVAC Control Wiring - JG - 219864ElectricalSep 10, 2021$1,200
-
Removal and replacement of existing architectural finishesAlteration or repairSep 7, 2021$604,090
-
Aug 11, 2021$20,000
-
Relocation of Ellison Bldg. ATSElectricalJun 17, 2021$300,000
-
May 14, 2021$35,000
-
May 14, 2021$15,000
-
Nov 23, 2020$3,000
-
Remove and replace existing flooring and baseAlteration or repairNov 16, 2020$37,900
-
Jun 9, 2020$7,000
-
Jun 9, 2020$16,000
-
MGH - Ellison 2 MRIAlteration or repairApr 13, 2020$1,266,588
-
Apr 10, 2020$2,000
-
Apr 10, 2020$217,000
-
Apr 10, 2020$2,000
-
Install (1) med gas head wall and associated piping for the MGH Ellison project on the 2nd floorPlumbingMar 20, 2020$12,000
-
MGH - Ellison Bldg - Pediatric Inpatient - Level 17 &Alteration or repairMar 16, 2020$819,898
-
Mar 13, 2020$1,000
-
Mar 13, 2020$8,000
-
Mar 13, 2020$5,000
-
Mar 13, 2020$140,000
-
Mar 9, 2020$100,000
-
Feb 20, 2020$4,000
-
MGH Bulk Oxygen - Renovation of the fire alarmFire systemsFeb 20, 2020$4,000
-
Feb 20, 2020$26,000
-
Install of mother's sinkPlumbingJan 23, 2020$5,000
-
Jan 23, 2020$150
-
Jan 6, 2020$5,000
-
Massachusetts General Hospital -;Blake / Ellison Bldg - 5th Floor -;Construct new Bulk Oxygen Storage Rooms…Alteration or repairDec 3, 2019$859,000
-
Installing Mother's SinkPlumbingNov 5, 2019$5,000
-
May 15, 2019$1,500
-
Supply Labor and Material necessary to complete Scaffolding and Roof Protection on Ellison Room to allow…Alteration or repairMay 14, 2019$50,000
-
Complete renovation of a Central Caregiver Station in the Urgent Care area of the Emergency Department at MGHAlteration or repairApr 5, 2019$812,000
-
Mar 22, 2019$1,000
-
Mar 22, 2019$2,500
-
Mar 22, 2019$1,000
-
Mar 22, 2019$1,000
-
Mar 22, 2019$5,000
-
Mar 22, 2019$30,000
-
Mar 22, 2019$12,000
-
Mar 22, 2019$32,000
-
Mar 22, 2019$10,000
-
Mar 21, 2019$25,000
-
MGH Ellison Building - Level 1 - Renovation of existing restroomsAlteration or repairFeb 21, 2019$200,000
-
Oct 25, 2018$1,500
-
Oct 25, 2018$20,000
-
Oct 1, 2018$1,000
-
May 20, 2018$3,000
-
Apr 24, 2018$7,000
-
Apr 24, 2018$1,000
-
Apr 19, 2018$5,500
-
Apr 19, 2018$60,000
-
Renovations of existing MGH ED Urgent spaceAlteration or repairApr 17, 2018$355,000
-
Demo 9 existing sinks & assocPlumbingApr 5, 2018$1,000
-
Jan 5, 2018$4,000
-
Jan 4, 2018$3,500
-
Dec 14, 2017$4,000
-
MGH Ellison Cross Connect, MiscElectricalDec 7, 2017$3,000
-
Ellison Building: 2nd floor reading room renovation add new receptacles per equipment layoutElectricalNov 7, 2017$10,500
-
Basement Level Existing IT closet renovations to upgrade cooling system for new computer and phone equipmentAlteration or repairNov 3, 2017$50,000
-
MGH Emergency Department RefurbishmentElectricalOct 25, 2017$7,000
-
Oct 13, 2017$30,500
-
Replace ACT, install millwork, upgrade electricalAlteration or repairOct 11, 2017$117,699
-
Renovation of MGH Phillips HousePlumbingAug 31, 2017$70,400
-
Massachusetts General Hospital.Alteration or repairAug 31, 2017$294,000
-
Mass General HospitalAlteration or repairAug 31, 2017$295,000
-
Aug 24, 2017$26,000
-
Aug 24, 2017$1,500
-
Aug 24, 2017$3,500
-
Aug 24, 2017$75,000
-
Aug 15, 2017$3,000
-
Ellison Building: 20th floor IDF closetElectricalAug 10, 2017$3,500
-
Ellison Building: 22nd floor IDF closetElectricalAug 10, 2017$3,500
-
Ellison Building: 21st floor IDF closetElectricalAug 10, 2017$3,500
-
Jul 17, 2017$90,000
-
22nd floor of the Ellison Building - Interior renovation to patient rooms including: new flooringAlteration or repairJun 29, 2017$1,209,117
-
20, 21 & 22 Floors Interior Renovation to IT closets to accommodate new heat loads as required for the new…Alteration or repairJun 28, 2017$50,000
-
Jun 13, 2017$33,000
-
Mass General Hospital - The contractor will oversee bulk oxygen cylinder back up systems for specific areas…Alteration or repairMay 25, 2017$97,200
-
MGH Ellison Procedure Room 64, MiscElectricalMay 16, 2017$2,000
-
Mass General Hospital - Ellison Building - 2nd Floor -;Interior Renovations of existing;space.Alteration or repairMay 11, 2017$655,495
-
Ellison Procedure Room 64 C-ArmFire systemsMay 9, 2017$2,500
-
Ellison 2 Procedure Room 64 C-ArmElectricalMay 9, 2017$110,000
-
Apr 26, 2017$3,000
-
Jan 25, 2017$5,000
-
MGH Bulk/ Oxygen - LunderElectricalJan 10, 2017$46,000
-
Scope of work includes removal of existing HVAC equipment and connections along with selective demolition of…Alteration or repairNov 22, 2016$6,070,763
-
MGH Ellison Lobby Lighting ReplacementsElectricalOct 14, 2016$61,885
-
Oct 7, 2016$4,800
-
Oct 6, 2016$50,000
-
MGH HospitalAlteration or repairJul 28, 2016$242,395
-
Renovation of administration staff/nurse stations in Ellison building on second floorAlteration or repairJun 29, 2016$337,300
-
Replacement of piping in Ellison building subbasement and basement No sprinkler workAlteration or repairJun 15, 2016$129,700
-
MGH Trayline Fan Replacement, MiscElectricalApr 29, 2016$1,200
-
MGH Ellison Nursery Expansion, MiscElectricalApr 29, 2016$10,000
-
Apr 25, 2016$18,500
-
Renovation of existing Nursery to upgrade facilities for better patient careAlteration or repairApr 7, 2016$1,300,000
-
Mar 23, 2016$10,000
-
MGH-Ellison Building Nursery RenovationFire systemsMar 23, 2016$15,000
-
MGH-Ellison Building Nursery RenovationElectricalMar 23, 2016$200,000
-
Feb 25, 2016$185,000
-
Jan 28, 2016$950
-
Jul 28, 2015$1,000
-
Basement Level existing IT closet renovations to upgrade cooling system for new computer and phone equipmentAlteration or repairJul 13, 2015$1,537,504
-
Jul 2, 2015$250
-
MGH Ellison Bldg 2nd Floor Install low voltage control wiring to HVAC equipment for the purpose of…ElectricalMay 28, 2015$2,400
-
May 19, 2015$22,500
-
May 19, 2015$4,250
-
Renovate Blake-Ellison OR43 FA SystemFire systemsApr 15, 2015$3,800
-
Renovate Blake-Ellison OR43ElectricalApr 15, 2015$24,700
-
2nd Floor interior renovation to existing office and break areaAlteration or repairApr 3, 2015$649,000
Sort
Next doorunder 250 ft · 25 permits
-
Fruit Street Garage 'Install new mainline disconnects55 Fruit St · 170 ft E · ElectricalOct 1$30,430
-
MGH - CSP Cross Connect PH2 Renovation55 Fruit St · 170 ft E · ElectricalSep 30$42,450
-
Relocate 1 existing speaker strobe A/V device55 Fruit St · 170 ft E · Fire systemsSep 29$850
-
Install wiring for IBA Proton imaging equipment55 Fruit St · 170 ft E · ElectricalSep 24$950,000
-
Electrical upgrade at Mass General Hospital Lunder Building on the fifth floor35 Fruit St · 190 ft S · Alteration or repairSep 15$1,006,000
-
Remove and replace existing EPDM roof system with new.075 reinforced EPDM55 Fruit St · 170 ft E · RoofingSep 9$495,000
-
Renovation to existing plumbing to add new sinks and floor drain275 Charles St · 200 ft N · PlumbingSep 3$15,000
-
Project address is actually 273 CHARLES STREET275 Charles St · 200 ft N · Alteration or repairSep 2$146,498
-
On Subbasement Floor of White Building 55 Fruit Street55 Fruit St · 170 ft E · Fire systemsSep 2$12,000
-
MGH Blake Medical Vacuum Pump55 Fruit St · 170 ft E · ElectricalAug 27$15,720
-
Demo existing &55 Fruit St · 170 ft E · Alteration or repairAug 20not listed
-
Cat6a network cabling for the White 3 CSPS sterilizing area renovation55 Fruit St · 170 ft E · ElectricalAug 19$17,000
-
Cat6A network cabling for MGH Lunder 6 CT Replacement35 Fruit St · 190 ft S · ElectricalAug 19$14,000
-
Installation of Cat6A data cabling for MGH Lunder Triage Renovation35 Fruit St · 190 ft S · ElectricalAug 19$16,000
-
MGH White 3 CSPS Expansion55 Fruit St · 170 ft E · ElectricalAug 10$7,720
-
MGH Ellison Supplemental Cooling55 Fruit St · 170 ft E · ElectricalJul 30$18,485
-
MGH Warren Neuro Lab275 Charles St · 200 ft N · ElectricalJul 20$15,250
-
Renovations of existing CSPS and Biomed work spaces55 Fruit St · 170 ft E · ElectricalJul 15$66,000
-
Replacement of existing pharmacy equipment275 Charles St · 200 ft N · ElectricalJul 15$36,500
-
Plumbing demo of old fixtures and piping55 Fruit St · 170 ft E · PlumbingJul 2$67,000
-
Turning sprinkler heads up and down as needed to accommodate and assist the hospital with equipment…275 Charles St · 200 ft N · Fire systemsMay 22$80,526
-
Renovation of an existing space275 Charles St · 200 ft N · ElectricalMay 19$72,000
-
Installation of new heat trace run on existing piping in basement of Lunder Building New 120v circuit for…55 Fruit St · 170 ft E · ElectricalMay 12$4,600
-
Renovation of an existing space at MGH on level 655 Fruit St · 170 ft E · PlumbingMay 6$20,000
-
MGH Lunder 6 CT Relocation at 45 Fruit Street location55 Fruit St · 170 ft E · ElectricalMay 6$14,200
This block250 to 1,000 ft · 88 permits in 87 projects
-
Replace doors on public restrooms32 Fruit St · 510 ft S · Alteration or repairSep 30$266,500
-
Installation of remote panel and meter bank243 Charles St · 310 ft SW · ElectricalSep 30$15,000
-
Tenant improvements on the 5th Floor IPSC Lab Area243 Charles St · 310 ft SW · Fire systemsSep 28$10,000
-
Install 1 entry door for replacement6 Strong Pl · 990 ft S · Alteration or repairSep 25$6,420
-
MEEI 4th Floor Otopatology Lab Renovation PH 2 / 800 SQ FT Selective Electrical Demo243 Charles St · 310 ft SW · ElectricalSep 25$30,000
-
Replacement of sink and associated water32 Fruit St · 510 ft S · PlumbingSep 24$6,000
-
Create a new Meds room from (2) existing offices32 Fruit St · 510 ft S · Alteration or repairSep 22$176,831
-
MEEI Cage Wash243 Charles St · 310 ft SW · ElectricalSep 15$25,252
-
Installation of a fire alarm module to control a door shutter on Yawkey Building Floor 832 Fruit St · 510 ft S · Fire systemsSep 10$2,000
-
Installation of a 120v life safety circuit for a control module for Fire Alarm integration for a door shutter…32 Fruit St · 510 ft S · ElectricalSep 10$3,000
-
Replace existing doors, carpet, and ceiling tile243 Charles St · 310 ft SW · Alteration or repairSep 9$100,000
-
Sub panel, 20a 120v circuit for HRV1 Strong Pl · 940 ft S · ElectricalSep 9$4,000
-
Install 40A feeds and GFCI protection for two commercial ovens in community center on the first floor75 Blossom Ct · 830 ft NE · ElectricalSep 9$15,000
-
Replace subpanel inside the unit 17G2 Hawthorne Pl · 900 ft E · ElectricalSep 4$2,500
-
Install a new door to create an office within the Gray 2 Radiology IR Department90 Blossom St · 250 ft N · Alteration or repairSep 2$30,885
-
Installation of (2) 375KW temporary generator to back up building while permanent generator is serviced32 Fruit St · 510 ft S · ElectricalSep 2$15,000
-
On Subbasement Floor of Servcie Building 30 Blossom Street30 Blossom St · 610 ft SE · Fire systemsSep 2$12,000
-
Install a manual shutter and tie in an existing automated shutter into the fire alarm system32 Fruit St · 510 ft S · Fire systemsAug 28$40,000
-
Install temporary 25x60 tent with no sides used for a wedding215-239 Charles St · 520 ft SW · OtherAug 25$4,500
-
Dishwasher replacement for apt 15A2 Hawthorne Pl · 900 ft E · PlumbingAug 24$250
-
Building take-down including abatement of 275 Cambridge Street275 Cambridge St · 780 ft S · DemolitionAug 20$2,440,000
-
Building take-down including abatement of 10 North Grove Street10 N Grove St · 800 ft S · DemolitionAug 20$435,000
-
Modify existing fire protection system to accommodate the new campus fire pump protection loop30 Blossom St · 610 ft SE · Fire systemsAug 20not listed
-
Install Cat6A cabling for the 26-0249-10 MEE 5 OGI & iPSC Reno243 Charles St · 310 ft SW · ElectricalAug 19$200,000
-
Install Cat6A data cabling for 26-0079-10 4th floor Otopathology Lab Reno243 Charles St · 310 ft SW · ElectricalAug 19$38,000
-
26-0105-10 Cat6a network cabling for the Their Specialty Pharmacy renovations60 Blossom St · 570 ft E · ElectricalAug 19$36,000
-
26-0105-10 Cat6a network cabling for the GRJ Specialty Pharmacy renovations90 Blossom St · 250 ft N · ElectricalAug 19$9,000
-
Installation of Gas and Oxygen Manifold in Edwards Basement Closet Installation of smoke detector inside…60 Blossom St · 570 ft E · Fire systemsAug 18$2,100
-
Installation of MI feeders from Rooftop Generator Penthouse on Blake Building to Jackson Building100 Blossom St · 270 ft N · ElectricalAug 18$655,000
-
Installation of Gas and Oxygen Manifold in Edwards Basement Closet60 Blossom St · 570 ft E · ElectricalAug 18$52,000
-
Ground level water leak only 1st floor33 Blossom St · 830 ft E · ElectricalAug 14$40,000
-
Window replacement (nothing structural) Building 8- Unit 02D8 Whittier Pl · 930 ft NE · Alteration or repairAug 13$348,475
-
Window replacement (nothing Structural)2 Hawthorne Pl · 900 ft E · Alteration or repairAug 13$403,500
-
Plumbing work in units 104,105,106,108 & 10933 Blossom St · 830 ft E · PlumbingAug 12$9,000
-
MGH Their 6 CHW Replacement60 Blossom St · 570 ft E · ElectricalAug 12$23,250
-
Mass Eye & Ear -MGB- Amendment to ALT 1813088 for added scope Floor 5 IPSC Lab243 Charles St · 310 ft SW · Alteration or repairAug 12$1,896,000
-
Furnish and install new laboratory oxygen tank farm closet and associated piping60 Blossom St · 570 ft E · Alteration or repairAug 10$230,000
-
Repairs due to water damage33 Blossom St · 830 ft E · Alteration or repairAug 6$180,000
-
Water main broke in the parking lot and flooded the entire first floor level33 Blossom St · 830 ft E · Alteration or repairAug 6$40,000
-
'Install new mainline disconnects60 Blossom St · 570 ft E · ElectricalAug 4$44,165
-
Installation of low voltage security wiring for 2 new doors to and existing access control panel243 Charles St · 310 ft SW · ElectricalJul 31$15,000
-
Install a air gap on the main kitchen prep sink as required by the sanitary inspector215-239 Charles St · 520 ft SW · PlumbingJul 30$1,500
-
MGH 275 Cambridge St Project LL1 Low Voltage275 Cambridge St · 780 ft S · ElectricalJul 30$15,000
-
MGH 275 Cambridge St Project P3 thru P6 Low Voltage275 Cambridge St · 780 ft S · ElectricalJul 30$32,000
-
Low voltage cabling for AV systems LL - L14275 Cambridge St · 780 ft S · ElectricalJul 30$342,500
-
Replace shower valve and bathroom fixtures re-pipe kitchen sink2 Hawthorne Pl · 900 ft E · PlumbingJul 29$2,100
-
Chilled water piping replacement60 Blossom St · 570 ft E · ElectricalJul 27$20,000
-
LL2 MGH 4B Tower Low Voltage Cabling 275 Cambridge Street265-285 Cambridge St · 750 ft SE · ElectricalJul 24$214,495
-
Electrical Installations for an apartment- 16k2 Hawthorne Pl · 900 ft E · ElectricalJul 18$1,900
-
Jul 17$3,800
-
Relocate 1 existing Speaker strobe device80 Blossom St · 400 ft E · Fire systemsJul 16$2,000
-
Interior renovation of residential condo Unit 16K2 Hawthorne Pl · 900 ft E · Alteration or repairJul 9$33,485
-
MGH Yawkey Heat Recovery Chiller Plant Phase II32 Fruit St · 510 ft S · ElectricalJul 7$64,566
-
Installation of new circuits for (4) new heat recovery chillers on floor 11 Yawkey Wiring of new baseboard…32 Fruit St · 510 ft S · ElectricalJul 7$60,000
-
Installation of (2) 277V Heat Trace Controllers and (2) individual runs of 320' of 8w heat trace30 Blossom St · 610 ft SE · ElectricalJul 7$20,000
-
Tenant improvements on the 5th Floor243 Charles St · 310 ft SW · Fire systemsJun 29$40,000
-
Interior renovation of network rooms on the 10th and 11th floors of 243 Charles Street as well as a few…243 Charles St · 310 ft SW · Alteration or repairJun 29$1,070,871
-
MEEI 10th & 11th Floor IDF & DATA Closets renovations including FA Devices to be Installed243 Charles St · 310 ft SW · Fire systemsJun 26$20,000
-
MEEI 5th Floor Cagewash Areas Provide & Install (4) Addressable Smoke Detectors243 Charles St · 310 ft SW · Fire systemsJun 26$8,500
-
MEEI 10th & 11th Floor IDF and Data Closets renovations with new Lighting and WM Raceway and outlet provisions243 Charles St · 310 ft SW · ElectricalJun 25$165,000
-
MEEI 5th Floor Renovation to Cage Washrooms and associated Areas consisting of 6 Rooms with new Light…243 Charles St · 310 ft SW · ElectricalJun 25$65,000
-
Install new chilled water piping30 Blossom St · 610 ft SE · Alteration or repairJun 25$2,119,835
-
Furnish & Install (6) Evercharge Single-Port Wall-Mounted L2 EV Chargers1 Emerson Pl · 510 ft N · ElectricalJun 24$115,606
-
Tenant improvements on the 5th Floor243 Charles St · 310 ft SW · ElectricalJun 24$750,000
-
Laboratory Renovation243 Charles St · 310 ft SW · PlumbingJun 17$750,000
-
Laboratory Natural Gas Turrets Only243 Charles St · 310 ft SW · PlumbingJun 16$1,000
-
Remove ballast and existing roof10 Emerson Pl · 700 ft N · RoofingJun 15$466,827
-
MGH Jackson Specialty Pharmacy80 Blossom St · 400 ft E · ElectricalJun 10$7,500
-
Demo of existing interior spaces243 Charles St · 310 ft SW · Alteration or repairJun 9$25,900
-
(4) AAON Rooftop (52 BTU total 13 each) units' gas will be disconnected then reconnected too new units175 Blossom St · 470 ft N · PlumbingJun 8$9,361
-
Disconnect all Power and control wiring too AAON Rooftop Unit175 Blossom St · 470 ft N · ElectricalJun 2$9,131
-
Install (3) 80,000BTU heaters each connected to (1) 100lb propane tank32 Fruit St · 510 ft S · PlumbingJun 1$1,500
-
Removing and installing new plumbing fixtures in hospital patient rooms243 Charles St · 310 ft SW · PlumbingMay 28$72,600
-
MGH Their 1 - Specialty Pharmacy60 Blossom St · 570 ft E · ElectricalMay 26$10,800
-
MGH Jackson 1025 Lab Reno80 Blossom St · 400 ft E · ElectricalMay 26$1,670
-
Addition of sign to ALT1748993265-285 Cambridge St · 750 ft SE · SignMay 26$5,490
-
Installation of (141) roof mounted solar panels and microinverters with 83.190 kWDC rated output5 Charlesbank Rd · 570 ft NW · SolarMay 22$107,000
-
Demo only leasing office space on 8th floor and move to 1st floor office space1 Emerson Pl · 510 ft N · Alteration or repairMay 20$9,000
-
Selective Demo associated with Building Demolition275 Cambridge St · 780 ft S · Fire systemsMay 20$1,000
-
Install factory receptacles in furniture275 Cambridge St · 780 ft S · ElectricalMay 19$1,000
-
Relocating a sink and some plumbing piping including domestic hot & cold water243 Charles St · 310 ft SW · PlumbingMay 14$131,000
-
Replace tankless water heater6 Strong Pl · 990 ft S · PlumbingMay 13$8,000
-
Replace tankless hot water6 Strong Pl · 990 ft S · PlumbingMay 12$200
-
Installing 2 card reader packages per T2.04243 Charles St · 310 ft SW · ElectricalMay 11$5,000
-
De-Energized maintenance of incoming feeds to the main90 Blossom St · 250 ft N · ElectricalMay 11$10,000
-
Mass Eye & Ear- Vivarium Cage wash installation243 Charles St · 310 ft SW · Fire systemsMay 11$250,000
-
MGH Simches Freezer Farm at 185 Cambridge St Boston location183-191 Cambridge St · 1,000 ft SE · ElectricalMay 6$20,500
Within a quarter mile1,000 ft to ¼ mi · 60 permits in 58 projects
-
PERMIT DEDICATED TO SECONDARY ADDRESS "85 PHILLIPS ST ONLY" Eversource WO # 23756388 New service installation…81a-83 W Cedar St · 0.20 mi S · ElectricalSep 25$100,000
-
Replace old kichen sink, install combo washer and dryer ventless76 Phillips St · 0.21 mi S · PlumbingSep 23$1,575
-
Full repointing of all mortar joints at the rear elevations5 W Hill Pl · 0.23 mi SW · Alteration or repairSep 22$70,500
-
Repair stucco on building as per violation.Stucco has become unsafe looking to fix all stucco and repaint…228-234 Cambridge St · 0.21 mi SE · Alteration or repairSep 9$44,500
-
Full gut renovation - studio apartment conversion1-2 Longfellow Pl · 0.24 mi E · ElectricalSep 2$150,000
-
Aug 31$1,500
-
Remove existing furnace and replace with new furnace25 Garden St · 0.22 mi SE · PlumbingAug 31$5,000
-
Clarification;Change of occupancy from health club1-2 Longfellow Pl · 0.24 mi E · Alteration or repairAug 31$2,600,000
-
Install one black wall sign with white graphics (non illuminated) as approved by Beacon Hill Landmarks131 Charles St · 0.23 mi S · SignAug 25$3,000
-
Renovation of existing exercise room including new flooring and paint1-2 Longfellow Pl · 0.24 mi E · Alteration or repairAug 24$165,286
-
Window replacement (nothing structural) Building 6- Unit 02H6 Whittier Pl · 0.22 mi NE · Alteration or repairAug 13$478,460
-
Window Replacement (Nothing structural)9 Hawthorne Pl · 0.21 mi E · Alteration or repairAug 13$339,295
-
Unit D, Replaced old Panel25 Phillips St · 0.22 mi SE · ElectricalAug 6$3,000
-
Install a Tesla charger on the second floor144-162 Charles St · 0.24 mi S · ElectricalAug 4$2,500
-
Provide all low voltage control wiring for the VRV system and install/terminate thermostats/controllers144-162 Charles St · 0.24 mi S · ElectricalJul 31$8,500
-
Bathroom remodeling74-78 Phillips St · 0.21 mi S · ElectricalJul 30$1,900
-
Wire POS Cables144-162 Charles St · 0.24 mi S · ElectricalJul 28$2,400
-
Wire Fire alarm devices144-162 Charles St · 0.24 mi S · Fire systemsJul 28$6,500
-
Fifth floor unit 9: 1 Kitchen, 1 laundry and 1 3/4-bath renovation25 Garden St · 0.22 mi SE · PlumbingJul 27$8,000
-
Low voltage alarm install for 85 Phillips St Apt 687 W Cedar St · 0.19 mi S · ElectricalJul 27$1,200
-
Replace existing electrical service81a-83 W Cedar St · 0.20 mi S · ElectricalJul 27$100,000
-
Install Lights and power in cafe144-162 Charles St · 0.24 mi S · ElectricalJul 22$32,000
-
Full Bath74-78 Phillips St · 0.21 mi S · PlumbingJul 21$1,250
-
Rewire Kitchen, Bathroom, Laundry and Bedroom25 Garden St · 0.22 mi SE · ElectricalJul 21$12,000
-
Install new hot water heater, kitchen sinks (w/ 1 backflow)144-162 Charles St · 0.24 mi S · PlumbingJul 17$10,000
-
Kitchen and Bathroom Remodel to Unit #18 W Hill Pl · 0.24 mi SW · PlumbingJul 17$23,000
-
Run new gas piping from meter in space to new kitchen equipment144-162 Charles St · 0.24 mi S · PlumbingJul 17$2,000
-
BATHROOM RENOVATIONWork to be done at 76A Phillips ST74-78 Phillips St · 0.21 mi S · Alteration or repairJul 16$26,340
-
Remove 9 existing windows and replace with 9 new windows76 W Cedar St · 0.23 mi S · Alteration or repairJul 16$27,405
-
Kitchen and bathroom Flooring and painting25 Garden St · 0.22 mi SE · Alteration or repairJul 15$45,000
-
Wiring new kitchen and master bathroom8 W Hill Pl · 0.24 mi SW · ElectricalJul 14$15,000
-
Elec app. Per approval Historic Cert #26.0865 BH and engineer stamped drawings248-270 Cambridge St · 0.19 mi SE · SignJul 14$36,000
-
Supply and Install a 10 Foot trench drain6 Whittier Pl · 0.22 mi NE · PlumbingJul 10$10,000
-
Low-voltage cabling for access control card reader installation at retail bank branch248-270 Cambridge St · 0.19 mi SE · ElectricalJul 9$2,930
-
Repointing, set up scaffolding17 S Russell St · 0.25 mi SE · Alteration or repairJul 7$51,000
-
Replace main circuit board in fire alarm control panel214-218 Cambridge St · 0.23 mi SE · Fire systemsJul 7$7,495
-
Complete bathroom renovation, full interior painting of the apartment6 Whittier Pl · 0.22 mi NE · Alteration or repairJul 6$17,511
-
Interior fit-out of new cafe with take-out where former grocery store was144-162 Charles St · 0.24 mi S · Alteration or repairJul 6$500,000
-
Interior renovation to existing building2 Sentry Hill Pl · 0.24 mi S · Alteration or repairJun 30$150,000
-
We will drain down, cut free and properly / legally dispose of the outgoing Triangle Tube Prestige Solo 250 × 2 permits3 W Hill Pl · 0.22 mi SW · PlumbingJun 26$9,750
-
Replace the existing Zinsco electrical panel in unit 710 with a new one1-2 Longfellow Pl · 0.24 mi E · ElectricalJun 25$1,500
-
100% cut and point of garden wall (90sf)75 W Cedar St · 0.22 mi S · Alteration or repairJun 23$2,200
-
Install trench drain at the bottom of the ramp to the parking garage6 Whittier Pl · 0.22 mi NE · PlumbingJun 17$20,000
-
Installation of Burglar Alarm security devices at Chase Bank 250 Cambridge St Boston MA 02114 (100861829-01)248-270 Cambridge St · 0.19 mi SE · ElectricalJun 12$43,702
-
Repoint rear facade Replace broken bricks Rebuild over one archway32 Anderson St · 0.24 mi S · OtherJun 4$55,000
-
Remove and replacing existing office walls and replace with new walls1-2 Longfellow Pl · 0.24 mi E · Alteration or repairJun 4$125,000
-
New laundry on the 5th floor76 W Cedar St · 0.23 mi S · PlumbingJun 4$2,000
-
Install two circuits for Laundy76 W Cedar St · 0.23 mi S · ElectricalJun 4$700
-
Installation of intercom system for 9 apartment units installation of camera sysem for common areas…147-149 Charles St · 0.20 mi S · ElectricalJun 3$18,000
-
Replace main circuit board infire alarm control panel214-218 Cambridge St · 0.23 mi SE · Fire systemsMay 29$1,000
-
Unit 5R, prep to add in unit laundry76 W Cedar St · 0.23 mi S · Alteration or repairMay 28$3,000
-
JP Morgan Chase - Beacon Hill at 250 Cambridge Street Boston location248-270 Cambridge St · 0.19 mi SE · ElectricalMay 26$37,920
-
Removal of two existing brick columns located at the front elevation residential entrance151a-151 Charles St · 0.20 mi S · Alteration or repairMay 14$44,314
-
Tenant fit out for a new bank248-270 Cambridge St · 0.19 mi SE · PlumbingMay 12$44,000
-
56 telecom drops on the 1st floor of 248-270 Cambridge Street (250 Cambridge Street) for tenant JPMC Beacon…248-270 Cambridge St · 0.19 mi SE · ElectricalMay 6$23,463
-
Replace old Zinsco panel with new Siemens1-2 Longfellow Pl · 0.24 mi E · ElectricalMay 5$1,500
-
Fire alarm scope of work is only to remove and re install to accommodate the new vestibule6 Whittier Pl · 0.22 mi NE · Fire systemsMay 4$1,500
-
Electrical Work Associated with Tenant Fitout on the 1st Floor6 Whittier Pl · 0.22 mi NE · ElectricalMay 4$35,000
Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 15:06 UTC. Official data.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near