Nearby Permits
Map of 92 permits within a quarter mile of 30 Juniper StElectrical, 4 Akron Pl, Oct 5, 2026Fire systems, 92-96 Lambert Av, Oct 2, 2026Electrical, 19-25 Hommagen Ct, Oct 1, 2026Electrical, 44 Saint James St, Oct 1, 2026Alteration or repair, 31 Dorr St, Sep 22, 2026Fire systems, 73 Cedar St, Sep 17, 2026Solar, 31 Dorr St, Sep 16, 2026Electrical, 34 Lambert St, Sep 16, 2026Fire systems, 34 Lambert St, Sep 16, 2026Electrical, 34 Lambert St, Sep 16, 2026Other, 27 Guild St, Sep 16, 2026Roofing, 16 Saint James St, Sep 14, 2026Electrical, 2505-2525 Washington St, Sep 11, 2026Fire systems, 2505-2525 Washington St, Sep 11, 2026Electrical, 1-11 Dorr St, Sep 9, 2026Alteration or repair, 19-25 Hommagen Ct, Sep 8, 2026Electrical, 22 Kenilworth St, Sep 8, 2026Plumbing, 42 Saint James St, Sep 3, 2026Roofing, 9 Akron St, Sep 2, 2026Plumbing, 44 Bartlett St, Sep 2, 2026Electrical, 30-40 Crispus Attucks Pl, Aug 31, 2026Electrical, 4-18 Crispus Attucks Pl, Aug 31, 2026Electrical, 18-28 Crispus Attucks Pl, Aug 31, 2026Electrical, 2505-2525 Washington St, Aug 27, 2026Electrical, 73 Cedar St, Aug 26, 2026Plumbing, 2691 Washington St, Aug 25, 2026Plumbing, 2691 Washington St, Aug 25, 2026Electrical, 2565 Washington St, Aug 24, 2026Electrical, 2691 Washington St, Aug 24, 2026Electrical, 44 Bartlett St, Aug 24, 2026Electrical, 44 Bartlett St, Aug 24, 2026Electrical, 115 Dale St, Aug 21, 2026Electrical, 12 Thornton St, Aug 20, 2026Electrical, 67 Lambert Av, Aug 19, 2026Fence, wall or deck, 17 Highland Park St, Aug 19, 2026Alteration or repair, 52 Lambert Av, Aug 18, 2026Plumbing, 102 Thornton St, Aug 18, 2026Alteration or repair, 92-96 Lambert Av, Aug 18, 2026Plumbing, 2505-2525 Washington St, Aug 17, 2026Electrical, 14 Dabney St, Aug 17, 2026Alteration or repair, 51 Saint James St, Aug 13, 2026Plumbing, 2451 Washington St, Aug 10, 2026Alteration or repair, 4-18 Crispus Attucks Pl, Aug 7, 2026Alteration or repair, 18-28 Crispus Attucks Pl, Aug 7, 2026Alteration or repair, 2691 Washington St, Aug 7, 2026Alteration or repair, 5-9 Lambert St, Aug 6, 2026Plumbing, 67 Lambert Av, Aug 5, 2026Alteration or repair, 42 Saint James St, Aug 4, 2026Alteration or repair, 106 Highland St, Jul 31, 2026Electrical, 2565 Washington St, Jul 29, 2026Electrical, 42 Saint James St, Jul 27, 2026Plumbing, 66 Saint James St, Jul 22, 2026Plumbing, 66 Saint James St, Jul 22, 2026Alteration or repair, 45 Thornton St, Jul 21, 2026Electrical, 22 Dorr St, Jul 15, 2026Alteration or repair, 14 Dabney St, Jul 14, 2026Alteration or repair, 30-40 Crispus Attucks Pl, Jul 9, 2026Plumbing, 23 Juniper St, Jul 8, 2026Fire systems, 2565 Washington St, Jul 7, 2026Roofing, 30 Circuit St, Jul 5, 2026Roofing, 31 Dorr St, Jul 2, 2026Solar, 29 Dorr St, Jul 2, 2026Alteration or repair, 34 Lambert St, Jul 2, 2026Plumbing, 2565 Washington St, Jun 25, 2026Electrical, 29 Dorr St, Jun 25, 2026Solar, 29 Dorr St, Jun 25, 2026Electrical, 29 Dorr St, Jun 22, 2026Addition, 67 Lambert Av, Jun 12, 2026Alteration or repair, 2691 Washington St, Jun 11, 2026Alteration or repair, 2505-2525 Washington St, Jun 11, 2026Alteration or repair, 2565 Washington St, Jun 11, 2026Plumbing, 4 Willoughby Pl, Jun 10, 2026Plumbing, 4 Willoughby Pl, Jun 10, 2026Alteration or repair, 73 Cedar St, Jun 4, 2026Plumbing, 35-37 Thornton St, Jun 2, 2026Alteration or repair, 118-120 Thornton St, Jun 2, 2026Roofing, 153 Highland St, Jun 1, 2026Roofing, 30-32 Hawthorne St, Jun 1, 2026Alteration or repair, 30 Kenilworth St, Jun 1, 2026Electrical, 164 Highland St, May 28, 2026Alteration or repair, 25 Hawthorne St, May 27, 2026Electrical, 51 Cedar St, May 26, 2026Plumbing, 4 Akron Pl, May 21, 2026Plumbing, 26-30 Dorr St, May 20, 2026Plumbing, 4 Akron Pl, May 20, 2026Roofing, 91 Regent St, May 15, 2026Roofing, 12 Thornton St, May 14, 2026Electrical, 2565 Washington St, May 14, 2026Roofing, 42 Juniper St, May 12, 2026Alteration or repair, 22 Dorr St, May 6, 2026Electrical, 29 Dorr St, May 6, 2026Electrical, 35-37 Thornton St, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

30 Juniper St

Boston, MA 02119

The biggest project within a quarter mile since May 1: a $631,638 alteration or repair at 4-18 Crispus Attucks Pl, permitted Aug 7.

Nine permits on record here. The newest, Jan 15: Install 19 windows for replacement. Within a quarter mile, the city has issued 92 more permits (89 projects) since May 1.

MayJunJulAugSepOct
Here9 permits · 30 Juniper St
  1. Jan 15$39,851
  2. Jan 25 to 30, 2023$3,400
  3. Nov 1, 2022$12,000
  4. Dec 20, 2016$1,000
  5. Dec 19, 2016$16,500
  6. Dec 19, 2016$4,200
  7. Apr 27, 2012$10,024
  8. Apr 27, 2012$8,024
Next doorunder 250 ft · 2 permits
  1. Jul 8$1,500
  2. May 12$68,200
This block250 to 1,000 ft · 62 permits in 60 projects
  1. Oct 2$12,000
  2. Oct 1$12,000
  3. Oct 1$5,375
  4. Renovate 1st floor/2nd floor bathroom
    31 Dorr St · 850 ft NW · Alteration or repair
    Sep 22$31,300
  5. Sep 17$7,000
  6. Sep 16$7,000
  7. Sep 16not listed
  8. Sep 11$7,000
  9. Sep 11$18,000
  10. Sep 8$360,936
  11. Sep 3$2,000
  12. Strip roofing
    9 Akron St · 880 ft E · Roofing
    Sep 2$14,600
  13. Aug 31$15,000
  14. Aug 31$15,000
  15. Aug 31$15,000
  16. Aug 27$90,000
  17. Finish basement
    73 Cedar St · 820 ft W · Electrical
    Aug 26$3,700
  18. Aug 25$4,500
  19. Aug 25$4,500
  20. Aug 24$20,000
  21. Aug 24$750
  22. Aug 20$600
  23. Aug 19$15,000
  24. Aug 18$15,000
  25. Aug 18$1,250
  26. Aug 18not listed
  27. Aug 17$42,000
  28. Aug 7$631,638
  29. Aug 7$541,404
  30. Utility Room: Fire restoration
    2691 Washington St · 710 ft S · Alteration or repair
    Aug 7$12,990
  31. Aug 5$5,000
  32. New heating and cooling system
    42 Saint James St · 930 ft NE · Alteration or repair
    Aug 4$200,000
  33. Jul 29$21,000
  34. Jul 27$11,000
  35. Gas WH replacement × 2 permits
    66 Saint James St · 760 ft NE · Plumbing
    Jul 22$2,500
  36. Jul 21$8,500
  37. Electric demolition of a wall
    22 Dorr St · 990 ft NW · Electrical
    Jul 15$1,500
  38. Jul 9$541,404
  39. Jul 7$9,800
  40. Jul 2$6,600
  41. Jun 25 to Jul 2$22,000
  42. Jun 25$9,200
  43. Jun 25$4,100
  44. Jun 22$3,900
  45. Jun 12$150,000
  46. Jun 11$2,000
  47. Jun 11$530,100
  48. Reno of 1st floor gym into offices
    2565 Washington St · 470 ft NE · Alteration or repair
    Jun 11$356,745
  49. Amendment for ALT1686181
    73 Cedar St · 820 ft W · Alteration or repair
    Jun 4not listed
  50. Jun 2$500
  51. Jun 1$36,500
  52. Mass Save Insulation and Air Sealing
    25 Hawthorne St · 870 ft W · Alteration or repair
    May 27$4,367
  53. May 26$875
  54. Replace tub to shower
    26-30 Dorr St · 920 ft NW · Plumbing
    May 20not listed
  55. May 15$29,850
  56. May 14$27,800
  57. May 14$46,000
  58. Drywall, painting and flooring
    22 Dorr St · 990 ft NW · Alteration or repair
    May 6$33,000
  59. Low voltage alarm install
    29 Dorr St · 870 ft NW · Electrical
    May 6$1,200
  60. Basement reno
    35-37 Thornton St · 270 ft W · Electrical
    May 1$8,000
Within a quarter mile1,000 ft to ¼ mi · 28 permits in 27 projects
  1. Oct 5$1,250
  2. Sep 16$2,500
  3. Sep 16$2,500
  4. Sep 16$17,000
  5. Sep 14$12,000
  6. Sep 9$1,000
  7. Sep 8$1,200
  8. Sep 2$464,000
  9. Aug 24$1,500
  10. Aug 24$1,000
  11. Aug 21$12,000
  12. Aug 19$381,000
  13. Aug 17$5,000
  14. Aug 13$5,000
  15. Cross connection
    2451 Washington St · 0.25 mi NE · Plumbing
    Aug 10$1,500
  16. Kitchen remodel
    5-9 Lambert St · 0.25 mi NW · Alteration or repair
    Aug 6$22,400
  17. Jul 31$62,149
  18. Jul 14$10,000
  19. Jul 5$16,000
  20. Remodel 3 Bathroom, remodel kitchen
    34 Lambert St · 0.21 mi NW · Alteration or repair
    Jul 2$80,000
  21. Replace heating boiler × 2 permits
    4 Willoughby Pl · 0.24 mi N · Plumbing
    Jun 10$5,000
  22. Jun 2$8,469
  23. Jun 1$14,000
  24. Jun 1$185,000
  25. May 28$5,000
  26. Back flow for boiler
    4 Akron Pl · 0.22 mi E · Plumbing
    May 21$1,500
  27. Gas piping for new boiler
    4 Akron Pl · 0.22 mi E · Plumbing
    May 20$1,500
More on this streetJuniper St · 7 other addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 6, 2026. We checked it Oct 7, 05:16 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near