Nearby Permits
Map of 85 permits within a quarter mile of 331-333 Centre StAlteration or repair, 64 Wyman St, Sep 25, 2026Electrical, 20 Edge Hill St, Sep 25, 2026Plumbing, 330 Centre St, Sep 21, 2026Plumbing, 41 Sheridan St, Sep 17, 2026Electrical, 41 Sheridan St, Sep 15, 2026Alteration or repair, 98 Wyman St, Sep 8, 2026Plumbing, 315 Centre St, Sep 4, 2026Fence, wall or deck, 73 Walden St, Sep 3, 2026Alteration or repair, 21 Sheridan St, Sep 3, 2026Electrical, 7 Bolster St, Sep 2, 2026Electrical, 64 Wyman St, Sep 2, 2026Alteration or repair, 41 Wyman St, Sep 1, 2026Alteration or repair, 25 Round Hill St, Aug 31, 2026Plumbing, 17 Forbes St, Aug 31, 2026Electrical, 22 Chestnut Av, Aug 28, 2026Alteration or repair, 11 Wyman St, Aug 24, 2026Alteration or repair, 120 Day St, Aug 24, 2026Alteration or repair, 31 Gay Head St, Aug 21, 2026Electrical, 154-162 Heath St, Aug 17, 2026Electrical, 73 Sheridan St, Aug 17, 2026Plumbing, 64 Wyman St, Aug 14, 2026Plumbing, 64 Wyman St, Aug 13, 2026Electrical, 3 Edge Hill St, Aug 6, 2026Alteration or repair, 45 Sheridan St, Jul 31, 2026Alteration or repair, 85 Walden St, Jul 31, 2026Alteration or repair, 35 Creighton St, Jul 29, 2026Plumbing, 25 Gay Head St, Jul 28, 2026Plumbing, 13 Round Hill St, Jul 28, 2026Plumbing, 6 Schiller St, Jul 28, 2026Plumbing, 25 Gay Head St, Jul 28, 2026Plumbing, 13 Round Hill St, Jul 28, 2026Plumbing, 6 Schiller St, Jul 28, 2026Electrical, 10 Mozart St, Jul 28, 2026Roofing, 31 Round Hill St, Jul 23, 2026Alteration or repair, 41 Sheridan St, Jul 22, 2026Alteration or repair, 21-23 Wyman St, Jul 22, 2026Plumbing, 363-365 Centre St, Jul 21, 2026Plumbing, 76 Sheridan St, Jul 21, 2026Alteration or repair, 32 Forbes St, Jul 20, 2026Alteration or repair, 32 Forbes St, Jul 20, 2026Alteration or repair, 32 Forbes St, Jul 20, 2026Plumbing, 76 Sheridan St, Jul 20, 2026Alteration or repair, 43-45 Priesing St, Jul 13, 2026Alteration or repair, 2 Mark St, Jul 8, 2026Electrical, 12 Sunnyside St, Jul 7, 2026Mechanical (HVAC), 12 Sunnyside St, Jul 2, 2026Electrical, 7 Bolster St, Jul 2, 2026Alteration or repair, 37 Chestnut Av, Jun 30, 2026Plumbing, 37 Chestnut Av, Jun 29, 2026Electrical, 10 Westerly St, Jun 25, 2026Electrical, 10 Westerly St, Jun 25, 2026Electrical, 20 Creighton St, Jun 25, 2026Electrical, 2 Mark St, Jun 23, 2026Plumbing, 34 Chestnut Av, Jun 17, 2026Electrical, 32 Sheridan St, Jun 17, 2026Alteration or repair, 20 Creighton St, Jun 15, 2026Plumbing, 20 Creighton St, Jun 12, 2026Electrical, 16-18 Creighton St, Jun 11, 2026Fence, wall or deck, 25 Round Hill St, Jun 10, 2026Plumbing, 20 Creighton St, Jun 10, 2026Electrical, 98 Wyman St, Jun 9, 2026Alteration or repair, 3 Kenney St, Jun 8, 2026Alteration or repair, 44 Forbes St, Jun 8, 2026Plumbing, 2 Mark St, Jun 5, 2026Electrical, 35 Creighton St, Jun 3, 2026Solar, 96 Wyman St, Jun 1, 2026Alteration or repair, 76 Sheridan St, Jun 1, 2026Fire systems, 10 Westerly St, May 31, 2026Solar, 96 Wyman St, May 29, 2026Alteration or repair, 16-18 Creighton St, May 27, 2026Plumbing, 16-18 Creighton St, May 27, 2026Electrical, 32 Sheridan St, May 27, 2026Plumbing, 16-18 Creighton St, May 26, 2026Alteration or repair, 79a Sheridan St, May 20, 2026Solar, 100 Chestnut Av, May 18, 2026Solar, 100 Chestnut Av, May 18, 2026Fence, wall or deck, 148 Minden St, May 12, 2026Fence, wall or deck, 40 Day St, May 12, 2026Fence, wall or deck, 13 Round Hill St, May 12, 2026Plumbing, 363-365 Centre St, May 11, 2026Plumbing, 11 Bynner St, May 7, 2026Electrical, 30-40 Bickford St, May 6, 2026Electrical, 11 Bynner St, May 5, 2026Plumbing, 178 Heath St, May 4, 2026Alteration or repair, 62 Wyman St, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade

331-333 Centre St

Boston, MA 02130

Eight permits on record here. The newest, Jul 2, 2025: Complete rewire second floor apartment. Within a quarter mile, the city has issued 85 more permits (80 projects) since May 1.

MayJunJulAugSepOct
Here8 permits · 331-333 Centre St
  1. Jul 2, 2025$5,000
  2. May 22, 2025$40,000
  3. Aug 27, 2024$40,000
  4. Aug 5, 2022$110,000
  5. Jun 8, 2022$1,100
  6. Jun 2, 2022$55,000
  7. Mar 2, 2022$40,000
  8. Jan 11, 2011$1,118
Next doorunder 250 ft · 2 permits
  1. Jul 31$4,750
  2. Jul 28$500
This block250 to 1,000 ft · 53 permits in 49 projects
  1. Update kitchen cabinets and fixtures
    64 Wyman St · 830 ft S · Alteration or repair
    Sep 25$32,000
  2. Sep 25$3,275
  3. Sep 21$2,500
  4. Sep 4$1,000
  5. Removal of 12ft x 6ft x 9ft shed structure
    73 Walden St · 320 ft NE · Fence, wall or deck
    Sep 3$3,100
  6. Sep 2$162,185
  7. Renovating kitchen
    64 Wyman St · 830 ft S · Electrical
    Sep 2$2,500
  8. Remove chimney
    41 Wyman St · 710 ft SW · Alteration or repair
    Sep 1$50,000
  9. Second floor and attic insulation
    25 Round Hill St · 540 ft N · Alteration or repair
    Aug 31$14,500
  10. Aug 31$5,000
  11. Aug 28$1,500
  12. Replacement of 10 windows
    11 Wyman St · 620 ft SW · Alteration or repair
    Aug 24$55,749
  13. Aug 21$50,000
  14. Aug 14$2,500
  15. Aug 13not listed
  16. Aug 6$1,050
  17. Jul 29$28,000
  18. Remove and replace (2) combi boilers × 2 permits
    25 Gay Head St · 630 ft N · Plumbing
    Jul 28$14,000
  19. Remove and replace (2) combi boilers × 2 permits
    13 Round Hill St · 330 ft N · Plumbing
    Jul 28$14,000
  20. Jul 23$12,950
  21. Jul 22$1,000
  22. Jul 21$1,800
  23. Residential weatherization/air sealing × 3 permits
    32 Forbes St · 740 ft SW · Alteration or repair
    Jul 20$5,000
  24. Jul 13$36,251
  25. Jul 7$1,250
  26. Jul 2$10,000
  27. Jul 2$381,300
  28. Jun 30$23,410
  29. Jun 29$1,200
  30. Low voltage for 3 units
    10 Westerly St · 550 ft W · Electrical
    Jun 25$2,500
  31. Jun 25$30,000
  32. Full apartment re-wire
    20 Creighton St · 950 ft W · Electrical
    Jun 25$6,000
  33. Jun 17$4,000
  34. Jun 17$1,500
  35. Jun 15$61,610
  36. Gas Stove - Unit 1
    20 Creighton St · 950 ft W · Plumbing
    Jun 12$1,000
  37. Jun 11$6,000
  38. Jun 10$45,000
  39. Jun 10$9,000
  40. Jun 8$47,826
  41. Water damage repair
    35 Creighton St · 810 ft W · Electrical
    Jun 3$5,000
  42. May 31$10,000
  43. May 27$145,000
  44. May 27$12,000
  45. Finish basement
    32 Sheridan St · 990 ft SW · Electrical
    May 27$6,000
  46. Gas Stove - Apt 3
    16-18 Creighton St · 950 ft W · Plumbing
    May 26not listed
  47. Remove and replace existing deck
    13 Round Hill St · 330 ft N · Fence, wall or deck
    May 12$46,500
  48. Fix sink
    363-365 Centre St · 860 ft W · Plumbing
    May 11$1,000
  49. May 1$5,631
Within a quarter mile1,000 ft to ¼ mi · 30 permits in 29 projects
  1. Sep 17$4,000
  2. Rewire 2nd floor bathroom
    41 Sheridan St · 0.20 mi SW · Electrical
    Sep 15$1,975
  3. Sep 8$35,000
  4. Sep 3$52,291
  5. Aug 24$89,630
  6. Aug 17$50,000
  7. Aug 17$2,000
  8. Jul 31$10,000
  9. Remove and replace (3) combi boilers × 2 permits
    6 Schiller St · 0.20 mi N · Plumbing
    Jul 28$21,000
  10. Remodel existing second floor bathroom
    41 Sheridan St · 0.20 mi SW · Alteration or repair
    Jul 22$45,800
  11. Install gas stove
    76 Sheridan St · 0.19 mi SW · Plumbing
    Jul 21$1,500
  12. Jul 20$8,000
  13. Unit #1 Replace kitchen cabinets
    2 Mark St · 0.23 mi W · Alteration or repair
    Jul 8$32,000
  14. Remodeling kitchen
    2 Mark St · 0.23 mi W · Electrical
    Jun 23not listed
  15. Jun 9$7,500
  16. Jun 8$1,695
  17. Jun 5$5,000
  18. Jun 1$15,732
  19. Jun 1$42,487
  20. May 29$52,668
  21. Renovate two units (each) complete
    79a Sheridan St · 0.24 mi SW · Alteration or repair
    May 20$12,400
  22. May 18$30,000
  23. May 18$14,022
  24. Remove and replace existing deck
    148 Minden St · 0.21 mi NW · Fence, wall or deck
    May 12$41,900
  25. Remove and replace existing deck
    40 Day St · 0.21 mi NW · Fence, wall or deck
    May 12$49,800
  26. Kitchen remodel
    11 Bynner St · 0.20 mi W · Plumbing
    May 7$3,000
  27. May 6$45,000
  28. May 5$6,500
  29. May 4$4,000

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 18:32 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near