Nearby Permits
Map of 104 permits within a quarter mile of 375 Silver StAlteration or repair, 415 W Fourth St, Oct 1, 2026Plumbing, 506 E Fourth St, Sep 30, 2026Plumbing, 342 W Third St, Sep 29, 2026Plumbing, 34 H St, Sep 28, 2026Plumbing, 21 Thomas Pk, Sep 25, 2026Alteration or repair, 13 Gates St, Sep 25, 2026Roofing, 353-361 Athens St, Sep 24, 2026Alteration or repair, 284 Bowen St, Sep 24, 2026Alteration or repair, 75 Old Harbor St, Sep 24, 2026Plumbing, 509-511 E Second St, Sep 23, 2026Alteration or repair, 9 Gates St, Sep 22, 2026Alteration or repair, 106 H St, Sep 22, 2026Alteration or repair, 13 Gates St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Alteration or repair, 541 E Fourth St, Sep 17, 2026Roofing, 6 G St, Sep 17, 2026Alteration or repair, 303 Bolton St, Sep 16, 2026Roofing, 409 W Fourth St, Sep 16, 2026Alteration or repair, 106 H St, Sep 10, 2026Electrical, 541 E Fourth St, Sep 10, 2026Alteration or repair, 449 E Fifth St, Sep 10, 2026Electrical, 2 G St, Sep 8, 2026Other, 53 Thomas Pk, Sep 4, 2026Alteration or repair, 2 G St, Aug 31, 2026Fence, wall or deck, 291 W Fifth St, Aug 31, 2026Roofing, 277 Silver St, Aug 28, 2026Alteration or repair, 507 E Fifth St, Aug 28, 2026Alteration or repair, 78 H St, Aug 27, 2026Alteration or repair, 13 Gates St, Aug 27, 2026Addition, 421 E Sixth St, Aug 27, 2026Electrical, 288 Bowen St, Aug 24, 2026Addition, 63 Telegraph St, Aug 24, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Electrical, 175 F St, Aug 14, 2026Plumbing, 148-150 F St, Aug 13, 2026Alteration or repair, 75-77 Dorchester St, Aug 13, 2026Alteration or repair, 63 Telegraph St, Aug 7, 2026Electrical, 8 Atlantic St, Aug 5, 2026Electrical, 395 W Fourth St, Aug 5, 2026Electrical, 432-434 E Sixth St, Aug 4, 2026Plumbing, 58 Thomas Pk, Jul 31, 2026Electrical, 430 E Eighth St, Jul 31, 2026Alteration or repair, 503 E Fifth St, Jul 30, 2026Alteration or repair, 8 Atlantic St, Jul 30, 2026Alteration or repair, 61 Story St, Jul 30, 2026Plumbing, 58 Thomas Pk, Jul 29, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Electrical, 469 E Third St, Jul 20, 2026Alteration or repair, 432-434 E Sixth St, Jul 16, 2026Roofing, 19 Mercer St, Jul 15, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 470 E Sixth St, Jul 14, 2026Electrical, 449 E Fifth St, Jul 13, 2026Alteration or repair, 21 Atlantic St, Jul 8, 2026Plumbing, 21 Atlantic St, Jul 8, 2026Plumbing, 34 Emerson St, Jul 7, 2026Plumbing, 260-262 Gold St, Jul 6, 2026Alteration or repair, 458-460 E Sixth St, Jun 26, 2026Alteration or repair, 21 Thomas Pk, Jun 24, 2026Alteration or repair, 462 E Seventh St, Jun 23, 2026Plumbing, 477 E Fourth St, Jun 23, 2026Electrical, 477 E Fourth St, Jun 22, 2026Alteration or repair, 112 H St, Jun 22, 2026Plumbing, 616 E Fourth St, Jun 18, 2026Plumbing, 616 E Fourth St, Jun 18, 2026Alteration or repair, 75 Old Harbor St, Jun 17, 2026Alteration or repair, 380-380h E Eighth St, Jun 15, 2026Alteration or repair, 403 W Fourth St, Jun 9, 2026Demolition, 75-77 Dorchester St, Jun 9, 2026Electrical, 190 F St, Jun 8, 2026Roofing, 70 G St, Jun 4, 2026Alteration or repair, 5 Colebrook St, Jun 3, 2026Plumbing, 43 G St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Electrical, 260-262 Gold St, Jun 1, 2026Electrical, 187 Dorchester St, Jun 1, 2026Mechanical (HVAC), 9 Gates St, May 28, 2026Plumbing, 454-456 E Sixth St, May 28, 2026Plumbing, 187 Dorchester St, May 28, 2026Electrical, 11 Dorchester St, May 27, 2026Plumbing, 27 G St, May 26, 2026Plumbing, 175 F St, May 24, 2026Plumbing, 175 F St, May 24, 2026Alteration or repair, 416 E Seventh St, May 22, 2026Plumbing, 72 G St, May 22, 2026Roofing, 69 Old Harbor St, May 18, 2026Plumbing, 449 E Fifth St, May 12, 2026Plumbing, 449 E Fifth St, May 12, 2026Alteration or repair, 25 Colebrook St, May 8, 2026Alteration or repair, 291 W Third St, May 7, 2026Plumbing, 469 E Third St, May 6, 2026Plumbing, 469 E Third St, May 6, 2026Plumbing, 260-262 Gold St, May 6, 2026Plumbing, 260-262 Gold St, May 5, 2026Alteration or repair, 70 G St, May 4, 2026Alteration or repair, 260-262 Gold St, May 4, 2026Alteration or repair, 469 E Sixth St, May 1, 2026Plumbing, 469 E Sixth St, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

375 Silver St

Boston, MA 02127

The biggest project within a quarter mile since May 1: an $8.4M alteration or repair at 75-77 Dorchester St, permitted Aug 13.

Eight permits on record here. The newest, Dec 8, 2025: Windows replacement. Within a quarter mile, the city has issued 104 more permits (99 projects) since May 1.

MayJunJulAugSepOct
Here8 permits · 375 Silver St
  1. Windows replacement
    Alteration or repair
    Dec 8, 2025$12,600
  2. Feb 13, 2019$975
  3. Apr 12, 2017$40,000
  4. Mar 15, 2017$37,000
  5. Nov 1, 2013$2,000
  6. Aug 16, 2013$3,000
  7. Jul 18, 2013not listed
  8. Jul 8, 2013$26,870
Next doorunder 250 ft · 4 permits
  1. Sep 30$500
  2. Water heater @ 45
    43 G St · 220 ft SE · Plumbing
    Jun 1$650
  3. Water heater replacement @ 45
    43 G St · 220 ft SE · Plumbing
    Jun 1$650
  4. May 26$1,800
This block250 to 1,000 ft · 51 permits in 49 projects
  1. Oct 1$39,000
  2. Sep 29$8,000
  3. Remodeling
    21 Thomas Pk · 520 ft SW · Plumbing
    Sep 25$4,000
  4. Sep 24$14,123
  5. Insulation &
    284 Bowen St · 990 ft W · Alteration or repair
    Sep 24$3,887
  6. Sep 23$2,500
  7. Sep 18$1,500
  8. Sep 17$57,000
  9. Sep 17$19,000
  10. Gut remodel bathroom - existing layout
    303 Bolton St · 660 ft N · Alteration or repair
    Sep 16$27,000
  11. Sep 10$5,100
  12. Confirm living space in basement
    449 E Fifth St · 800 ft SE · Alteration or repair
    Sep 10$15,000
  13. Sep 8$1,200
  14. 5 double hung replacement windows
    2 G St · 540 ft NE · Alteration or repair
    Aug 31$7,800
  15. Remove and replace 1 window
    291 W Fifth St · 910 ft W · Fence, wall or deck
    Aug 31$10,612
  16. Aug 28$12,000
  17. Aug 27$4,000
  18. Aug 27not listed
  19. Aug 24$2,500
  20. Aug 14$5,500
  21. Install new gastove
    432-434 E Sixth St · 820 ft SE · Plumbing
    Aug 14$750
  22. Aug 13$8,406,316
  23. Aug 5$1,400
  24. Aug 4$18,000
  25. Building a Partition Wall with Misc
    8 Atlantic St · 390 ft SW · Alteration or repair
    Jul 30$35,555
  26. Jul 30$12,000
  27. Jul 22$2,500
  28. Jul 16$169,848
  29. Jul 13$20,000
  30. Jul 8$16,121
  31. Jul 8$4,959
  32. Gas furnace replacement
    34 Emerson St · 840 ft NE · Plumbing
    Jul 7$10,000
  33. Jul 6$2,500
  34. Replace deck beam and hardware
    458-460 E Sixth St · 990 ft SE · Alteration or repair
    Jun 26$11,946
  35. Jun 24$77,430
  36. Jun 23$1,000
  37. 2 counter outlets
    477 E Fourth St · 320 ft SW · Electrical
    Jun 22$400
  38. Jun 9$50,000
  39. Strip and reroof
    70 G St · 540 ft SE · Roofing
    Jun 4$8,900
  40. Jun 1$30,000
  41. May 28$9,500
  42. May 27$6,850
  43. May 22$60,000
  44. May 12$12,000
  45. May 12$4,000
  46. Disconnect stove
    260-262 Gold St · 910 ft W · Plumbing
    May 6not listed
  47. May 5$5,000
  48. May 4$15,012
  49. May 4$500,000
Within a quarter mile1,000 ft to ¼ mi · 49 permits in 46 projects
  1. Sep 28$785,200
  2. Gut renovation of existing building
    13 Gates St · 0.20 mi SW · Alteration or repair
    Sep 25$625,000
  3. Amendment to ALT1856561
    75 Old Harbor St · 0.23 mi SW · Alteration or repair
    Sep 24$85,902
  4. Sep 22$9,500
  5. Clarify Occupancy as a Single Family Residence
    106 H St · 0.19 mi E · Alteration or repair
    Sep 22not listed
  6. Sep 18$2,000
  7. Sep 18$1,500
  8. Gas Boiler
    430 E Eighth St · 0.25 mi S · Plumbing
    Sep 18$1,000
  9. Sep 16$11,025
  10. Sep 10$15,000
  11. Sep 4$7,500
  12. Aug 28not listed
  13. This application is only to declare occupancy
    13 Gates St · 0.20 mi SW · Alteration or repair
    Aug 27not listed
  14. Aug 24$153,400
  15. Aug 14$1,000
  16. Aug 13$1,895
  17. Aug 7$5,000
  18. Aug 5$5,000
  19. Jul 31$500
  20. Jul 31$5,000
  21. Jul 30$9,500
  22. Jul 29$8,000
  23. Wire single family home
    469 E Third St · 0.22 mi NE · Electrical
    Jul 20$37,000
  24. Jul 15$46,100
  25. Installing Bryant 24K BTU Outdoor Unit × 2 permits
    4 Jason Te · 0.23 mi S · Electrical
    Jul 14$26,922
  26. Jul 14$1,000
  27. Jun 23$10,000
  28. Confirm occupancy of existing 3 family
    112 H St · 0.20 mi E · Alteration or repair
    Jun 22not listed
  29. Jun 18$3,500
  30. Jun 18$3,500
  31. Jun 17$85,902
  32. Jun 15$150,000
  33. Jun 9$20,250
  34. Jun 8$3,200
  35. Back deck replacement
    5 Colebrook St · 0.23 mi SE · Alteration or repair
    Jun 3$100,000
  36. Bathroom reno
    187 Dorchester St · 0.24 mi W · Electrical
    Jun 1$1,500
  37. May 28$42,427
  38. May 28$3,000
  39. 9 Residential units new construction × 2 permits
    175 F St · 0.21 mi N · Plumbing
    May 24$232,500
  40. May 22$5,500
  41. May 18$50,000
  42. May 8$300,000
  43. May 7$3,852
  44. Single Family New Construction × 2 permits
    469 E Third St · 0.22 mi NE · Plumbing
    May 6$40,000
  45. May 1$17,640
  46. May 1$2,500

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 15:38 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near