Nearby Permits
Map of 83 permits within a quarter mile of 41 Blakeville StAlteration or repair, 2-4 Blakeville St, Sep 30, 2026Electrical, 76 Barry St, Sep 30, 2026Electrical, 84 Clarkson St, Sep 25, 2026Electrical, 98 Rosseter St, Sep 25, 2026Fence, wall or deck, 101-103 Rosseter St, Sep 23, 2026Alteration or repair, 135-137 Olney St, Sep 22, 2026Plumbing, 135-137 Olney St, Sep 22, 2026Alteration or repair, 49 Homes Av, Sep 21, 2026Alteration or repair, 130 Hamilton St, Sep 21, 2026Electrical, 80 Homes Av, Sep 21, 2026Electrical, 70 Hamilton St, Sep 15, 2026Roofing, 169 Bowdoin St, Sep 10, 2026Solar, 191-195 Bowdoin St, Sep 10, 2026Solar, 71-73 Richfield St, Sep 4, 2026Solar, 42 Richfield St, Sep 4, 2026Electrical, 71-73 Richfield St, Sep 4, 2026Roofing, 123 Olney St, Aug 31, 2026Alteration or repair, 85 Norton St, Aug 31, 2026Electrical, 38 Olney St, Aug 27, 2026Electrical, 32 Blakeville St, Aug 27, 2026Electrical, 85 Olney St, Aug 24, 2026Alteration or repair, 27 Stonehurst St, Aug 24, 2026Electrical, 42 Richfield St, Aug 21, 2026Solar, 42 Richfield St, Aug 20, 2026Alteration or repair, 56 Everton St, Aug 19, 2026Electrical, 260-268a Bowdoin St, Aug 18, 2026Alteration or repair, 355 Geneva Av, Aug 17, 2026Alteration or repair, 3 Topliff St, Aug 17, 2026Roofing, 27 Stonehurst St, Aug 17, 2026Electrical, 59 Olney St, Aug 13, 2026Electrical, 38 Olney St, Aug 12, 2026Electrical, 260-268a Bowdoin St, Aug 12, 2026Electrical, 70-72 Clarkson St, Aug 10, 2026Alteration or repair, 31 Blakeville St, Aug 9, 2026Solar, 98 Rosseter St, Aug 6, 2026Solar, 98 Rosseter St, Aug 6, 2026Plumbing, 70-72 Clarkson St, Aug 5, 2026Plumbing, 70-72 Clarkson St, Aug 5, 2026Plumbing, 85 Olney St, Aug 4, 2026Electrical, 98 Rosseter St, Aug 3, 2026Electrical, 36r Richfield St, Aug 3, 2026Fire systems, 276 Geneva Av, Jul 31, 2026Fire systems, 268 Geneva Av, Jul 31, 2026Fire systems, 22 Eunice St, Jul 31, 2026Fire systems, 241 Geneva Av, Jul 31, 2026Plumbing, 260-268a Bowdoin St, Jul 30, 2026Solar, 38 Rosseter St, Jul 27, 2026Electrical, 38 Rosseter St, Jul 27, 2026Plumbing, 260-268a Bowdoin St, Jul 24, 2026Electrical, 1 Richfield Pk, Jul 23, 2026Alteration or repair, 93 Bowdoin St, Jul 22, 2026Alteration or repair, 101-103 Rosseter St, Jul 21, 2026Plumbing, 112-114 Olney St, Jul 17, 2026Plumbing, 236 Geneva Av, Jul 10, 2026Plumbing, 236 Geneva Av, Jul 10, 2026Alteration or repair, 59 Olney St, Jul 9, 2026Alteration or repair, 104r Homes Av, Jul 6, 2026Alteration or repair, 70-72 Clarkson St, Jun 30, 2026Solar, 58 Homes Av, Jun 26, 2026Electrical, 223-227a Bowdoin St, Jun 26, 2026Electrical, 223-227a Bowdoin St, Jun 26, 2026Electrical, 108 Norton St, Jun 26, 2026Solar, 58 Homes Av, Jun 26, 2026Electrical, 171-179 Bowdoin St, Jun 18, 2026Plumbing, 83 Hamilton St, Jun 6, 2026Plumbing, 83 Hamilton St, Jun 5, 2026Electrical, 32 Rosseter St, Jun 5, 2026Electrical, 58 Homes Av, Jun 2, 2026Alteration or repair, 16 Levant St, Jun 1, 2026Solar, 24 Richfield St, Jun 1, 2026Alteration or repair, 207 Bowdoin St, May 29, 2026Plumbing, 22 Speedwell St, May 27, 2026Roofing, 82 Rosseter St, May 22, 2026Electrical, 22 Speedwell St, May 21, 2026Alteration or repair, 22 Speedwell St, May 20, 2026Alteration or repair, 32 Rosseter St, May 20, 2026Electrical, 31 Topliff St, May 20, 2026Alteration or repair, 260-268a Bowdoin St, May 15, 2026Alteration or repair, 79-81 Barry St, May 14, 2026Electrical, 106 Rosseter St, May 6, 2026Electrical, 59 Olney St, May 6, 2026Electrical, 32 Blakeville St, May 4, 2026New building, 5 Rock Te, May 7, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade

41 Blakeville St

Boston, MA 02121

18 permits on record here. The newest, Feb 20: Replacing gas water heater. Within a quarter mile, the city has issued 83 more permits (80 projects) since May 1. One is a new building, 350 ft away.

MayJunJulAugSepOct
Here18 permits · 41 Blakeville St
  1. Feb 20$750
  2. Feb 11$500
  3. Jan 27$7,000
  4. Dec 15, 2025$750
  5. Replacing water heater × 2 permits
    Plumbing
    Mar 25, 2024$1,000
  6. Apr 11, 2023$1,000
  7. Sep 27, 2022$26,000
  8. Mar 15, 2022$2,000
  9. Mar 10, 2022$600
  10. Jun 29, 2021 to Jul 15, 2021$26,910
  11. Feb 3, 2021$700
  12. Jan 13, 2021$1,500
  13. Jun 30, 2020$1,000
  14. Apr 23, 2020$1,000
  15. May 1, 2018$12,054
  16. Mar 23, 2017$1,000
Next doorunder 250 ft · 9 permits
  1. Aug 27$3,000
  2. Aug 27$8,000
  3. Aug 13$2,000
  4. Low voltage alarm install
    38 Olney St · 170 ft E · Electrical
    Aug 12$1,200
  5. Aug 9$11,797
  6. Installing 24v fire alarm panel
    22 Eunice St · 240 ft SE · Fire systems
    Jul 31$9,000
  7. Jul 9$17,000
  8. Boiler wiring and co detector
    59 Olney St · 200 ft NW · Electrical
    May 6$600
  9. May 4$6,000
This block250 to 1,000 ft · 30 permits in 29 projects · 1 new building, $300,000
  1. Remove & replace 1 storm door
    2-4 Blakeville St · 480 ft S · Alteration or repair
    Sep 30$26,527
  2. Sep 30$200
  3. Sep 10$17,500
  4. Sep 10$269,715
  5. Sep 4$54,468
  6. Aug 20 to Sep 4$74,468
  7. Sep 4$54,468
  8. Mass save insulation and air sealing
    85 Norton St · 970 ft E · Alteration or repair
    Aug 31$9,139
  9. Aug 24$10,000
  10. Aug 21$2,200
  11. Remove and replace deck structure
    56 Everton St · 510 ft S · Alteration or repair
    Aug 19$16,000
  12. Aug 17$61,000
  13. Aug 4$26,000
  14. Aug 3$3,250
  15. Jul 31$9,000
  16. Jul 31$9,000
  17. Jul 31$9,000
  18. Jul 23$1,250
  19. Jul 17$2,029
  20. Jul 10$4,000
  21. Gas Piping for 3 Dryers
    236 Geneva Av · 700 ft W · Plumbing
    Jul 10$4,000
  22. Jun 18$95,000
  23. Renovation
    83 Hamilton St · 980 ft NE · Plumbing
    Jun 6$12,000
  24. Jun 5$12,000
  25. Residential weatherization/air sealing
    16 Levant St · 760 ft SE · Alteration or repair
    Jun 1$2,000
  26. May 29$38,600
  27. May 20$2,631
  28. May 14$58,850
  29. May 7$300,000
Within a quarter mile1,000 ft to ¼ mi · 44 permits in 42 projects
  1. Sep 25$499
  2. Sep 25$7,500
  3. Retaining Wall and front entrance
    101-103 Rosseter St · 0.23 mi SW · Fence, wall or deck
    Sep 23$35,000
  4. Sep 22$36,802
  5. Sep 22$8,000
  6. Renovate existing first-floor unit
    49 Homes Av · 0.20 mi SE · Alteration or repair
    Sep 21$40,000
  7. Sep 21$64,140
  8. Sep 21$14,000
  9. New service
    70 Hamilton St · 0.22 mi N · Electrical
    Sep 15$6,000
  10. Aug 31$19,683
  11. Aug 24not listed
  12. Aug 18$3,200
  13. Aug 17$1,000
  14. Aug 17$21,391
  15. Aug 12$2,800
  16. Aug 10$34,000
  17. Aug 6$98,878
  18. Aug 5$10,000
  19. Reconnect 2 stoves
    70-72 Clarkson St · 0.24 mi NE · Plumbing
    Aug 5$1,000
  20. 3+Meter Relocation
    98 Rosseter St · 0.20 mi SW · Electrical
    Aug 3$12,000
  21. Gas appliance permit
    260-268a Bowdoin St · 0.25 mi NE · Plumbing
    Jul 30$12,000
  22. Jul 27$59,829
  23. Jul 27$3,500
  24. Plumbing addittion
    260-268a Bowdoin St · 0.25 mi NE · Plumbing
    Jul 24$24,000
  25. Residential weatherization/air sealing
    93 Bowdoin St · 0.23 mi S · Alteration or repair
    Jul 22$5,000
  26. Jul 21$15,049
  27. Jul 6$2,000
  28. Jun 30$124,825
  29. Jun 26$32,100
  30. Replace one panel
    223-227a Bowdoin St · 0.19 mi E · Electrical
    Jun 26$2,000
  31. Jun 26$1,000
  32. Upgrade 200 amp service
    108 Norton St · 0.23 mi E · Electrical
    Jun 26$2,000
  33. Replace bathroom fan
    32 Rosseter St · 0.25 mi W · Electrical
    Jun 5$1,000
  34. 100A meter/main combo
    58 Homes Av · 0.19 mi SE · Electrical
    Jun 2$2,200
  35. Jun 1$21,597
  36. May 27$6,000
  37. May 22$28,281
  38. May 21$850
  39. First Floor Bathroom Renovation
    22 Speedwell St · 0.20 mi SE · Alteration or repair
    May 20$27,900
  40. May 20$19,050
  41. Install kitchen hood sheet, tile floor
    260-268a Bowdoin St · 0.25 mi NE · Alteration or repair
    May 15$104,000
  42. Adding house meter
    106 Rosseter St · 0.20 mi SW · Electrical
    May 6$7,800

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 11:42 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near