Nearby Permits
Map of 96 permits within a quarter mile of 460 E Eighth StPlumbing, 506 E Fourth St, Sep 30, 2026Plumbing, 21 Thomas Pk, Sep 25, 2026Plumbing, 368 E Eighth St, Sep 24, 2026Alteration or repair, 106 H St, Sep 22, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Electrical, 180 H St, Sep 18, 2026Alteration or repair, 541 E Fourth St, Sep 17, 2026Alteration or repair, 535 E Fifth St, Sep 17, 2026Alteration or repair, 518 E Sixth St, Sep 15, 2026Alteration or repair, 106 H St, Sep 10, 2026Fire systems, 208 H St, Sep 10, 2026Electrical, 541 E Fourth St, Sep 10, 2026Alteration or repair, 449 E Fifth St, Sep 10, 2026Other, 53 Thomas Pk, Sep 4, 2026Electrical, 158 I St, Sep 4, 2026Alteration or repair, 485 E Seventh St, Sep 3, 2026Electrical, 4 Springer St, Sep 3, 2026Plumbing, 158 I St, Sep 1, 2026Alteration or repair, 507 E Fifth St, Aug 28, 2026Addition, 421 E Sixth St, Aug 27, 2026Plumbing, 525 E Sixth St, Aug 26, 2026Electrical, 31 Marine Rd, Aug 25, 2026Fire systems, 31 Marine Rd, Aug 20, 2026Electrical, 31 Marine Rd, Aug 20, 2026Roofing, 498 E Sixth St, Aug 17, 2026Plumbing, 180 H St, Aug 17, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 180 H St, Aug 14, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Electrical, 432-434 E Sixth St, Aug 4, 2026Plumbing, 58 Thomas Pk, Jul 31, 2026Plumbing, 530 E Seventh St, Jul 31, 2026Electrical, 430 E Eighth St, Jul 31, 2026Alteration or repair, 503 E Fifth St, Jul 30, 2026Plumbing, 15 Brewster St, Jul 30, 2026Plumbing, 15 Brewster St, Jul 30, 2026Electrical, 574 E Eighth St, Jul 30, 2026Alteration or repair, 61 Story St, Jul 30, 2026Plumbing, 58 Thomas Pk, Jul 29, 2026Plumbing, 530 E Seventh St, Jul 29, 2026Alteration or repair, 104 Old Harbor St, Jul 28, 2026Electrical, 574 E Eighth St, Jul 24, 2026Plumbing, 4 Springer St, Jul 21, 2026Plumbing, 574 E Eighth St, Jul 21, 2026Alteration or repair, 530 E Seventh St, Jul 21, 2026Plumbing, 135 I St, Jul 17, 2026Alteration or repair, 432-434 E Sixth St, Jul 16, 2026Electrical, 4 Jason Te, Jul 14, 2026Alteration or repair, 530 E Seventh St, Jul 14, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 470 E Sixth St, Jul 14, 2026Roofing, 522 E Fifth St, Jul 13, 2026Plumbing, 135 I St, Jul 13, 2026Electrical, 449 E Fifth St, Jul 13, 2026Alteration or repair, 158 I St, Jul 1, 2026Alteration or repair, 458-460 E Sixth St, Jun 26, 2026Alteration or repair, 574 E Eighth St, Jun 25, 2026Alteration or repair, 574 E Eighth St, Jun 25, 2026Alteration or repair, 574 E Eighth St, Jun 25, 2026Alteration or repair, 21 Thomas Pk, Jun 24, 2026Alteration or repair, 462 E Seventh St, Jun 23, 2026Roofing, 184 I St, Jun 22, 2026Alteration or repair, 112 H St, Jun 22, 2026Alteration or repair, 509r E Fifth St, Jun 16, 2026Alteration or repair, 380-380h E Eighth St, Jun 15, 2026Alteration or repair, 1528-1530 Columbia Rd, Jun 12, 2026Plumbing, 500 E Eighth St, Jun 12, 2026Plumbing, 500 E Eighth St, Jun 12, 2026Alteration or repair, 188 I St, Jun 8, 2026Roofing, 70 G St, Jun 4, 2026Alteration or repair, 455 E Seventh St, Jun 4, 2026Alteration or repair, 5 Colebrook St, Jun 3, 2026Alteration or repair, 526-526r E Fifth St, Jun 1, 2026Alteration or repair, 500 E Eighth St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Alteration or repair, 490 E Seventh St, May 29, 2026Plumbing, 454-456 E Sixth St, May 28, 2026Plumbing, 30-32 Marine Rd, May 27, 2026Plumbing, 30-32 Marine Rd, May 27, 2026Alteration or repair, 416 E Seventh St, May 22, 2026Alteration or repair, 496 E Seventh St, May 22, 2026Plumbing, 72 G St, May 22, 2026Electrical, 208 H St, May 20, 2026Plumbing, 449 E Fifth St, May 12, 2026Plumbing, 449 E Fifth St, May 12, 2026Electrical, 490 E Seventh St, May 11, 2026Alteration or repair, 25 Colebrook St, May 8, 2026Fence, wall or deck, 10 Marine Rd, May 6, 2026Alteration or repair, 70 G St, May 4, 2026Fire systems, 500 E Eighth St, May 4, 2026Electrical, 500 E Eighth St, May 4, 2026Alteration or repair, 469 E Sixth St, May 1, 2026Plumbing, 469 E Sixth St, May 1, 2026New building, 4 Springer St, Aug 10, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

460 E Eighth St

Boston, MA 02127

Two permits on record here. The newest, Jul 27: Strip and re-roof. Within a quarter mile, the city has issued 96 more permits (94 projects) since May 1. One is a new building, 520 ft away.

MayJunJulAugSepOct
Here2 permits · 460 E Eighth St
  1. Jul 27$18,500
  2. Repair siding and window trim
    Alteration or repair
    Aug 26, 2014$5,000
This block250 to 1,000 ft · 65 permits in 63 projects · 1 new building, $454,638
  1. Sep 18$1,500
  2. Gas Boiler
    430 E Eighth St · 280 ft W · Plumbing
    Sep 18$1,000
  3. Sep 18$30,000
  4. Hard wired smokes single famil
    208 H St · 480 ft SE · Fire systems
    Sep 10$2,500
  5. Confirm living space in basement
    449 E Fifth St · 800 ft N · Alteration or repair
    Sep 10$15,000
  6. Sep 4$18,000
  7. Sep 3$97,340
  8. 100 amp temp service
    4 Springer St · 520 ft E · Electrical
    Sep 3$2,000
  9. Sep 1$15,000
  10. Aug 27not listed
  11. Aug 17$10,000
  12. New plumbing for (3) condos
    180 H St · 390 ft E · Plumbing
    Aug 17$30,000
  13. Aug 14$5,500
  14. Gas piping for (3) stoves
    180 H St · 390 ft E · Plumbing
    Aug 14$5,000
  15. Aug 14$750
  16. Aug 10$454,638
  17. Aug 4$18,000
  18. Jul 31$500
  19. Jul 31$15,000
  20. Jul 31$5,000
  21. Jul 30$9,500
  22. WH Replacement × 2 permits
    15 Brewster St · 580 ft E · Plumbing
    Jul 30$1,000
  23. Jul 30$12,000
  24. Jul 29$8,000
  25. Jul 29$15,000
  26. Jul 21$30,000
  27. Jul 21not listed
  28. Jul 16$169,848
  29. Installing Bryant 24K BTU Outdoor Unit × 2 permits
    4 Jason Te · 520 ft W · Electrical
    Jul 14$26,922
  30. Jul 14$300,000
  31. Jul 14$1,000
  32. Jul 13$20,000
  33. Scope of work &
    158 I St · 920 ft NE · Alteration or repair
    Jul 1$95,000
  34. Replace deck beam and hardware
    458-460 E Sixth St · 620 ft N · Alteration or repair
    Jun 26$11,946
  35. Jun 23$10,000
  36. Jun 22$12,633
  37. Confirm occupancy of existing 3 family
    112 H St · 960 ft N · Alteration or repair
    Jun 22not listed
  38. Jun 16$110,000
  39. Jun 15$150,000
  40. Jun 12$17,000
  41. Jun 12$12,000
  42. Gas range
    500 E Eighth St · 310 ft E · Plumbing
    Jun 12$1,500
  43. I.E Install 5 double hung windows
    188 I St · 810 ft E · Alteration or repair
    Jun 8$8,552
  44. Strip and reroof
    70 G St · 850 ft NW · Roofing
    Jun 4$8,900
  45. Replaced the siding, Lap Cement siding
    455 E Seventh St · 320 ft NE · Alteration or repair
    Jun 4$15,000
  46. Back deck replacement
    5 Colebrook St · 420 ft NE · Alteration or repair
    Jun 3$100,000
  47. Cosmetic renovations of apartment 1
    500 E Eighth St · 310 ft E · Alteration or repair
    Jun 1$86,000
  48. May 29$14,488
  49. May 28$9,500
  50. May 22$5,500
  51. May 22$52,000
  52. May 22$60,000
  53. Total rewire
    208 H St · 480 ft SE · Electrical
    May 20$18,000
  54. May 12$12,000
  55. May 12$4,000
  56. May 11$4,829
  57. May 8$300,000
  58. May 6$29,000
  59. May 4$15,012
  60. May 4$1,500
  61. May 4$8,000
  62. May 1$17,640
  63. May 1$2,500
Within a quarter mile1,000 ft to ¼ mi · 31 permits
  1. Sep 30$500
  2. Remodeling
    21 Thomas Pk · 0.23 mi NW · Plumbing
    Sep 25$4,000
  3. Shower pan
    368 E Eighth St · 0.20 mi W · Plumbing
    Sep 24$3,000
  4. Clarify Occupancy as a Single Family Residence
    106 H St · 0.20 mi N · Alteration or repair
    Sep 22not listed
  5. Sep 17$57,000
  6. Sep 17$8,040
  7. Sep 15$16,500
  8. Sep 10$15,000
  9. Sep 10$5,100
  10. Sep 4$7,500
  11. Confirming occupancy of single family home
    507 E Fifth St · 0.19 mi NE · Alteration or repair
    Aug 28not listed
  12. Aug 26$1,895
  13. Aug 25$10,000
  14. Aug 20$10,000
  15. Aug 20$100,000
  16. Jul 30$4,000
  17. Jul 28$300,000
  18. Jul 24$2,500
  19. Jul 21$4,900
  20. Supply gas to Navien Combi
    135 I St · 0.19 mi NE · Plumbing
    Jul 17$1,000
  21. Jul 13$40,000
  22. Install navien combi
    135 I St · 0.19 mi NE · Plumbing
    Jul 13$5,000
  23. Jun 25$10,000
  24. Remodel existing kitchen, same layout
    574 E Eighth St · 0.19 mi E · Alteration or repair
    Jun 25$61,600
  25. Remodel existing second floor bathroom
    574 E Eighth St · 0.19 mi E · Alteration or repair
    Jun 25$26,500
  26. Jun 24$77,430
  27. Jun 1$11,500
  28. Water heater @ 45
    43 G St · 0.22 mi NW · Plumbing
    Jun 1$650
  29. Water heater replacement @ 45
    43 G St · 0.22 mi NW · Plumbing
    Jun 1$650
  30. Replacement of boiler
    30-32 Marine Rd · 0.23 mi E · Plumbing
    May 27$9,000
  31. May 27$9,000

Boston Inspectional Services Department updated its data Oct 2, 2026. We checked it Oct 3, 05:42 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near