- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Paperwork or other
- Zoning request
460 E Third St
Boston, MA 02127
The biggest project within an eighth of a mile since May 1: a $785,200 project at 34 H St, permitted Sep 28.
One permit on record here. The newest, Sep 19, 2025: Install a new steel spiral stair case for egress safety base on plan submitted Install a new 36x80 exterior. Within an eighth of a mile, the city has issued 32 more permits (29 projects) since May 1.
-
Install a new steel spiral stair case for egress safety base on plan submitted Install a new 36x80 exterior…Alteration or repairSep 19, 2025$41,850
-
Gas plumbing installation for one (1) 90,000 BTU natural gas-fired furnace serving Unit 1R at 34–36 H St…34 H St · 130 ft NE · PlumbingSep 28$785,200
-
Wire single family home469 E Third St · 120 ft SE · ElectricalJul 20$37,000
-
May 6$40,000
-
1 fireplace on first floor and 1 generator on the roof2 H St · 440 ft N · PlumbingOct 5$5,000
-
Rough and finish full bathroom14 I St · 580 ft NE · PlumbingSep 24$5,000
-
Gas furnace replacement509-511 E Second St · 460 ft W · PlumbingSep 23$2,500
-
Install State 50 Gallon, Gas Hot Water Heater in the Basement × 2 permits82 H St · 550 ft S · PlumbingSep 18$1,500
-
3rd floor kitchen renovation adding laundry to kitchen and adding sink and toilet to bathroom132-134 Emerson St · 450 ft SE · PlumbingSep 1$6,000
-
Panel Upgrade, bathroom fan swap132-134 Emerson St · 450 ft SE · ElectricalAug 28$5,000
-
Replace decking and railings on existing 12 x 20 deck78 H St · 510 ft S · Alteration or repairAug 27$4,000
-
Replace tub to shower132-134 Emerson St · 450 ft SE · PlumbingAug 17$1,500
-
Wiring electric car charger14 I St · 580 ft NE · Alteration or repairJul 31$1,900
-
Rebuild existing roof deck in the same shape size and location and the existing deck15 I St · 520 ft NE · Alteration or repairJul 30$39,000
-
Demolish existing bathroom, closet, office14 I St · 580 ft NE · Alteration or repairJul 14$100,000
-
Replacement of 1 window and 2 doors8 Barnard Pl · 530 ft E · Alteration or repairJul 14$9,000
-
Tub to shower conversion132-134 Emerson St · 450 ft SE · OtherJul 8$18,000
-
Installation and wiring of replacement mixed system into existing ductwork consisting of two condensers559a-559d E Second St · 280 ft NE · Alteration or repairJul 8$16,132
-
Gas furnace replacement34 Emerson St · 380 ft W · PlumbingJul 7$10,000
-
Replacing a tankless combi Boiler with a tankless water heater559a-559d E Second St · 280 ft NE · PlumbingJul 1$4,840
-
Installation and wiring of replacement mixed system into existing ductwork consisting of two condensers559a-559d E Second St · 280 ft NE · ElectricalJul 1$5,377
-
200 amp Delta 3 phase service120-126 Emerson St · 390 ft SE · ElectricalJun 26$9,000
-
To install all of the electrical including: - Lighting (normal + emergency) - Power distribution (receptacles…120-126 Emerson St · 390 ft SE · ElectricalJun 19$53,000
-
We are installing a grease trap and electric hot water heater in the basement120-126 Emerson St · 390 ft SE · PlumbingJun 18$40,000
-
Installation of a Custom Comfort 18,000 BTU Xtreme Heat Pump Unit9-11 Linley Te · 590 ft E · Mechanical (HVAC)Jun 8$12,273
-
New GFCI - New dedicated circuit9-11 Linley Te · 590 ft E · ElectricalJun 5$1,050
-
Install 8 new emergency battery lights11 Dorchester St · 630 ft NW · ElectricalMay 27$6,850
-
Adding Gong Cha (Bubble Tea) to an existing empty commercial space120-126 Emerson St · 390 ft SE · Alteration or repairMay 22$130,000
-
Run a exposed indirect drain from prep sink to floor basin with correct air gap455-457 E First St · 520 ft N · PlumbingMay 18$2,650
-
May 12$1,100
Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.
Boston's decision codes, from its data dictionary: AppProv, "approved with conditions".
-
Filed May 21
-
Hearing date Sep 22filed Jul 17, 2025
-
Zoning appeal; the description is on the city's appeal tracker.555 to 567 E Broadway · 430 ft S · Approved · city: "ZBA Decision Finalized", decision "AppProv" · case BOA1855511Decided Sep 18hearing Sep 8
-
To change the occupancy from a 3 family to a 2 family556 E Broadway · 330 ft SW · Approved · city: "Appeal Closed", decision "Approved" · case BOA1834696Decided Jul 24hearing Jul 14
-
Zoning appeal: "Provide an easement to allow vehicles to pass over the property to both parking behind 524…"524 E Broadway · 580 ft SW · Withdrawn · city: "Appeal Closed", decision "Withdrawn" · case BOA1792286Decided Jul 9filed Oct 28, 2025
- 462 E Third St newest permit May 16, 2025
- 458 E Third St newest permit Aug 1, 2025
- 467 E Third St newest permit Feb 21, 2025
- 468 E Third St newest permit Sep 18, 2025
- 469 E Third St newest permit Jul 20, 2026
- 474 E Third St newest permit Feb 23, 2026
- 487 E Third St newest permit Dec 17, 2025
- 506 E Third St newest permit Oct 16, 2024
- 508 E Third St newest permit Apr 2, 2026
- 510 E Third St newest permit Oct 16, 2025
Boston Inspectional Services Department updated its data Oct 7, 2026. We checked it Oct 8, 15:19 UTC. See the city's official records.
Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 8, 11:17 UTC.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning