Nearby Permits
Map of 112 permits within a quarter mile of 498 E Fourth StAlteration or repair, 415 W Fourth St, Oct 1, 2026Plumbing, 506 E Fourth St, Sep 30, 2026Plumbing, 342 W Third St, Sep 29, 2026Plumbing, 21 Thomas Pk, Sep 25, 2026Alteration or repair, 13 Gates St, Sep 25, 2026Roofing, 353-361 Athens St, Sep 24, 2026Alteration or repair, 284 Bowen St, Sep 24, 2026Plumbing, 368 E Eighth St, Sep 24, 2026Alteration or repair, 75 Old Harbor St, Sep 24, 2026Plumbing, 509-511 E Second St, Sep 23, 2026Alteration or repair, 9 Gates St, Sep 22, 2026Alteration or repair, 106 H St, Sep 22, 2026Alteration or repair, 13 Gates St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Alteration or repair, 541 E Fourth St, Sep 17, 2026Roofing, 6 G St, Sep 17, 2026Alteration or repair, 303 Bolton St, Sep 16, 2026Roofing, 409 W Fourth St, Sep 16, 2026Alteration or repair, 106 H St, Sep 10, 2026Electrical, 541 E Fourth St, Sep 10, 2026Alteration or repair, 449 E Fifth St, Sep 10, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Electrical, 2 G St, Sep 8, 2026Other, 53 Thomas Pk, Sep 4, 2026Alteration or repair, 2 G St, Aug 31, 2026Fence, wall or deck, 291 W Fifth St, Aug 31, 2026Roofing, 277 Silver St, Aug 28, 2026Alteration or repair, 78 H St, Aug 27, 2026Alteration or repair, 13 Gates St, Aug 27, 2026Addition, 421 E Sixth St, Aug 27, 2026Electrical, 288 Bowen St, Aug 24, 2026Addition, 63 Telegraph St, Aug 24, 2026Alteration or repair, 32a-32 Mercer St, Aug 19, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Electrical, 175 F St, Aug 14, 2026Plumbing, 148-150 F St, Aug 13, 2026Alteration or repair, 75-77 Dorchester St, Aug 13, 2026Alteration or repair, 63 Telegraph St, Aug 7, 2026Electrical, 8 Atlantic St, Aug 5, 2026Electrical, 395 W Fourth St, Aug 5, 2026Electrical, 432-434 E Sixth St, Aug 4, 2026Plumbing, 58 Thomas Pk, Jul 31, 2026Electrical, 430 E Eighth St, Jul 31, 2026Alteration or repair, 503 E Fifth St, Jul 30, 2026Alteration or repair, 8 Atlantic St, Jul 30, 2026Alteration or repair, 61 Story St, Jul 30, 2026Plumbing, 58 Thomas Pk, Jul 29, 2026Alteration or repair, 32a-32 Mercer St, Jul 28, 2026Alteration or repair, 104 Old Harbor St, Jul 28, 2026Alteration or repair, 32a-32 Mercer St, Jul 27, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Electrical, 469 E Third St, Jul 20, 2026Plumbing, 30 Mercer St, Jul 17, 2026Alteration or repair, 432-434 E Sixth St, Jul 16, 2026Roofing, 19 Mercer St, Jul 15, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 470 E Sixth St, Jul 14, 2026Electrical, 449 E Fifth St, Jul 13, 2026Alteration or repair, 21 Atlantic St, Jul 8, 2026Plumbing, 21 Atlantic St, Jul 8, 2026Plumbing, 34 Emerson St, Jul 7, 2026Plumbing, 260-262 Gold St, Jul 6, 2026Alteration or repair, 458-460 E Sixth St, Jun 26, 2026Alteration or repair, 21 Thomas Pk, Jun 24, 2026Alteration or repair, 462 E Seventh St, Jun 23, 2026Plumbing, 477 E Fourth St, Jun 23, 2026Electrical, 477 E Fourth St, Jun 22, 2026Alteration or repair, 112 H St, Jun 22, 2026Alteration or repair, 43 Telegraph St, Jun 22, 2026Alteration or repair, 75 Old Harbor St, Jun 17, 2026Alteration or repair, 380-380h E Eighth St, Jun 15, 2026Alteration or repair, 403 W Fourth St, Jun 9, 2026Demolition, 75-77 Dorchester St, Jun 9, 2026Alteration or repair, 43 Telegraph St, Jun 8, 2026Electrical, 190 F St, Jun 8, 2026Roofing, 70 G St, Jun 4, 2026Alteration or repair, 5 Colebrook St, Jun 3, 2026Alteration or repair, 194 Dorchester St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Electrical, 260-262 Gold St, Jun 1, 2026Electrical, 187 Dorchester St, Jun 1, 2026Mechanical (HVAC), 9 Gates St, May 28, 2026Plumbing, 454-456 E Sixth St, May 28, 2026Plumbing, 187 Dorchester St, May 28, 2026Electrical, 11 Dorchester St, May 27, 2026Plumbing, 27 G St, May 26, 2026Plumbing, 175 F St, May 24, 2026Plumbing, 175 F St, May 24, 2026Alteration or repair, 416 E Seventh St, May 22, 2026Plumbing, 72 G St, May 22, 2026Electrical, 66-68 Gates St, May 21, 2026Roofing, 69 Old Harbor St, May 18, 2026Plumbing, 449 E Fifth St, May 12, 2026Plumbing, 449 E Fifth St, May 12, 2026Alteration or repair, 25 Colebrook St, May 8, 2026Alteration or repair, 291 W Third St, May 7, 2026Plumbing, 469 E Third St, May 6, 2026Plumbing, 469 E Third St, May 6, 2026Plumbing, 260-262 Gold St, May 6, 2026Plumbing, 260-262 Gold St, May 5, 2026Alteration or repair, 70 G St, May 4, 2026Alteration or repair, 260-262 Gold St, May 4, 2026Alteration or repair, 469 E Sixth St, May 1, 2026Plumbing, 469 E Sixth St, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

498 E Fourth St

Boston, MA 02127

The biggest project within a quarter mile since May 1: an $8.4M alteration or repair at 75-77 Dorchester St, permitted Aug 13.

Six permits on record here. The newest, May 16, 2025: Replacement fixtures to basement bathroom. Within a quarter mile, the city has issued 112 more permits (107 projects) since May 1.

MayJunJulAugSepOct
Here6 permits · 498 E Fourth St
  1. May 16, 2025$2,000
  2. Bath Reno
    Electrical
    May 15, 2025$3,000
  3. Apr 28, 2025$25,500
  4. Replacement gas water heater × 2 permits
    Plumbing
    Jul 25, 2018 to Sep 4, 2018$300
  5. Jun 28, 2016$53,870
Next doorunder 250 ft · 3 permits
  1. Sep 30$500
  2. Jun 23$1,000
  3. 2 counter outlets
    477 E Fourth St · 200 ft SW · Electrical
    Jun 22$400
This block250 to 1,000 ft · 52 permits in 51 projects
  1. Oct 1$39,000
  2. Sep 29$8,000
  3. Remodeling
    21 Thomas Pk · 400 ft SW · Plumbing
    Sep 25$4,000
  4. Gut renovation of existing building
    13 Gates St · 950 ft SW · Alteration or repair
    Sep 25$625,000
  5. Sep 24$14,123
  6. Insulation &
    284 Bowen St · 900 ft W · Alteration or repair
    Sep 24$3,887
  7. Sep 22$9,500
  8. Sep 18$2,000
  9. Sep 17$57,000
  10. Sep 17$19,000
  11. Gut remodel bathroom - existing layout
    303 Bolton St · 750 ft N · Alteration or repair
    Sep 16$27,000
  12. Sep 10$5,100
  13. Confirm living space in basement
    449 E Fifth St · 840 ft SE · Alteration or repair
    Sep 10$15,000
  14. Sep 8$1,200
  15. 5 double hung replacement windows
    2 G St · 650 ft NE · Alteration or repair
    Aug 31$7,800
  16. Remove and replace 1 window
    291 W Fifth St · 820 ft W · Fence, wall or deck
    Aug 31$10,612
  17. Aug 28$12,000
  18. Aug 27not listed
  19. Aug 27not listed
  20. Aug 24$2,500
  21. Aug 14$5,500
  22. Install new gastove
    432-434 E Sixth St · 820 ft SE · Plumbing
    Aug 14$750
  23. Aug 13$8,406,316
  24. Aug 5$1,400
  25. Aug 4$18,000
  26. Jul 31$500
  27. Building a Partition Wall with Misc
    8 Atlantic St · 270 ft SW · Alteration or repair
    Jul 30$35,555
  28. Jul 29$8,000
  29. Jul 22$2,500
  30. Jul 16$169,848
  31. Jul 13$20,000
  32. Jul 8$16,121
  33. Jul 8$4,959
  34. Gas furnace replacement
    34 Emerson St · 960 ft NE · Plumbing
    Jul 7$10,000
  35. Jul 6$2,500
  36. Jun 24$77,430
  37. Jun 9$50,000
  38. Strip and reroof
    70 G St · 520 ft SE · Roofing
    Jun 4$8,900
  39. Water heater @ 45
    43 G St · 250 ft E · Plumbing
    Jun 1$650
  40. Water heater replacement @ 45
    43 G St · 250 ft E · Plumbing
    Jun 1$650
  41. Jun 1$30,000
  42. May 28$42,427
  43. May 28$9,500
  44. May 26$1,800
  45. May 22$60,000
  46. May 12$12,000
  47. May 12$4,000
  48. Disconnect stove
    260-262 Gold St · 850 ft W · Plumbing
    May 6not listed
  49. May 5$5,000
  50. May 4$15,012
  51. May 4$500,000
Within a quarter mile1,000 ft to ¼ mi · 57 permits in 53 projects
  1. Shower pan
    368 E Eighth St · 0.23 mi S · Plumbing
    Sep 24$3,000
  2. Amendment to ALT1856561
    75 Old Harbor St · 0.21 mi SW · Alteration or repair
    Sep 24$85,902
  3. Sep 23$2,500
  4. Clarify Occupancy as a Single Family Residence
    106 H St · 0.20 mi E · Alteration or repair
    Sep 22not listed
  5. Sep 18$1,500
  6. Sep 18$1,500
  7. Gas Boiler
    430 E Eighth St · 0.24 mi S · Plumbing
    Sep 18$1,000
  8. Sep 16$11,025
  9. Sep 10$15,000
  10. Sep 8$18,500
  11. 2 HVAC, 2 stove
    32a-32 Mercer St · 0.24 mi SW · Plumbing
    Sep 8$4,000
  12. Sep 4$7,500
  13. Aug 27$4,000
  14. Aug 24$153,400
  15. Aug 19$450,000
  16. Aug 14$1,000
  17. Aug 13$1,895
  18. Aug 7$5,000
  19. Aug 5$5,000
  20. Jul 31$5,000
  21. Jul 30$9,500
  22. Jul 30$12,000
  23. Confirm occupancy of existing 2 family.
    32a-32 Mercer St · 0.24 mi SW · Alteration or repair
    Jul 28not listed
  24. Jul 28$300,000
  25. Jul 27$32,000
  26. Wire single family home
    469 E Third St · 0.24 mi NE · Electrical
    Jul 20$37,000
  27. Emergency permit
    30 Mercer St · 0.24 mi SW · Plumbing
    Jul 17$9,500
  28. Jul 15$46,100
  29. Installing Bryant 24K BTU Outdoor Unit × 2 permits
    4 Jason Te · 0.21 mi S · Electrical
    Jul 14$26,922
  30. Jul 14$1,000
  31. Replace deck beam and hardware
    458-460 E Sixth St · 0.19 mi SE · Alteration or repair
    Jun 26$11,946
  32. Jun 23$10,000
  33. Confirm occupancy of existing 3 family
    112 H St · 0.21 mi E · Alteration or repair
    Jun 22not listed
  34. Jun 22$13,000
  35. Jun 17$85,902
  36. Jun 15$150,000
  37. Jun 9$20,250
  38. Jun 8$44,988
  39. Jun 8$3,200
  40. Back deck replacement
    5 Colebrook St · 0.23 mi SE · Alteration or repair
    Jun 3$100,000
  41. Replacement of (1) Patio Sliding Door
    194 Dorchester St · 0.24 mi W · Alteration or repair
    Jun 1$10,413
  42. Bathroom reno
    187 Dorchester St · 0.22 mi W · Electrical
    Jun 1$1,500
  43. May 28$3,000
  44. May 27$6,850
  45. 9 Residential units new construction × 2 permits
    175 F St · 0.22 mi N · Plumbing
    May 24$232,500
  46. May 22$5,500
  47. May 21$900
  48. May 18$50,000
  49. May 8$300,000
  50. May 7$3,852
  51. Single Family New Construction × 2 permits
    469 E Third St · 0.24 mi NE · Plumbing
    May 6$40,000
  52. May 1$17,640
  53. May 1$2,500

Boston Inspectional Services Department updated its data Oct 2, 2026. We checked it Oct 3, 20:14 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near