Skip map
Map preview
Open mapBack to list
- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
- Paperwork or other
5 Allstate Rd
Boston, MA 02125
52 permits on record here. The newest, Jul 10: Within Home Depot: Disconnect then reconnect power to Bays (no new fixtures being installed): Aisle 01: 01-007. Within a quarter mile, the city has issued 21 more permits (20 projects) since May 1.
Within
Since
Here52 permits · 5 Allstate Rd
-
Jul 10$2,775
-
Nov 4, 2025$12,000
-
Oct 22, 2025$18,000
-
Replacing 15 roof top unitsRoofingAug 27, 2025$139,734
-
Jun 12, 2025$2,630
-
Feb 14, 2025$3,390
-
Dec 18, 2024$2,140
-
Nov 13, 2023$2,000
-
Bloom Energy is submitting a permit modification for the removal of the existing battery modules at the above…Alteration or repairOct 31, 2023$150,000
-
Install back in outlets to Bay ID 01-003ElectricalOct 3, 2023$15,525
-
Aug 21, 2023$11,665
-
Exterior LED Retrofit - 33 wallpacksElectricalMay 25, 2023$5,000
-
Dec 21, 2022$1,500
-
Installation of a rooftop solar system consisting of 963 solar panels attached to a ballasted &SolarSep 21, 2022$380,542
-
Jul 28, 2022$5,000
-
Jun 8, 2022$285,761
-
Modify existing in-rack system for new combustible liquids rack and new polystyrene racksFire systemsApr 7, 2022$9,000
-
Nov 15, 2021$6,000
-
Oct 6, 2021$8,000
-
Install pipe and wire for 6 recepticalsElectricalSep 21, 2021$3,200
-
Dec 18, 2019$8,000
-
Nov 4, 2019$3,500
-
Aug 22, 2019$27,768
-
Wire 10 replacement unit heatersElectricalMay 22, 2019$1,000
-
Home Depot Garden Center -;Installation of new;steel shelving structures within the Home Depot Garden Center…Alteration or repairMay 6, 2019$170,000
-
Jan 10, 2019$4,500
-
Sep 18, 2018$20,000
-
Sep 12, 2018$19,500
-
Sep 7, 2018$2,000
-
Sep 7, 2018$5,000
-
18-744. Installation of 1 Bloomenergy ES5 Fuel Cell System into the existing 1600A serviceElectricalJun 21, 2018$75,000
-
Home Depot: Interior renovation;at existing;training areaAlteration or repairFeb 22, 2018$21,300
-
Add 2 bathroomsPlumbingJan 26, 2018$20,000
-
Unit heater swap outPlumbingDec 6, 2017$4,000
-
Prep work in anticipation of ALT 760476, COST REFLECTED ON LONG FORMAlteration or repairNov 17, 2017not listed
-
Installation of one (1) Bloom Energy ES5 outdoor natural gas Energy Server and associated equipmentAlteration or repairNov 7, 2017$1,315,092
-
Aug 9, 2017$1,500
-
Aug 3, 2017$20,000
-
Renovation of 2 bathroomsElectricalJun 2, 2017$3,000
-
May 30, 2017$1,000
-
Mar 3, 2016$1,000
-
Jan 19, 2016$2,000
-
Nov 14, 2014$6,000
-
Sep 19, 2014$1,150
-
Jul 31, 2014$8,500
-
Replace water fountainPlumbingMay 21, 2013not listed
-
Repaired drain in wallPlumbingDec 7, 2012not listed
-
Relocate 1 gas fired Spot HeaterPlumbingSep 11, 2012$1,000
-
Jun 14, 2012$800
-
Replace rangePlumbingSep 21, 2011not listed
-
Jan 5, 2010$4,000
-
Remodel of mens and womens roomElectricalJan 5, 2010$2,000
Sort
This block250 to 1,000 ft · 16 permits in 15 projects
-
Rooftop solar installation14 Allstate Rd · 810 ft E · SolarOct 5$500,000
-
Rooftop solar installation8 Allstate Rd · 880 ft SE · SolarOct 5$500,000
-
Plumbing permit, no description from the city1006-1022 Massachusetts Av · 910 ft W · PlumbingSep 24not listed
-
Eliminate hand sink and add new utility sink10 Newmarket Sq · 720 ft NW · PlumbingSep 22$2,500
-
Permanently cap gas lines in cooking area as no cooking will be performed on site10 Newmarket Sq · 720 ft NW · PlumbingSep 22$1,500
-
Replacing (10) existing rooftop units, like for like14 Allstate Rd · 810 ft E · PlumbingSep 4$82,001
-
Alteration or repair permit, no description from the city × 2 permits1006-1022 Massachusetts Av · 910 ft W · Alteration or repairSep 2$10,000
-
To wire 2, 3phase ovens, 2, Single ovens 25 outlets1006-1022 Massachusetts Av · 910 ft W · ElectricalSep 1$2,500
-
Change occupancy from Offices, light manufacturing1006-1022 Massachusetts Av · 910 ft W · Alteration or repairAug 24$100,000
-
Provide power to one (1) new replacement condenser and one (1) new replacement AHU1006-1022 Massachusetts Av · 910 ft W · ElectricalJul 1$5,600
-
Disconnect, relocate, reconnect gondolas and powerpoles7 Allstate Rd · 410 ft NE · ElectricalJun 15$4,000
-
Install 9x Receptacles for Price Checkers MAC Station inside of Target Store7 Allstate Rd · 410 ft NE · ElectricalJun 3$4,750
-
TJ Maxx - Remove and install 4 new Lav sinks8 Allstate Rd · 880 ft SE · PlumbingMay 15$12,000
-
Install of (3) Level 2 EV Chargers1006-1022 Massachusetts Av · 910 ft W · ElectricalMay 13$29,854
-
Relocate the existing receptacles to the new cashwrap cabinets8b Allstate Rd · 850 ft SE · ElectricalMay 12$22,000
Within a quarter mile1,000 ft to ¼ mi · 5 permits
-
Install one set of customer supplied channel letters20-36 District Av · 0.22 mi S · SignAug 7$4,050
-
Relocated gym to second floor75 Willow Ct · 0.25 mi S · OtherJul 22not listed
-
No construction will be done.Occupant Load existing 142 to increase 184;PLA1033 Massachusetts Av · 0.21 mi SW · Alteration or repairJul 21not listed
-
Sold by Tim: *tap into gas line located in utility room run adequately sized gas line from inside that…63r Boston St · 0.22 mi SE · PlumbingJun 17$7,000
-
Replace and separate power wires from controls on 2 outdoor condensers115-141 Newmarket Sq · 0.22 mi NW · ElectricalMay 15$5,000
More on this streetAllstate Rd · 6 other addresses with permits
- 7 Allstate Rd newest permit Jun 15, 2026
- 8 Allstate Rd newest permit Oct 5, 2026
- 14 Allstate Rd newest permit Oct 5, 2026
- 16 Allstate Rd newest permit Jul 8, 2025
- 100 Allstate Rd newest permit Apr 30, 2026
- 103 Allstate Rd newest permit Oct 3, 2024
Boston Inspectional Services Department updated its data Oct 6, 2026. We checked it Oct 6, 22:04 UTC. See the city's official records.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near