- At this address
- 200 permits on record. Newest issued Oct 7: Provide power and control wiring for twelve electric operators for…
- Within ¼ mile
- No other permits issued since May 1.
Within
Since
Here200 permits · 500 Terminal Rd
-
Oct 7$10,000
-
Low voltage for new DunkinElectricalOct 6$9,000
-
Power, lighting, for new DunkinElectricalOct 6$45,000
-
Bos atct nexgenElectricalSep 18$150,000
-
Aug 25$10,000
-
Aug 25$150,000
-
Aug 25$7,000
-
Aug 25$420,000
-
Jul 20$199,000
-
Jul 20$1,000
-
Jul 2$2,400
-
L1697-C4C Terminal B Roadway and GarageElectricalJun 25$62,690
-
Changing out light fixtures in officeElectricalJun 16$3,000
-
Pile grounding, duct bank conduit entry to manhole and misc change order scopefor site enablingElectricalJun 15$25,000
-
Jun 9$17,055
-
Massport, Wood Island Trailers 15 & 17ElectricalApr 29$14,080
-
Apr 29$95,000
-
Logan Airport, Terminal E OPI 9ElectricalApr 10$50,000
-
Logan Airport, Terminal E OPI 3.3ElectricalApr 10$2,500
-
Logan Airport, Terminal E OPI 7ElectricalApr 10$20,000
-
Logan Airport, Terminal E OPI 3.2ElectricalApr 10$15,000
-
Logan Airport, Terminal E OPI 3.1ElectricalApr 10$100,000
-
Apr 10$10,000
-
Apr 10$65,000
-
Apr 9$7,545
-
Apr 2$14,910
-
Feb 19$9,510
-
E25113 MPA Boiler replacementElectricalFeb 12$299,000
-
Dec 23, 2025$22,000
-
Dec 23, 2025$23,000
-
Installation of Power, lightingElectricalDec 23, 2025$260,000
-
Dec 1, 2025$58,520
-
Install power for conveyor systems lighting in bag rooms outdoor baggage heating unitsAlteration or repairNov 19, 2025$310,000
-
Renovations in cbp areas and elevator power installationAlteration or repairNov 19, 2025$1,252,000
-
Nov 13, 2025$30,000
-
Install fire alarm in four bathroomsFire systemsNov 13, 2025$30,000
-
Nov 13, 2025$40,000
-
Install fire alarm devices in renovated office spaces and at elevators /machine rooms install fire alarm in…Fire systemsNov 13, 2025$55,000
-
Renovate lighting and receptacles in four bathroomsAlteration or repairNov 13, 2025$387,000
-
Nov 13, 2025$470,000
-
Nov 10, 2025$10,000
-
Sep 30, 2025$8,695
-
Sep 26, 2025$50,000
-
Sep 26, 2025$75,000
-
Power and lighting for install of 3 moving walkways @ Terminal E - 2nd floor - INS CorridorElectricalSep 26, 2025$160,000
-
Low voltage wiring for a Chick-Fil-A restaurant @ Terminal E - Space E3-A31 between gates 13 & 14ElectricalSep 4, 2025$17,000
-
Fire Alarm for a Chick-Fil-A restaurant @ Terminal E - Space E3-A31 between gates 13 & 14Fire systemsSep 4, 2025$25,000
-
Power, lighting, for a Chick-Fil-A restaurant @ Terminal E - Space E3-A31 between gates 13 & 14ElectricalSep 4, 2025$275,000
-
Jul 14, 2025$50,870
-
Jul 10, 2025$2,500
-
E25006 MPA SmartCarte reconnectionsElectricalJun 26, 2025$10,000
-
Jun 26, 2025$5,000
-
Jun 18, 2025$17,965
-
Electrical make-safe for restaurant decommisioning @ Terminal E - Pre-security Departures levelElectricalJun 10, 2025$2,000
-
Terminal E Jet Bridges E3 through E9ElectricalJun 2, 2025$10,000
-
May 29, 2025$15,000
-
Terminal E- Level 3 SAL's PizzaElectricalMay 27, 2025$4,000
-
Mar 11, 2025$200,000
-
Massport L-1686 ATCT ImprovementsElectricalMar 10, 2025$210,030
-
Feb 13, 2025$333,290
-
Feb 6, 2025$2,000
-
Feb 6, 2025$310,000
-
Jan 31, 2025$5,000
-
Jan 31, 2025$20,000
-
Jan 7, 2025$1,900,000
-
Nov 25, 2024$5,570
-
Nov 25, 2024$7,590
-
Disconnect existing 60a/208v oven and reconnect new 60a/208v oven at Stephanies in terminal EElectricalOct 29, 2024$750
-
Oct 24, 2024$2,500
-
Oct 21, 2024$1,200
-
Disconnect/reconnect Fire Alarm modules at vestibule doors as they are replaced @ Terminal E - Levels 1Fire systemsSep 26, 2024$25,000
-
Disconnect/reconnect power to vestibule doors as they are replaced @ Terminal E - Levels 1ElectricalSep 26, 2024$25,000
-
Aug 21, 2024$750
-
Terminal E Food CourtElectricalAug 7, 2024$2,500
-
Jul 24, 2024$14,500
-
Jul 19, 2024$45,000
-
Jun 27, 2024$15,000
-
Jun 27, 2024$5,000
-
Jun 27, 2024$55,000
-
Jun 25, 2024$35,000
-
Jun 13, 2024$9,800
-
May 20, 2024$11,400
-
Low voltage - install date wiringElectricalMay 15, 2024$500
-
May 15, 2024$4,500
-
Apr 23, 2024$250,000
-
E19132 MPA Terminal E third elevatorElectricalApr 23, 2024$5,000
-
Apr 23, 2024$550,000
-
Feb 16, 2024$8,500
-
Jan 30, 2024$57,000
-
Jan 30, 2024$24,000
-
Jan 23, 2024$100,000
-
Jan 23, 2024$700,000
-
Jan 8, 2024$120,000
-
Jan 8, 2024$20,000
-
Dec 29, 2023$6,570
-
Dec 29, 2023$15,970
-
Remove existing lighting and miscElectricalDec 20, 2023$1,700,000
-
E23121 Terminal E jet-bridge connectionsElectricalOct 30, 2023$12,500
-
Oct 16, 2023$9,325
-
Oct 10, 2023$2,197,000
-
Oct 4, 2023$839,000
-
Sep 28, 2023$5,300
-
Sep 28, 2023$8,700
-
Install 2 ground service equipment charging stations at exterior gate E11 @ Terminal E Logan AirportElectricalSep 28, 2023$91,000
-
Sep 18, 2023$480,000
-
Sep 14, 2023$1,152,000
-
Sep 12, 2023$5,000
-
Sep 12, 2023$12,500
-
Sep 12, 2023$16,000
-
Data wiring for new restaurant Boston Harbor Distillery @New Terminal E 3rd Floor space E3-A52ElectricalSep 12, 2023$10,000
-
Sep 12, 2023$10,000
-
Sep 5, 2023$4,000,000
-
Sep 1, 2023$274,000
-
Aug 31, 2023$8,100
-
Aug 11, 2023$10,000
-
Tenant fit out for Legal Sea Foods restaurantFire systemsAug 11, 2023$15,000
-
Aug 11, 2023$45,000
-
E22110 Terminal E Food Court FA renovationsFire systemsAug 10, 2023$3,500
-
Aug 3, 2023$3,000
-
Install data cabling and jacks for concession stand @ New Terminal E 3rd Floor space E3-A51ElectricalAug 2, 2023$2,500
-
Aug 2, 2023$5,000
-
Aug 2, 2023$20,000
-
Low voltage wiring for sensory/calming room 3-1017 @ Terminal E Expansion - 3rd Floor - Room 3-1017ElectricalJul 28, 2023$2,000
-
Terminal E (Expansion) Space E3-A54Fire systemsJul 28, 2023$2,500
-
Fire Alarm wiring for sensory/calming room 3-1017 @ Terminal E Expansion - 3rd Floor - Room 3-1017Fire systemsJul 28, 2023$5,000
-
Power and Lighting for sensory/calming room 3-1017 @ Terminal E Expansion - 3rd Floor - Room 3-1017ElectricalJul 28, 2023$5,000
-
Jul 14, 2023$2,500
-
Jun 22, 2023$1,200
-
Jun 22, 2023$260,000
-
Jun 1, 2023$15,000
-
May 25, 2023$6,180
-
Logan Airport Terminal A Pre-CheckElectricalMay 25, 2023$4,760
-
I-Store, Terminal E Space E3-A36ElectricalMay 24, 2023$2,500
-
I-Store, Terminal E, Space E3-A36Fire systemsMay 24, 2023$5,400
-
I-Store, Space E3-A36ElectricalMay 24, 2023$75,000
-
May 11, 2023$25,000
-
May 11, 2023$40,000
-
May 11, 2023$400,000
-
May 11, 2023$25,000
-
May 11, 2023$250,000
-
May 11, 2023$200,000
-
Power and Lighting for restaurant/bar Peet's Coffee @ New Terminal E 3rd Floor space E3-A51ElectricalMay 11, 2023$240,000
-
May 11, 2023$850,000
-
May 11, 2023$200,000
-
May 4, 2023$100,000
-
Apr 20, 2023$187,000
-
Logan Airport C to B Hudson DunkinElectricalApr 4, 2023$6,000
-
Tenant Space for Retail Terminal E Space E3-A26Fire systemsMar 27, 2023$2,500
-
Tenant Fitout of Retail Space E3-A26ElectricalMar 23, 2023$2,500
-
Mar 23, 2023$22,500
-
L19512 Low Voltage work for Safe Gate system on Gate E8 at Logan airport it's a repair jobElectricalMar 23, 2023$5,000
-
Mar 23, 2023$2,500
-
Mar 23, 2023$5,000
-
Terminal E, Space E3-A54ElectricalMar 16, 2023$545,000
-
Terminal E (Expansion) Space E3-A28ElectricalMar 16, 2023$176,000
-
Mar 16, 2023$22,000
-
Mar 15, 2023$30,000
-
Mar 2, 2023$10,000
-
Fire Alarm updates for restaurant @ Terminal E Wahlburgers 2nd floor secure side - gate E8 areaFire systemsMar 2, 2023$8,000
-
Power and lighting for new restaurant @ Terminal E Wahlburgers 2nd floor secure side - gate E8 areaElectricalMar 2, 2023$100,000
-
Feb 7, 2023$46,000
-
Jan 20, 2023$5,000
-
Jan 11, 2023$5,000
-
AV wiring for speakers and AV SystemElectricalJan 10, 2023$20,000
-
LA Delta Sky Club Kitchen OutletsElectricalSep 27, 2022$22,000
-
LA Delta Battery Charger Panel ReworkElectricalSep 27, 2022$7,000
-
FA for new Delta Club @ Terminal E Logan AirportFire systemsAug 17, 2022$150,000
-
Aug 17, 2022$1,600,000
-
Jul 27, 2022$38,400
-
Jun 16, 2022$15,000
-
May 26, 2022$37,000
-
May 16, 2022$6,500
-
Power and lighting for new Dunkin Store @ Terminal E Logan Airport - Arrivals level public sideElectricalMay 16, 2022$50,000
-
Dec 21, 2021$8,871
-
Provide DP5-CPB Camera replacementsElectricalOct 12, 2021$446,000
-
Provide FA devices to an existing FA SystemFire systemsOct 12, 2021$5,000
-
Oct 12, 2021$137,000
-
Aug 27, 2021$7,000
-
Aug 27, 2021$25,000
-
Aug 27, 2021$20,000
-
Jul 26, 2021$190,000
-
Fire Alarm wiring for office renovation @ Terminal E Logan Airport / Luftansa - 3rd floorFire systemsJun 25, 2021$1,000
-
Power and lighting for office renovation @ Terminal E Logan Airport / Luftansa - 3rd floorElectricalJun 25, 2021$9,000
-
Apr 5, 2021$10,000
-
Mar 22, 2021$3,400
-
Mar 22, 2021$2,800
-
Feb 17, 2021$7,270,000
-
Jan 29, 2021$827,000
-
Jan 28, 2021$3,000
-
Dec 15, 2020$1,825,000
-
MPA contract L1555-C4ElectricalDec 9, 2020$256,000
-
Nov 6 to 24, 2020$18,000
-
Provide power and lighting for Covid testing @ Terminal E Logan Airport - 1st Floor Public sideElectricalOct 3, 2020$30,000
Nothing else in this circle since May 1, 2026. Try a bigger circle or a longer time.
Zoning requests nearbyas of Oct 10
There are no zoning requests on file within ¼ mi. Boston's feed was last read Oct 10.
More on this streetTerminal Rd · 5 other addresses with permits
- 450 Terminal Rd newest permit Nov 26, 2024
- 550 Terminal Rd newest permit Apr 1, 2026
- 300 Terminal Rd newest permit Sep 30, 2026
- 200 Terminal Rd newest permit Oct 7, 2026
- 100 Terminal Rd newest permit Aug 24, 2026
Boston Inspectional Services Department updated its data Oct 9, 2026. We checked it Oct 10, 08:27 UTC. See the city's official records.
Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 10, 02:17 UTC.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning