Nearby Permits
Map of 183 permits within a quarter mile of 455 Main StMechanical (HVAC), 200 Technology Sq, Oct 2, 2026Electrical, 21 Ames St, Oct 1, 2026Electrical, 75 Broadway, Oct 1, 2026Fire systems, 200 Technology Sq, Sep 30, 2026Plumbing, 70 Vassar St, Sep 30, 2026Plumbing, 21 Ames St, Sep 30, 2026Mechanical (HVAC), 120 Broadway, Sep 29, 2026Electrical, 360 Binney St, Sep 29, 2026Electrical, 200 Technology Sq, Sep 28, 2026Plumbing, 200 Technology Sq, Sep 25, 2026Mechanical (HVAC), 50 Broadway, Sep 25, 2026Fire systems, 400 Technology Sq, Sep 24, 2026Fire systems, 400 Technology Sq, Sep 24, 2026Mechanical (HVAC), 200 Technology Sq, Sep 24, 2026Mechanical (HVAC), 200 Technology Sq, Sep 24, 2026Electrical, 200 Technology Sq, Sep 22, 2026Electrical, 255 Main St, Sep 21, 2026Electrical, 255 Main St, Sep 21, 2026Fire systems, 200 Technology Sq, Sep 17, 2026Electrical, 200 Technology Sq, Sep 17, 2026Addition, 21 Ames St, Sep 17, 2026Electrical, 200 Technology Sq, Sep 16, 2026Fire systems, 255 Main St, Sep 15, 2026Plumbing, 255 Main St, Sep 15, 2026Mechanical (HVAC), 200 Technology Sq, Sep 15, 2026Fire systems, 21 Ames St, Sep 14, 2026Fire systems, 255 Main St, Sep 14, 2026Mechanical (HVAC), 200 Technology Sq, Sep 14, 2026Plumbing, 200 Technology Sq, Sep 11, 2026Mechanical (HVAC), 21 Ames St, Sep 10, 2026Electrical, 200 Technology Sq, Sep 10, 2026Electrical, 31 Ames St, Sep 10, 2026Mechanical (HVAC), 400 Technology Sq, Sep 8, 2026Plumbing, 200 Technology Sq, Sep 3, 2026Mechanical (HVAC), 205 Galileo Galilei Way, Sep 3, 2026Addition, 800 Technology Sq, Sep 3, 2026Addition, 200 Technology Sq, Sep 3, 2026Addition, 255 Main St, Sep 3, 2026Mechanical (HVAC), 314 Main St, Sep 2, 2026Electrical, 360 Binney St, Sep 2, 2026Addition, 255 Main St, Sep 2, 2026Electrical, 314 Main St, Sep 1, 2026Electrical, 90 Broadway, Sep 1, 2026Electrical, 314 Main St, Sep 1, 2026Mechanical (HVAC), 200 Technology Sq, Aug 26, 2026Electrical, 50 Broadway, Aug 25, 2026Electrical, 555 Technology Sq, Aug 25, 2026Plumbing, 200 One Kendall Square Complex, Aug 21, 2026Electrical, 50 Broadway, Aug 21, 2026Electrical, 141 Broadway, Aug 19, 2026Fire systems, 15 Vassar St, Aug 18, 2026Addition, 200 One Kendall Square Complex, Aug 18, 2026Mechanical (HVAC), 50 Broadway, Aug 14, 2026Addition, 200 Technology Sq, Aug 14, 2026Addition, 200 Technology Sq, Aug 14, 2026Addition, 25 Carleton St, Aug 14, 2026Electrical, 400 Technology Sq, Aug 12, 2026Addition, 75 Broadway, Aug 11, 2026Mechanical (HVAC), 73-75 Ames St, Aug 10, 2026Electrical, 15 Vassar St, Aug 10, 2026Electrical, 182-R Memorial Dr, Aug 8, 2026Mechanical (HVAC), 73-75 Ames St, Aug 7, 2026Electrical, 73-75 Ames St, Aug 7, 2026Roofing, 125 Harvard St, Aug 6, 2026Addition, 60 Vassar St, Aug 6, 2026Addition, 70 Broadway, Aug 5, 2026Electrical, 325 Main St, Aug 3, 2026Alteration or repair, 200 Technology Sq, Aug 3, 2026Mechanical (HVAC), 325 Main St, Jul 30, 2026Mechanical (HVAC), 21 Ames St, Jul 29, 2026Electrical, 50 Broadway, Jul 29, 2026Plumbing, 75 Broadway, Jul 28, 2026Electrical, 400 Technology Sq, Jul 28, 2026Plumbing, 50 Broadway, Jul 27, 2026Electrical, 75 Ames St, Jul 24, 2026Electrical, 290 Binney St, Jul 22, 2026Electrical, 15 Vassar St, Jul 20, 2026Electrical, 31 Ames St, Jul 20, 2026Addition, 610 Main St, Jul 16, 2026Fire systems, 25 Ames St, Jul 15, 2026Mechanical (HVAC), 325 Main St, Jul 15, 2026Electrical, 25 Ames St, Jul 15, 2026Mechanical (HVAC), 45 Carleton St, Jul 14, 2026Electrical, 45 Carleton St, Jul 14, 2026Electrical, 355 Main St, Jul 9, 2026Mechanical (HVAC), 73-75 Ames St, Jul 7, 2026Electrical, 400 Technology Sq, Jul 7, 2026Electrical, 360 Binney St, Jul 6, 2026Electrical, 3 Ames St, Jul 6, 2026Electrical, 555 Technology Sq, Jul 6, 2026Electrical, 290 Binney St, Jul 6, 2026Electrical, 325 Main St, Jul 2, 2026Electrical, 300 Technology Sq, Jul 1, 2026Fire systems, 200 Technology Sq, Jun 30, 2026Mechanical (HVAC), 1 Hampshire St, Jun 30, 2026Plumbing, 1 Hampshire St, Jun 30, 2026Electrical, 51 Vassar St, Jun 30, 2026Electrical, 45 Carleton St, Jun 30, 2026Electrical, 45 Carleton St, Jun 30, 2026Electrical, 400 Technology Sq, Jun 30, 2026Fire systems, 50 Broadway, Jun 24, 2026Mechanical (HVAC), 75 Broadway, Jun 24, 2026Mechanical (HVAC), 290 Binney St, Jun 24, 2026Plumbing, 290 Binney St, Jun 23, 2026Electrical, 325 Main St, Jun 23, 2026Electrical, 73-75 Ames St, Jun 23, 2026Electrical, 70 Amherst St, Jun 23, 2026Addition, 73-75 Ames St, Jun 23, 2026Addition, 200 Technology Sq, Jun 23, 2026Fire systems, 75 Ames St, Jun 22, 2026Mechanical (HVAC), 21 Ames St, Jun 22, 2026Fire systems, 21 Ames St, Jun 18, 2026Mechanical (HVAC), 45 Carleton St, Jun 18, 2026Roofing, 115 Harvard St, Jun 18, 2026Mechanical (HVAC), 75 Broadway, Jun 18, 2026Electrical, 50 Broadway, Jun 18, 2026Electrical, 300 Technology Sq, Jun 18, 2026Electrical, 290 Binney St, Jun 18, 2026Electrical, 73-75 Ames St, Jun 18, 2026Electrical, 400 Technology Sq, Jun 18, 2026Electrical, 200 Technology Sq, Jun 17, 2026Electrical, 400 Technology Sq, Jun 17, 2026Electrical, 200 Technology Sq, Jun 16, 2026Addition, 290 Binney St, Jun 16, 2026Addition, 75 Ames St, Jun 16, 2026Mechanical (HVAC), 325 Main St, Jun 15, 2026Electrical, 200 Technology Sq, Jun 13, 2026Addition, 75 Ames St, Jun 12, 2026Electrical, 200 Technology Sq, Jun 10, 2026Electrical, 200 Technology Sq, Jun 10, 2026Electrical, 73-75 Ames St, Jun 9, 2026Electrical, 360 Binney St, Jun 9, 2026Mechanical (HVAC), 50 Broadway, Jun 8, 2026Plumbing, 88 Ames St, Jun 8, 2026Plumbing, 60 Vassar St, Jun 5, 2026Plumbing, 60 Vassar St, Jun 5, 2026Electrical, 75 Ames St, Jun 3, 2026Electrical, 400 Technology Sq, Jun 3, 2026Electrical, 88 Ames St, Jun 3, 2026Electrical, 75 Broadway, Jun 3, 2026Electrical, 60 Vassar St, Jun 2, 2026Electrical, 555 Technology Sq, Jun 2, 2026Electrical, 314 Main St, Jun 1, 2026Electrical, 325 Main St, Jun 1, 2026Mechanical (HVAC), 15 Vassar St, May 29, 2026Electrical, 150 Broadway, May 29, 2026Electrical, 200 Technology Sq, May 29, 2026Electrical, 1 Hampshire St, May 27, 2026Electrical, 73-75 Ames St, May 27, 2026Electrical, 21 Ames St, May 27, 2026Electrical, 90 Broadway, May 27, 2026Plumbing, 325 Main St, May 22, 2026Fire systems, 400 Technology Sq, May 21, 2026Electrical, 400 Technology Sq, May 21, 2026Electrical, 325 Main St, May 21, 2026Electrical, 245 Main St, May 21, 2026Fire systems, 325 Main St, May 20, 2026Electrical, 415 Main St, May 19, 2026Electrical, 92 Ames St, May 19, 2026Fire systems, 200 Technology Sq, May 18, 2026Fire systems, 200 Technology Sq, May 18, 2026Electrical, 21 Ames St, May 18, 2026Electrical, 355 Main St, May 18, 2026Electrical, 245 Main St, May 14, 2026Fire systems, 200 Technology Sq, May 13, 2026Electrical, 400 Technology Sq, May 13, 2026Electrical, 400 Technology Sq, May 13, 2026Electrical, 400 Technology Sq, May 13, 2026Electrical, 21 Ames St, May 13, 2026Electrical, 121 Broadway, May 13, 2026Electrical, 3 Ames St, May 12, 2026Addition, 45 Carleton St, May 12, 2026Addition, 21 Ames St, May 11, 2026Mechanical (HVAC), 355 Main St, May 8, 2026Electrical, 200 Technology Sq, May 8, 2026Electrical, 360 Binney St, May 7, 2026Electrical, 75 Broadway, May 6, 2026Electrical, 400 Technology Sq, May 6, 2026Electrical, 121 Broadway, May 6, 2026Electrical, 100 Technology Sq, May 5, 2026Electrical, 73-75 Ames St, May 5, 2026Electrical, 400 Technology Sq, May 5, 2026Electrical, 200 Technology Sq, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade

455 Main St

Cambridge, MA 02142

186 permits on record here. The newest, Aug 26: Electrical permit, no description from the city. Within a quarter mile, the city has issued 183 more permits (105 projects) since May 1.

MayJunJulAugSepOct
Here186 permits · 455 Main St
  1. Jul 13 to Aug 26not listed
  2. Aug 4 to 7not listed
  3. Jul 8 to 30not listed
  4. Jun 25 to Jul 16not listed
  5. Jun 30not listed
  6. Apr 22not listed
  7. Apr 6not listed
  8. Mar 30not listed
  9. Feb 9not listed
  10. Jan 16not listed
  11. Jan 13not listed
  12. Dec 17 to 18, 2025not listed
  13. Oct 20, 2025 to Dec 8, 2025not listed
  14. Nov 6, 2025not listed
  15. Jul 16, 2025 to Sep 2, 2025not listed
  16. Jun 11, 2025 to Aug 5, 2025not listed
  17. Jul 3 to 30, 2025not listed
  18. Jun 17, 2025 to Jul 2, 2025not listed
  19. Jun 18, 2025not listed
  20. Jan 31, 2025 to Mar 11, 2025not listed
  21. Jan 15, 2025 to Mar 7, 2025not listed
  22. Dec 19, 2024not listed
  23. Dec 18, 2024not listed
  24. Dec 9, 2024not listed
  25. Dec 5, 2024not listed
  26. Sep 30, 2024 to Nov 5, 2024not listed
  27. Feb 21, 2024not listed
  28. Oct 19, 2023not listed
  29. Oct 5 to 19, 2023not listed
  30. Oct 2, 2023not listed
  31. Aug 3, 2023 to Sep 26, 2023not listed
  32. Sep 5, 2023not listed
  33. Apr 14, 2023not listed
  34. Feb 9, 2023not listed
  35. Feb 6, 2023not listed
  36. Dec 1, 2022not listed
  37. Nov 22, 2022not listed
  38. Aug 24, 2022not listed
  39. Jun 28, 2022 to Aug 10, 2022not listed
  40. Jul 26, 2022 to Aug 2, 2022not listed
  41. Jul 28, 2022not listed
  42. Jul 12 to 25, 2022not listed
  43. Jun 3, 2022not listed
  44. May 4, 2022not listed
  45. Mar 15, 2022not listed
  46. Sep 16, 2021 to Oct 27, 2021not listed
  47. Sep 23, 2021 to Oct 1, 2021not listed
  48. Sep 13 to 30, 2021not listed
  49. Aug 24, 2021 to Sep 27, 2021not listed
  50. Aug 31, 2021not listed
  51. Aug 5, 2021not listed
  52. May 27, 2021not listed
  53. May 4 to 20, 2021not listed
  54. May 11 to 12, 2021not listed
  55. May 11, 2021not listed
  56. Mar 18, 2021not listed
  57. Oct 15, 2020 to Dec 9, 2020not listed
  58. Oct 7, 2020not listed
  59. Oct 6, 2020not listed
  60. Jun 29, 2020 to Jul 28, 2020not listed
  61. Jul 24, 2020not listed
  62. Jun 30, 2020 to Jul 10, 2020not listed
  63. Jul 8, 2020not listed
  64. Jun 29, 2020 to Jul 1, 2020not listed
  65. Feb 11, 2020 to Mar 11, 2020not listed
  66. Nov 12, 2019 to Jan 7, 2020not listed
  67. Dec 18, 2019not listed
  68. Nov 6, 2019 to Dec 10, 2019not listed
  69. Dec 10, 2019not listed
  70. Dec 5, 2019not listed
  71. Aug 30, 2019 to Oct 28, 2019not listed
  72. Oct 4 to 8, 2019not listed
  73. Sep 26, 2019not listed
  74. Sep 24, 2019not listed
  75. Sep 9, 2019not listed
  76. Jul 22, 2019 to Aug 28, 2019not listed
  77. May 13, 2019 to Jul 11, 2019not listed
  78. May 24, 2019 to Jun 10, 2019not listed
  79. Apr 10, 2019 to May 6, 2019not listed
  80. May 2, 2019not listed
  81. May 1, 2019not listed
  82. Mar 28, 2019not listed
  83. Feb 11 to 28, 2019not listed
  84. Feb 27, 2019not listed
  85. Feb 4 to 26, 2019not listed
  86. Jan 30, 2019not listed
  87. Jan 11, 2019not listed
  88. Dec 19, 2018not listed
  89. Jul 23, 2018not listed
Next doorunder 250 ft · 1 permit
  1. May 19not listed
This block250 to 1,000 ft · 119 permits in 61 projects
  1. Aug 26 to Oct 2not listed
  2. Oct 1not listed
  3. Sep 17 to 30not listed
  4. Sep 29not listed
  5. Sep 10 to 28not listed
  6. Sep 3 to 25not listed
  7. Sep 24not listed
  8. Electrical permit, no description from the city × 2 permits
    31 Ames St · 610 ft SE · Electrical
    Jul 20 to Sep 10not listed
  9. Sep 8not listed
  10. Sep 3not listed
  11. Aug 14 to Sep 3not listed
  12. Sep 2not listed
  13. Electrical permit, no description from the city × 2 permits
    314 Main St · 840 ft E · Electrical
    Sep 1not listed
  14. Sep 1not listed
  15. Jul 6 to Aug 25not listed
  16. Aug 19not listed
  17. Aug 18not listed
  18. Jun 17 to Aug 12not listed
  19. Aug 11not listed
  20. Mechanical (HVAC) permit, no description from the city × 3 permits
    73-75 Ames St · 410 ft E · Mechanical (HVAC)
    Jul 7 to Aug 10not listed
  21. Electrical permit, no description from the city × 2 permits
    15 Vassar St · 280 ft SW · Electrical
    Jul 20 to Aug 10not listed
  22. Jun 9 to Aug 7not listed
  23. Aug 5not listed
  24. Electrical permit, no description from the city × 3 permits
    325 Main St · 740 ft E · Electrical
    Jun 23 to Aug 3not listed
  25. Aug 3not listed
  26. Mechanical (HVAC) permit, no description from the city × 3 permits
    325 Main St · 740 ft E · Mechanical (HVAC)
    Jun 15 to Jul 30not listed
  27. Jul 28not listed
  28. Electrical permit, no description from the city × 2 permits
    75 Ames St · 460 ft E · Electrical
    Jun 3 to Jul 24not listed
  29. Jul 15not listed
  30. Jul 15not listed
  31. Electrical permit, no description from the city × 2 permits
    355 Main St · 700 ft E · Electrical
    May 18 to Jul 9not listed
  32. Jun 18 to Jul 1not listed
  33. May 13 to Jun 30not listed
  34. Jun 30not listed
  35. Jun 30not listed
  36. Jun 30not listed
  37. Mechanical (HVAC) permit, no description from the city × 2 permits
    75 Broadway · 850 ft NE · Mechanical (HVAC)
    Jun 18 to 24not listed
  38. Jun 23not listed
  39. Jun 23not listed
  40. Jun 22not listed
  41. May 1 to Jun 17not listed
  42. Addition permit, no description from the city × 2 permits
    75 Ames St · 460 ft E · Addition
    Jun 12 to 16not listed
  43. Jun 8not listed
  44. May 5 to Jun 3not listed
  45. Jun 3not listed
  46. Electrical permit, no description from the city × 2 permits
    75 Broadway · 850 ft NE · Electrical
    May 6 to Jun 3not listed
  47. Jun 2not listed
  48. Jun 1not listed
  49. Electrical permit, no description from the city × 2 permits
    325 Main St · 740 ft E · Electrical
    May 21 to Jun 1not listed
  50. May 29not listed
  51. May 29not listed
  52. May 27not listed
  53. May 5 to 27not listed
  54. May 27not listed
  55. May 22not listed
  56. May 21not listed
  57. May 20not listed
  58. May 19not listed
  59. Electrical permit, no description from the city × 2 permits
    121 Broadway · 750 ft NE · Electrical
    May 6 to 13not listed
  60. May 8not listed
  61. May 5not listed
Within a quarter mile1,000 ft to ¼ mi · 63 permits in 43 projects
  1. Oct 1not listed
  2. Sep 30not listed
  3. Sep 30not listed
  4. Electrical permit, no description from the city × 2 permits
    360 Binney St · 0.24 mi N · Electrical
    Sep 2 to 29not listed
  5. Mechanical (HVAC) permit, no description from the city × 2 permits
    50 Broadway · 0.19 mi E · Mechanical (HVAC)
    Aug 14 to Sep 25not listed
  6. Electrical permit, no description from the city × 2 permits
    255 Main St · 0.23 mi E · Electrical
    Sep 21not listed
  7. Sep 17not listed
  8. Fire systems permit, no description from the city × 2 permits
    255 Main St · 0.23 mi E · Fire systems
    Sep 14 to 15not listed
  9. Sep 15not listed
  10. Sep 14not listed
  11. Mechanical (HVAC) permit, no description from the city × 2 permits
    21 Ames St · 0.23 mi S · Mechanical (HVAC)
    Jul 29 to Sep 10not listed
  12. Sep 3not listed
  13. Addition permit, no description from the city × 2 permits
    255 Main St · 0.23 mi E · Addition
    Sep 2 to 3not listed
  14. Electrical permit, no description from the city × 3 permits
    50 Broadway · 0.19 mi E · Electrical
    Jul 29 to Aug 25not listed
  15. Aug 21not listed
  16. Aug 18not listed
  17. Aug 14not listed
  18. Aug 8not listed
  19. Aug 6not listed
  20. Aug 6not listed
  21. Jul 27not listed
  22. Electrical permit, no description from the city × 3 permits
    290 Binney St · 0.24 mi NE · Electrical
    Jun 18 to Jul 22not listed
  23. Jul 16not listed
  24. Mechanical (HVAC) permit, no description from the city × 2 permits
    45 Carleton St · 0.20 mi SE · Mechanical (HVAC)
    Jun 18 to Jul 14not listed
  25. Electrical permit, no description from the city × 3 permits
    45 Carleton St · 0.20 mi SE · Electrical
    Jun 30 to Jul 14not listed
  26. Electrical permit, no description from the city × 3 permits
    360 Binney St · 0.24 mi N · Electrical
    May 7 to Jul 6not listed
  27. Electrical permit, no description from the city × 2 permits
    3 Ames St · 0.20 mi S · Electrical
    May 12 to Jul 6not listed
  28. Jun 24not listed
  29. Jun 24not listed
  30. Jun 23not listed
  31. Jun 23not listed
  32. Jun 22not listed
  33. Jun 18not listed
  34. Jun 18not listed
  35. Jun 18not listed
  36. Jun 16not listed
  37. Jun 8not listed
  38. Plumbing permit, no description from the city × 2 permits
    60 Vassar St · 0.22 mi SW · Plumbing
    Jun 5not listed
  39. Jun 2not listed
  40. Electrical permit, no description from the city × 3 permits
    21 Ames St · 0.23 mi S · Electrical
    May 13 to 27not listed
  41. Electrical permit, no description from the city × 2 permits
    245 Main St · 0.25 mi E · Electrical
    May 14 to 21not listed
  42. May 12not listed
  43. May 11not listed
More on this streetMain St · 10 nearest addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Cambridge Inspectional Services Department updated its data Oct 6, 2026. We checked it Oct 6, 21:28 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near