11202 E Germann Rd 15, Mesa has 31 building permits on record. The most recent, opened Apr 20, 2026, is for other: Afp26-05372 the scope of work includes the installation of a relocated storage magazine. The storage magazine will be placed on a new concrete pad. Storage magazine not to exceed 1…
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Other | Afp26-05372 the scope of work includes the installation of a relocated storage magazine. The storage magazine will be placed on a new concrete pad. Storage magazine not to exceed… | – | |
| Electrical | Demo existing exterior hvac chillers, partial concrete slab, and pair of doors. Install new concrete slabs, double doors, and baler. Electrical and structural work. Special… | – | |
| Fire systems | Install new exterior HVAC unit with new concrete equipment pad. HVAC unit will serve the existing building 'K' bay. Mechanical and electrical work. Special inspection concrete and… | – | |
| Fire systems | EXPEDITE - Change of occupancy for building area "K" from S-1 to H-3. Install assembly line for constructing inflators. Fire sprinkler plans provided. Deferred fire alarms… | – | |
| Elevator | The project scope involves the installation of electrical for new sewer lift station. The new equipment will have new electrical distribution but connecting into existing… | – | |
| Other | The project scope involves: code study submittal for building 15 area "k" for the installtion of pre-assembly line #324 and inflator final assembly line #325. Case study completed… | – | |
| Demolition | Modification to Area J minor interior demolition add compressor and support equipment. At area K: relocation of compactor access ramp and platform on south side, infill interior… | – | |
| Fire systems | Install new piping and sprinkler heads in the new TRW building 15 I-bay. | – | |
| Alteration or repair | The project scope includes: for building 15 area 'g', work includes the demolition of the existing office walls and existing office furniture. The demolition of the existing ct… | – | |
| Electrical | The project scope involved the installation of 2 gas tank vessels and associated equipment: existing area 'p' gas pad install vertical argon tank and vaporizers on existing… | – | |
| Alteration or repair | The project scope includes the removal of existing equipment and the installation of a new tube wash system. Existing mechanical, plumbing, & electrical services will be modified… | – | |
| Alteration or repair | The project scope includes the installation of the new igniter sub-assembly line l312 and l314 in b15/n. Existing mechanical, plumbing, & electrical services will be modified to… | – | |
| Electrical | The project scope includes: the installation of 4 total dust collectors. 2 Dust collectors in b/15 area 'm' and 2 dust collectors in b/15 area 'n' with electrical power… | – | |
| Mechanical (HVAC) | The project scope includes the modification of an existing concrete equipment pad and the installation of a new HVAC unit with ductwork in existing building. | – | |
| Mechanical (HVAC) | Install dehumidifiers to Building 15 Areas C & M into existing rooms adjacent to each propellant load rooms. Provide in process staging of HD 1.4 articles in Dehumidifier… | – | |
| Electrical | The project scope includes the installation of the new igniter sub-assembly line #194 in b15/p2. 2 New staged pallets, removal of 1 fixed daybox and the relocation of 2 mobile… | – | |
| New building | Code study only / no new construction - the project scope includes the justification for use of hazardous materials in the production of airbag inflator assemblies on the "di-10"… | – | |
| Electrical | Afp19-08428 - the project scope includes the installation of the new shi-2 inflator inert gas fill assembly line 140 with associated support equipment. Existing mechanical… | – | |
| Electrical | Afp19-08428 the project scope includes the following: · remove & replace existing (2) laser generator and (2) chiller units w/ newer model laser generator / chiller package units… | – | |
| Other | Annual facilities permit for trw site on germann rd for 2019 | – | |
| Fire systems | Adding new fire alarm devices to existing system | – | |
| Demolition | The project scope is for the installation and energizing of inflator assembly equipment for testing purposes only. Existing "di-9" line hazardous material quantities will be… | – | |
| Alteration or repair | Install new 13k gallon argon tank with supporting equipment being placed on new 4-inch thick pressured to 4k-lbs concrete pad. No new covered areas. Remove existing horizontal… | – | |
| Electrical | Demo existing assembly for line #7, remove and replace existing obsolete laser generator and chiller units, reconfigure existing assembly equipment, install roi inflator… | – | |
| Fire systems | The project scope includes the installation of the new "SPI2-EVO" Inflator Assembly Line #311 & misc. support equipment including 3 interior vent chambers in B15/B1 to match the… | – | |
| Electrical | AFP #AFP18-01870 - The project scope includes the following: · Installation of a new exterior roll-up door in an existing framed opening. · Installation of a new "Hoffer"… | – | |
| Fire systems | The project scope of work in b15/area 'q2' includes the following: 1. The construction of a building addition onto the south end of exist. B15/Q1. 2. The installation of shi-2… | – | |
| Addition | Expedited review per donna canale the project scope of work includes civil and site modifications in advance of the "b15/area 'q2' building addition" construction (under future… | – | |
| Other | Code Study For HGI assembly line in area A of Building 15. | – | |
| Addition | PRJ769 - Code Study For HGI assembly line in area M of Building 15. Reference remodel permit bld2004-08424. Study is to allow the use an inflator assembly line utilizing hydrogen… | – | |
| Addition | Prj769 - revise assembly line for hgi, install hydrogen storage, supply and fill stations with gas monitoring system. Add 1,033 SQ. FT. To existing gas pad canopy to cover… | – |