4558 E Virginia St
Mesa, AZ 85215
200 permits on record here. The newest, May 29: Afp26-00653 the project scope includes the installation of a compactor w/ roll-off bin in the existing truck. Within a quarter mile, the city has issued 1 more permit since May 1.
Within
Since
Here200 permits · 4558 E Virginia St
-
May 29not listed
-
Afp26-00653 the project scope includes modifications to the existing 'd7' inflator assembly line…Alteration or repairMay 8not listed
-
Jan 7not listed
-
Dec 18, 2025not listed
-
The project scope includes the relocation of the existing "finished goods staging" area (previously permitted…Alteration or repairDec 16, 2025not listed
-
Dec 9, 2025not listed
-
Nov 14, 2025not listed
-
The project scope includes installation of (2) new steel guardrails to increase pedestrian safetyOtherMar 19, 2025not listed
-
Jan 23, 2025not listed
-
Dec 11, 2024not listed
-
Nov 7, 2024not listed
-
The project scope includes the following: 1Alteration or repairSep 6, 2024not listed
-
Jun 21, 2024 to Aug 20, 2024not listed
-
May 29, 2024not listed
-
May 21, 2024not listed
-
Apr 18, 2024not listed
-
Apr 16, 2024not listed
-
Jan 23, 2024not listed
-
Dec 19, 2023not listed
-
Aug 9, 2023not listed
-
The project scope includes the justification for use of hazardous materials on the 'd7' assembly line for the…Alteration or repairJul 14, 2023not listed
-
Jul 13, 2023not listed
-
Jun 5, 2023not listed
-
Jan 30, 2023not listed
-
The following modifications to the existing 'met' lab storage platform located in the phAlteration or repairNov 18, 2022not listed
-
· Relocate existing worktables (receiving stations) to the west exterior wallAlteration or repairNov 17, 2022not listed
-
Nov 15, 2022not listed
-
Oct 31, 2022not listed
-
Sep 16, 2022not listed
-
Jul 26, 2022not listed
-
Jul 18, 2022not listed
-
Jul 18, 2022not listed
-
Jun 28, 2022not listed
-
AFP22-00143 (Previously permitted under PMT21-12089 - permit expired so resubmitting for new permit) THE…Mechanical (HVAC)May 27, 2022not listed
-
The project scope consists of the following: · relocation / removal of existing equipment / furniture ·…Alteration or repairMar 23, 2022not listed
-
Afp22-00143 - the project scope includes the installation of +16'-0"h steel racking to match existing for the…Alteration or repairMar 11, 2022not listed
-
Feb 25, 2022not listed
-
The project scope includes the following: · demolition of hd 1.4 staging cabinet in the 'cmm' room…DemolitionDec 20, 2021not listed
-
Sep 30, 2021not listed
-
**Afp21-00205** the project scope includes rearranging the existing material racking located in magazine 2…Fence, wall or deckJun 15, 2021not listed
-
May 3, 2021not listed
-
Apr 8, 2021not listed
-
Feb 9, 2021not listed
-
Code study to use hazardous materials on D6 assembly line for the manufacturing of the ZE4/YN4 inflator in…Alteration or repairFeb 5, 2021not listed
-
Project scope includes the relocation of existing pallet racks and staging of hd 1.4s finished goods from…Alteration or repairJan 11, 2021not listed
-
Dec 21, 2020not listed
-
**Afp20-00081** the project scope includes the installation of the 'd6' inflator assembly line with…Fire systemsOct 28, 2020not listed
-
**Afp20-00081** the project scope includes the installation of a 3'-6" h. Steel pedestrian guardrail barrier…Fence, wall or deckOct 8, 2020not listed
-
***Afp20-00081*** the project scope includes rearranging the existing material racking located in magazines 2Fence, wall or deckSep 28, 2020not listed
-
***Afp20-00081*** the project scope includes the relocation and installation of the existFence, wall or deckSep 24, 2020not listed
-
***Afp20-00081*** the project scope includes the installation of a storefront door / wall system in the…Fence, wall or deckSep 23, 2020not listed
-
Sep 21, 2020not listed
-
***Afp20-00081**** the project scope involves the installation of new high-piled (inert) storage racking to…Fence, wall or deckSep 14, 2020not listed
-
Aug 25, 2020not listed
-
**Afp20-00081** the project scope includes the relocation of the existFence, wall or deckAug 24, 2020not listed
-
**Afp20-00081** the project scope involves the installation of (2) premanufactured mtlFence, wall or deckJul 20, 2020not listed
-
**Afp20-00081** the project scope involves the installation of suspended acoustical tile ceilings w/ fire…Fire systemsJul 13, 2020not listed
-
***Afp20-00081*** the project scope involves the relocation of the existFence, wall or deckJul 13, 2020not listed
-
**Afp20-00081** the project scope involves the installation of a hazardous materials staging cabinet in the…Fence, wall or deckJul 1, 2020not listed
-
**Afp20-00081** the project scope involves the relocation of the existFence, wall or deckJun 29, 2020not listed
-
**Afp20-00081** the project scope involves the construction of a new testing room w/ climate controlFire systemsJun 3, 2020not listed
-
**Afp20-00081** the project scope involves the installation of 2 new torit exhaust units w/ associated…Fire systemsMay 19, 2020not listed
-
Apr 22, 2020not listed
-
**Afp20-00081** the project scope is as follows: · installation of a temporary 3,000 galFence, wall or deckApr 21, 2020not listed
-
Justification for the use of hazardous materials on an air bag inflator assembly line in an existing H-3…Alteration or repairApr 20, 2020not listed
-
Apr 14, 2020not listed
-
Mar 23, 2020not listed
-
Mar 16, 2020not listed
-
**Afp20-00081** the project scope includes relocating the existFence, wall or deckMar 16, 2020not listed
-
The scope of the project is to install (2) pre-engineered kidde hpc02 fire suppression system in each…Fire systemsFeb 25, 2020not listed
-
Feb 19, 2020not listed
-
*Afp20-00081* the project scope includes the relocation of existing equipment and relocation of the existing…Fence, wall or deckFeb 19, 2020not listed
-
Feb 14, 2020not listed
-
Feb 7, 2020not listed
-
The project scope includes the demo of existing equipment from Phase IFence, wall or deckJan 28, 2020not listed
-
The project scope includes the partial demo of existing storage racking in Building 1Fence, wall or deckJan 28, 2020not listed
-
The project scope consists of the installation of (4) four pass-through fixtures on the Phase II Production…Fence, wall or deckDec 20, 2019not listed
-
Dec 18, 2019not listed
-
The project scope includes installing utilities to new O-Ring and Re-Label Machine in Phase II's Production…Fence, wall or deckDec 11, 2019not listed
-
Nov 14, 2019not listed
-
The project scope includes installing utilities to LE- A8 Subline in Phase I - Production and installing…Fence, wall or deckNov 11, 2019not listed
-
Oct 22, 2019not listed
-
The project scope includes installing a new Mohler Lift Table to Line A6 in Phase II- ProductionElevatorOct 3, 2019not listed
-
The project scope includes installing utilities to the LE - A8 Main Line equipment and support equipment in…Fence, wall or deckSep 5, 2019not listed
-
The project scope includes installing utilities to a new Fume HoodFence, wall or deckAug 22, 2019not listed
-
Aug 12, 2019not listed
-
Jul 18, 2019not listed
-
Jul 12, 2019not listed
-
AFP19-00646 The project scope includes the removal of existing production equipment in lines A1 and A3 from…Fence, wall or deckJul 10, 2019not listed
-
AFP19-00646 - The project scope includes the installation of powerFence, wall or deckJun 19, 2019not listed
-
May 30, 2019not listed
-
The project scope includes the installation of (2) two in-line exhaust fans and installing (120V-20A) power…Fence, wall or deckMay 15, 2019not listed
-
AFP19-00646 - The project scope includes the relocation of five (5) existing horn / strobesFence, wall or deckMay 14, 2019not listed
-
The project scope includes the installation of a new Orbitform Crimp Machine and associated support utilitiesAlteration or repairMay 10, 2019not listed
-
Project scope includes removing and replacing the existing storage racking system in the existing site…Fire systemsApr 29, 2019not listed
-
PKG. #3 - Interior improvements · mezzanine structureAlteration or repairApr 25, 2019not listed
-
Apr 24, 2019not listed
-
Site improvements and building shell including: fencing and screen walls: parking: sidewalks: planting and…Fire systemsApr 3, 2019not listed
-
Foundation and underground systems permitAlteration or repairMar 14, 2019not listed
-
Feb 26, 2019not listed
-
Feb 21, 2019not listed
-
Afp19-00646 - cooling air coil projectAlteration or repairJan 21, 2019not listed
-
Jan 16, 2019not listed
-
Jan 4, 2019not listed
-
Nov 20, 2018not listed
-
Nov 12, 2018not listed
-
Aug 17, 2018not listed
-
Aug 2, 2018not listed
-
AFP2018-01871 NB-A7 Installation of the Inflator Production Line with associated architecturalNew buildingJul 20, 2018not listed
-
Jun 12, 2018not listed
-
Install a 772 S.F. painted steel framed canopy with metal deck (per ADM18-00017) on the north face of the…Fire systemsMay 14, 2018not listed
-
AFP18-01871. The project scope includes the installation of a new temperature/humidity chamber within the…Alteration or repairApr 23, 2018not listed
-
Apr 19, 2018not listed
-
Apr 6, 2018not listed
-
Apr 6, 2018not listed
-
The project scope includes the installation of (2) new 480v circuits for the Ruwac Vacuum UnitsOtherApr 6, 2018not listed
-
Mar 5, 2018not listed
-
Mar 5, 2018not listed
-
Feb 21, 2018not listed
-
Feb 14, 2018not listed
-
AFP18-01871 - Add New XFMR & 208v PanelElectricalFeb 14, 2018not listed
-
Feb 9, 2018not listed
-
The project scope includes the construction of Test Bay #4 room and the extension and alteration of existing…Alteration or repairFeb 6, 2018not listed
-
Feb 2, 2018not listed
-
Jan 16, 2018not listed
-
Dec 4, 2017not listed
-
Nov 21, 2017not listed
-
Nov 16, 2017not listed
-
Nov 16, 2017not listed
-
Nov 16, 2017not listed
-
Nov 9, 2017not listed
-
The project consists of demo and construction of a non bearing partition,installation of a new service door…Alteration or repairSep 29, 2017not listed
-
The project scope of work cosisits of the existing furniture and equipmentAlteration or repairSep 29, 2017not listed
-
Sep 29, 2017not listed
-
Sep 14, 2017not listed
-
The project scope consists of the installation of 3 new monitors and associated electrical racewaysElectricalSep 14, 2017not listed
-
Sep 14, 2017not listed
-
Removal of normal power and wire of existing circuits ( within existing devices and raceways )Alteration or repairAug 31, 2017not listed
-
Aug 31, 2017not listed
-
Jul 6, 2017not listed
-
Jul 6, 2017not listed
-
Jun 26, 2017not listed
-
Jun 26, 2017not listed
-
Jun 21, 2017not listed
-
Fire sprinklers - deferredFire systemsJun 8, 2017not listed
-
Scope of work consists of modifications and upgrades to existing rooftop chiller unitAlteration or repairJun 7, 2017not listed
-
Jun 7, 2017not listed
-
Install 6 new lift tablesElevatorJun 7, 2017not listed
-
Jun 7, 2017not listed
-
Jun 7, 2017not listed
-
Code mod: code to permit the use/concept of mobile section of conveyor fitted with exit device for exiting…Alteration or repairJun 5, 2017not listed
-
May 12, 2017not listed
-
Code mod - ref: bld2017-02152AdditionApr 25, 2017not listed
-
Change of occupancy, return from h3 production use back to original h1 type iin explosives storage magazine…Alteration or repairApr 24, 2017not listed
-
Apr 19, 2017not listed
-
Apr 19, 2017not listed
-
Mar 23, 2017not listed
-
Code mod - ref: bld2017-01329Alteration or repairFeb 28, 2017not listed
-
Afp: relocate and install athe nb production lineAlteration or repairFeb 27, 2017not listed
-
Expedite - relocation of hazardous material from building 2 (magazine) to building 1 area d "nb" production…Alteration or repairFeb 21, 2017not listed
-
Deferred - ref bld2016-06404 - modify existing fire alarm system for the diacel/dssa AZ - manufacturing…Fire systemsFeb 7, 2017not listed
-
Add new exterior service door with afp permitAlteration or repairJan 23, 2017not listed
-
Ref: bld2016-04281 - ti to add 2 single user restrooms to 2nd levelAlteration or repairDec 20, 2016not listed
-
Dec 14, 2016not listed
-
Afp project scope includes the installation of 1 new floor sink and 1 new concrete padAlteration or repairNov 28, 2016not listed
-
Oct 13, 2016not listed
-
Oct 12, 2016not listed
-
Oct 3, 2016not listed
-
Deferred-reference permit #bld2016-04282Fire systemsSep 22, 2016not listed
-
Sep 21, 2016not listed
-
Aug 16, 2016not listed
-
Aug 11, 2016not listed
-
New electrical car charger at sdiElectricalJul 26, 2016not listed
-
Installation of 3 new new HVAC units and associated structual,mechanical and electrical workElectricalJul 7, 2016not listed
-
Pkg 5: interior support and core build out includes entry lobbyAlteration or repairJul 1, 2016not listed
-
Shell buildingAlteration or repairJul 1, 2016not listed
-
Grading and drainage, private onsite utilitiesAlteration or repairJun 22, 2016not listed
-
Phase II: foundations, slabs, and under slab utilitiesAlteration or repairJun 22, 2016not listed
-
Code mod - ref bld2016-04041 & bld2016-04043Alteration or repairJun 22, 2016not listed
-
Jun 1, 2016not listed
-
Installation of new electrical racewaysElectricalMay 5, 2016not listed
-
Code study - no work under this permitAlteration or repairApr 27, 2016not listed
-
Apr 27, 2016not listed
-
Apr 8, 2016not listed
-
Mar 25, 2016not listed
-
Mar 15, 2016not listed
-
Add electrical device and circuits forElectricalMar 8, 2016not listed
-
Mar 2, 2016not listed
-
Feb 18, 2016not listed
-
Deferred submittal - hmis fee on permit bld2015-01239 super expedite: justification for the use of hazardous…Alteration or repairDec 2, 2015not listed
-
Installation of high piled storage placing system in the existing warehouse areaAlteration or repairNov 16, 2015not listed
-
Addenda to original permit #bld2015-06700Alteration or repairNov 16, 2015not listed
-
Installation of mold machines and we/fe inflator lines and mechanical rooftop equipment the installation of…Alteration or repairNov 12, 2015not listed
-
Pbi #3 - installation of compressorAlteration or repairNov 5, 2015not listed
-
Oct 26, 2015not listed
-
Pbi--iinstallation of 5 new cocrete mechancial pads with floor sinks and associated plumbing next to the…Alteration or repairOct 20, 2015not listed
-
Code modification: alternative 1-hr partition assembly at concrete double tee connectionAlteration or repairOct 6, 2015not listed
-
Add stair, metal deck and concrete slab to existing steel structureAlteration or repairOct 1, 2015not listed
Sort
Within a quarter mile1,000 ft to ¼ mi · 1 permit
-
Parking Lot Expansion3309 N Reseda · 0.21 mi SE · OtherJul 13not listed
Mesa Development Services updated its data Oct 4, 2026. We checked it Oct 5, 12:05 UTC. Official data.