7232 E Elliot Rd
Building permits, Mesa, AZ 85212
7232 E Elliot Rd, Mesa has 30 building permits on record. The most recent, opened Sep 3, 2026, is for electrical: 13,000 Sf lunch tent with generator electric. JE Dunn is looking to install a 164’ X 82’ lunch tent. In the location show on the site map. The tent will be onsite for approximately…
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Electrical | 13,000 Sf lunch tent with generator electric. JE Dunn is looking to install a 164’ X 82’ lunch tent. In the location show on the site map. The tent will be onsite for… | – | |
| Fire systems | Provide and install a new NFW-50X addressable fire alarm system for the protection at the Mesa MSA 2a data center - break tent. | – | |
| Other | Ansul Suppression system install: Related to PMT24-21905 | – | |
| Addition | Civil improvements to existing site entrance at the MSA Data Center, to include driveway widening, additional parking expansion and install of (2) Pre-Engineered Metal Bldgs.: (32… | – | |
| Electrical | Exterior mechanical and electrical modifications to provide cooling for 47 existing generator/DEF enclosures, 8 ISP electrical cabinets, and 4 Perun transformer control panels… | – | |
| New building | New private utility substation. Scope of work includes the foundation, structural, and electrical. Work includes installation of a new prefabricated metal substation equipment… | – | |
| Other | Installation of an Emergency Responder Radio Communications System Reviewed as noted. Results in CoC. | – | |
| New building | New parking canopies totaling 11,140 SF at new building site. Special inspections required: welding and concrete construction. Results in CofC. | – | |
| Addition | Addition of catwalks and stair towers for generator access. Special inspection for anchoring. Results in CoC. | – | |
| Fire systems | Addition to existing fire alarm system to include new lunch tent. Extending existing SLC loop and Audio Loop from the FACP located in the LV MEB building. Addition of new booster… | – | |
| Fire systems | New ground up 285,282 SF unlimited area data hall building with type II-B construction. Group B occupancy classification. Project includes the installation of mechanical and… | – | |
| Electrical | Foundations: This scope includes the construction of a 284,497 SF Data Center Building and supporting equipment and ancillary building foundations in the mechanical and electrical… | – | |
| Electrical | Phase 1 building smart cooling. (2) areas of modification on-site. Adding (2) new water storage tanks, (2) pump enclosures Utility buildings 270 SF each and (2) water softener… | – | |
| Alteration or repair | Extension of existing temp utilities onsite to support auxiliary trailers. Ref temp trailers under PMT24-17085. | – | |
| Fire systems | Case Study to determine level of Fire Protection needed for ancillary support buildings on site. Approved with Stipulations: Exempt locations shall be protected with an approved… | – | |
| Other | EXPEDITE - Emergency Responder Radio Coverage System | – | |
| Fire systems | Development of Phase 2 - 10,470 SF, Group B occupancy, Type V-B construction office building. New work consists mostly of open office spaces, meeting rooms, a flexible meeting… | – | |
| Electrical | Install electrical substation to power Red Hawk Phase 2 Red building. Scope of work includes foundation, structural steel, electrical, and installation of prefabricated metal… | – | |
| Fence, wall or deck | Install 480 SF Pre-Engineered Pergola structure going in at the Outdoor Amenity Space. Adjacent buildings type VB construction, B and A-2 occupancy, REF: PMT24-11833, and… | – | |
| Fire systems | Install above ground buildings and structures associated with Phase 02. Foundations and underground utilities for Phase 02 have previously been permitted under PMT24-07723. Other… | – | |
| Sign | Installation of Signage on site entrance monuments GOOGLE 10 sq. ft. each 3in deep LED illuminated letters mechanically fastened to ACM sign box and GOOGLE on north elevation 26… | – | |
| Fire systems | The RedHawk HUB is a one-story, office support building serving the RedHawk Data Center campus located at the intersection of Sossaman and Elliot Road, located within the Red Hawk… | – | |
| Alteration or repair | Foundation and underground/slab utilities only for new Data Center. Special inspections required for steel, fabricators, concrete, soils, driven deep foundations. Aerial apparatus… | – | |
| Alteration or repair | Foundation and underground/slab utilities only for new Data Center. Special inspections required for steel, fabricators, concrete, soils, driven deep foundations. Aerial apparatus… | – | |
| Electrical | Scope of Work includes review for foundation inspections, structural steel package review, electrical package review and any special inspections for a privately owned substation… | – | |
| Electrical | Installation of an outdoor Electrical Substation (civil work only) | – | |
| Other | Haydon is submitting this application for an After-Hours Work Permit as it relates to Permit PMT23-13926. Requested information for this permit is as follows: 1. The applicant… | – | |
| Grading | AT RISK GRADING PERMIT- Modify Mass Grading for the 2nd planned building on site. Relocate temporary fire access lane. | – | |
| Fire systems | New ground up data center with electrical yard, mechanical yard, six pump houses and a pump house pharmacy, two electrical buildings with associated platform/decks, trestle… | – | |
| Other | Two meters at power poles for a future project's construction site. MSA 1A Medium Voltage temporary power distribution. Project Red Hawk | – |