Map of 218 permits within a quarter mile of 1 Mia Cc EAlteration or repair, 1 Mia Cc H Near Gate H5, Oct 6, 2026Alteration or repair, 1 Mia Sourt Term H20370, Oct 6, 2026Alteration or repair, 1 Mia Bldg 702 205, Oct 6, 2026Alteration or repair, 1 Miad Concourse H, Oct 6, 2026Alteration or repair, 1 Mia Walkway 2625 And 1081, Oct 5, 2026Fire systems, 1 Mia Cc F Sky Bridge, Oct 5, 2026Plumbing, 1 Mia 5200 NW 21 St, Oct 1, 2026Alteration or repair, 1 Mia Dolphin Garage Bldg 770, Oct 1, 2026Plumbing, 1 Mia Term F Door 13, Oct 1, 2026Plumbing, 1 Mia Cc J 3-4 Levels, Sep 30, 2026Electrical, 1 Mia Park 1 Ev Charger, Sep 30, 2026Alteration or repair, 1 Mia N Terminal Rotunda D-38, Sep 30, 2026Mechanical (HVAC), 1 Mia Gate D6 Elevator, Sep 24, 2026Mechanical (HVAC), 1 Mia Cc D Gate D-15, Sep 24, 2026Mechanical (HVAC), 1 Mia Gate D10-D12 Elevator, Sep 24, 2026Mechanical (HVAC), 1 Mia Cc D Chef Creole, Sep 23, 2026Electrical, 1 Mia Concourse G Gate G4, Sep 23, 2026Electrical, 1 Mia Concourse F Gate F7, Sep 23, 2026Electrical, 1 Mia Term E Bus Station Emr, Sep 23, 2026Electrical, 1 Mia South Terminal, Sep 22, 2026Electrical, 1 Mia Park 4, Sep 22, 2026Electrical, 1 Mia Cc F Sky Bridge, Sep 18, 2026Electrical, 1 Mia South Term Gse, Sep 18, 2026Electrical, 1 Mia South Term Gse, Sep 17, 2026Electrical, 1 Mia Bldg 7200, Sep 17, 2026Electrical, 1 Mia Bldg 7200, Sep 17, 2026Electrical, 1 Mia South Term Expansion, Sep 17, 2026Mechanical (HVAC), 1 Mia Cc J 3-4 Levels, Sep 16, 2026Electrical, 1 Mia Bldg 3151, Sep 16, 2026Alteration or repair, 1 Mia Cc F 2nd Level, Sep 16, 2026Electrical, 1 Mia 5300 NW 36 St, Sep 16, 2026Alteration or repair, 1 Mia South Terminal, Sep 16, 2026Electrical, 1 Mia Bldg 916, Sep 15, 2026Electrical, 1 Mia Bldg 916, Sep 14, 2026Plumbing, 1 Mia Pbb Gate D22, Sep 14, 2026Mechanical (HVAC), 1 Mia Pbb Gate D22, Sep 14, 2026Alteration or repair, 1 Mia Concourse F Gate F7, Sep 13, 2026Alteration or repair, 1 Mia Concourse G Gate G4, Sep 10, 2026Electrical, 1 Mia Cc D Gate D-15, Sep 10, 2026Electrical, 1 Miad Bldg 3150, Sep 9, 2026Electrical, 1 Mia Gate D10-D12 Elevator, Sep 9, 2026Electrical, 1 Mia Gate D10-D12 Elevator, Sep 9, 2026Electrical, 1 Mia Gate D14 Elevator, Sep 9, 2026Alteration or repair, 1 Mia Pbb Gate F3, Sep 8, 2026Alteration or repair, 1 Mia Pbb Gate D16, Sep 8, 2026Electrical, 1 Mia Pbb Gate D22, Sep 4, 2026Electrical, 1 Mia Wide Reroofing, Sep 3, 2026Electrical, 1 Mia Cc D Gate D-15, Sep 3, 2026Plumbing, 1 Mia Term E Bus Station Emr, Sep 2, 2026Mechanical (HVAC), 1 Mia Bldg 3030 Shop, Sep 2, 2026Electrical, 1 Mia Gate D14 Elevator, Sep 2, 2026Fire systems, 1 Mia South Term Expansion, Aug 31, 2026Mechanical (HVAC), 1 Mia Fiel Lighting Vault, Aug 31, 2026Electrical, 1 Mia South Term Expansion, Aug 28, 2026Plumbing, 1 Mia South Term Gse, Aug 27, 2026Mechanical (HVAC), 1 Mia South Term Gse, Aug 27, 2026Fire systems, 1 Mia Bldg 3030 Warehouse, Aug 27, 2026Electrical, 1 Mia Wide Reroofing, Aug 27, 2026Plumbing, 1 Mia Bldg 3030 Warehouse, Aug 26, 2026Mechanical (HVAC), 1 Mia Wide Reroofing, Aug 26, 2026Fire systems, 1 Mia Cc E 2nd Level, Aug 25, 2026Plumbing, 1 Mia South Term Gse, Aug 25, 2026Plumbing, 1 Mia South Term Expansion, Aug 25, 2026Plumbing, 1 Mia Cc E 2nd Level, Aug 25, 2026Plumbing, 1 Mia Cc E 2 Floor, Aug 25, 2026Mechanical (HVAC), 1miad Conc H 3rd Lv(Near H5), Aug 21, 2026Plumbing, 1 Mia Pbb Gate H14, Aug 20, 2026Alteration or repair, 1 Mia Bldg 3151, Aug 19, 2026Alteration or repair, 1 Mia Pbb Gate D21, Aug 18, 2026Mechanical (HVAC), 1 Mia Pbb Gate H14, Aug 17, 2026Electrical, 1 Mia Pbb Gate H14, Aug 14, 2026Mechanical (HVAC), 1 Mia Bldg 3030 Warehouse, Aug 14, 2026Alteration or repair, 1 Mia Cc J 3-4 Levels, Aug 13, 2026Electrical, 1 Mia Cc E 2nd Level, Aug 13, 2026Fence, wall or deck, 1 Mia 2301 NW 33 Ave, Aug 13, 2026Fire systems, 1 Mia Satellite E 2nd 4 Floor, Aug 13, 2026Electrical, 1 Mia Cc E 2 Floor, Aug 11, 2026Electrical, 1 Mia Term E 3 Floor E3420, Aug 11, 2026Mechanical (HVAC), 1 Mia Term E 3 Floor E3420, Aug 11, 2026Electrical, 685 Miller Dr, Aug 10, 2026Plumbing, 1 Mia Terminal D, Aug 10, 2026Alteration or repair, 1 Mia Pbb Gate D22, Aug 8, 2026Alteration or repair, 1 Mia Pbb Gate F5, Aug 8, 2026Alteration or repair, 1 Mia Pbb Gate H14, Aug 8, 2026Mechanical (HVAC), 1 Mia South Term Expansion, Aug 6, 2026Electrical, 1 Mia Bldg 916, Aug 4, 2026Electrical, 1 Mia Bldg 3041, Aug 4, 2026Electrical, 1 Mia Fuel Farm Tank 14, Aug 3, 2026Electrical, 1 Mia S Term Expansion, Jul 31, 2026Electrical, 1 Mia 4640 NW 36 St, Jul 30, 2026Fire systems, 1 Mia Cc D 2nd Floor, Jul 29, 2026Alteration or repair, 1 Mia Bldg 3038, Jul 29, 2026Alteration or repair, 1 Mia Fuel Farm Tank 14, Jul 28, 2026Electrical, 1miad Conc H 3rd Lv(Near H5), Jul 28, 2026Roofing, 1 Mia North Upper Roof, Jul 28, 2026Mechanical (HVAC), 1 Mia 5300 NW 36 St, Jul 27, 2026Electrical, 1miad Bldg 709, Jul 27, 2026Mechanical (HVAC), 1 Mia Cc D 2nd Floor, Jul 24, 2026Fire systems, 1 Mia Bldg 863, Jul 24, 2026Mechanical (HVAC), 1 Mia South Term Expansion, Jul 23, 2026Alteration or repair, 1 Mia Term E 3 Floor E3420, Jul 23, 2026Electrical, 1 Mia Cc D, Jul 22, 2026Electrical, 1 Mia Gate 7-10 16&32, Jul 22, 2026Electrical, 1 Mia 5300 NW 36 St, Jul 21, 2026Electrical, 1 Mia Bldg 716 Tower A&B, Jul 20, 2026Electrical, 1 Mia S Term Expansion, Jul 17, 2026Electrical, 1 Mia 5300 NW 36 St, Jul 17, 2026Solar, 1 Mia Wide Reroofing, Jul 17, 2026Electrical, 1 Mia Cc D 2nd Floor, Jul 16, 2026Plumbing, 1 Mia Satellite E Dc 2028, Jul 15, 2026Electrical, 1 Mia Bldg 3030 E Win, Jul 15, 2026Plumbing, 1 Mia Satellite E Dc 1947, Jul 15, 2026Electrical, 1 Mia Cc D 2nd Floor, Jul 14, 2026Plumbing, 1 Mia Term E-F Emr, Jul 14, 2026Plumbing, 1miad Bldg 709, Jul 14, 2026Electrical, 1 Mia Central Base Aoa Gate, Jul 14, 2026Alteration or repair, 1 Mia Cc G Triturator, Jul 13, 2026Electrical, 1 Mia Bldg 708, Jul 13, 2026Electrical, 1 Miad Term D20, Jul 9, 2026Alteration or repair, 1 Mia Cc E 2 Floor, Jul 8, 2026Electrical, 1 Mia Central Base Aoa Gate, Jul 6, 2026Mechanical (HVAC), 1 Mia Term J Fis Checkpoint, Jul 2, 2026Alteration or repair, 1 Mia Cc E 2nd Level, Jul 2, 2026Electrical, 1 Mia Park 6 Bldg 3109, Jul 1, 2026Mechanical (HVAC), 1miad Concourse E Chiller P, Jul 1, 2026Alteration or repair, 1 Mia Cc D 2nd Floor, Jun 29, 2026Mechanical (HVAC), 1miad Concourse E Chiller P, Jun 29, 2026Electrical, 1 Mia 5300 NW 36 St, Jun 26, 2026Alteration or repair, 1 Mia N Term Centurion Launge, Jun 25, 2026Roofing, 1 Mia Cc D15-D19, Jun 25, 2026Electrical, 1 Mia Satellite E 2nd 4 Floor, Jun 23, 2026Alteration or repair, 1 Mia Median Central Blvd, Jun 22, 2026Electrical, 1 Mia Term E\,H\,J, Jun 18, 2026Electrical, 1 Mia Concourse G, Jun 18, 2026Electrical, 1 Mia Cbp Office 3 Floor, Jun 18, 2026Mechanical (HVAC), 1 Mia Terminal D, Jun 17, 2026Electrical, 1 Mia Bldg 916, Jun 16, 2026Electrical, 1 Mia Terminal G Bus Station, Jun 16, 2026Electrical, 1miad Concourse E Chiller P, Jun 15, 2026Electrical, 1 Mia 5300 NW 36 St, Jun 15, 2026Roofing, 1 Mia Satellite E 2nd 4 Floor, Jun 12, 2026Alteration or repair, 1 Mia North Term D29, Jun 12, 2026Alteration or repair, 1 Mia Bldg 7200, Jun 11, 2026Plumbing, 1 Mia S Term Gate J3, Jun 10, 2026Plumbing, 1 Mia Cc J Near J9, Jun 10, 2026Alteration or repair, 1 Mia Bldg 850, Jun 10, 2026Alteration or repair, 1 Mia Bldg 3030 Warehouse, Jun 9, 2026Electrical, 1 Miad Term D20, Jun 8, 2026Electrical, 1 Miad Term D11, Jun 8, 2026Electrical, 1 Miad Term D10, Jun 8, 2026Electrical, 1 Mia South Term Gse, Jun 8, 2026Elevator, 1 Mia Cc D Gate D-15, Jun 4, 2026Electrical, 1 Mia Cc D Counter, Jun 4, 2026Plumbing, 1miad Conc H 3rd Lv(Near H5), Jun 3, 2026Plumbing, 1 Mia Term G 1st Level, Jun 3, 2026Electrical, 1 Mia Bldg 916, Jun 2, 2026Electrical, 1 Mia Cc D 2nd Floor, May 29, 2026Plumbing, 1 Mia Cc D 2nd Floor, May 29, 2026Electrical, 2100 NW 42 Ave Cc-D, May 29, 2026Electrical, 1 Mia Bldg 3038, May 28, 2026Electrical, 1mia 2nd Floor Depart Door 12, May 27, 2026Electrical, 1 Mia Bldg 874, May 27, 2026Electrical, 1 Mia Bldg 874, May 27, 2026Mechanical (HVAC), 1 Mia Concourse F 2 Floor, May 27, 2026Fire systems, 1 Mia Bldg 3099, May 27, 2026Electrical, 1 Mia Term D5, May 26, 2026Mechanical (HVAC), 1 Mia Ahs 3, May 26, 2026Elevator, 1 Mia Gate D14 Elevator, May 26, 2026Alteration or repair, 1 Mia Cc D 2nd Floor, May 26, 2026Mechanical (HVAC), 1 Mia Term E Skyride, May 22, 2026Mechanical (HVAC), 1 Mia Bldg 60-861, May 22, 2026Alteration or repair, 1miad Concourse E Chiller P, May 22, 2026Alteration or repair, 1 Mia Bldg 3038, May 21, 2026Electrical, 1 Mia Bldg 3033, May 20, 2026Alteration or repair, 1 Mia Dolphin Bridge, May 19, 2026Alteration or repair, 1 Mia Central Term Flag Plaza, May 19, 2026Fire systems, 1 Mia Term E Fis South Emr, May 19, 2026Electrical, 1 Mia Term J Fis Checkpoint, May 19, 2026Electrical, 1 Mia Bldg 3202, May 19, 2026Electrical, 1 Mia Bldg 3094, May 19, 2026Electrical, 1 Mia Bldg 874, May 19, 2026Electrical, 1 Mia 5300 NW 36 St, May 19, 2026Fire systems, 1 Mia Term G Ramp Landside, May 19, 2026Plumbing, 1 Mia Term G 1st Level, May 15, 2026Electrical, 1 Mia Bldg 916, May 15, 2026Electrical, 1 Mia Bldg 754 Latan Hanger, May 15, 2026Alteration or repair, 1 Mia South Terminal, May 14, 2026Electrical, 1 Mia Taxi Lane Improvement, May 14, 2026Electrical, 1 Mia Terminal D, May 14, 2026Elevator, 1 Mia Gate D6 Elevator, May 14, 2026Alteration or repair, 1 Mia Bldg 3094 5 Floor, May 13, 2026Mechanical (HVAC), 1 Mia Bldg 3202, May 12, 2026Roofing, 1 Mia Term F Stairwell, May 12, 2026Electrical, 1 Mia Cargo Bldg 714, May 12, 2026Electrical, 1 Mia Cargo Bldg 714, May 12, 2026Electrical, 1 Mia Tank 16 Dike Area 4, May 12, 2026Mechanical (HVAC), 1 Mia Cc D48 Ahs11 Tank, May 12, 2026Mechanical (HVAC), 1 Mia Ahs 16 Pneumatic Tanks, May 12, 2026Elevator, 1 Mia Gate D10-D12 Elevator, May 12, 2026Electrical, 1 Miad Termninal D, May 11, 2026Alteration or repair, 1 Mia Cargo Bldg 714, May 11, 2026Electrical, 1 Mia 5300 NW 36 St, May 11, 2026Alteration or repair, 1 Mia 5300 NW 36 St, May 11, 2026Alteration or repair, 1 Mia 5300 NW 36 St, May 11, 2026Mechanical (HVAC), 1 Mia 5300 NW 36 St, May 11, 2026Alteration or repair, 1 Mia Cc J, May 11, 2026Fire systems, 1 Bldg 754, May 7, 2026Mechanical (HVAC), 1mia Bldg 3090 Carpenter Shop, May 7, 2026Plumbing, 1 Mia S Term Gate J3, May 7, 2026Sign, 1 Miad Bldg 3030, May 6, 2026Electrical, 1miad Conc H 3rd Lv(Near H5), May 6, 2026Electrical, 1 Mia Terminal D, May 6, 2026Electrical, 1 Mia 5300 NW 36 St, May 6, 2026Fire systems, 1 Mia Satellite E Dc 1949, May 6, 2026Fire systems, 1 Mia Satellite E Dc 1948, May 6, 2026Fire systems, 1 Mia Term E Fis North Emr, May 6, 2026Fire systems, 1 Mia 5300 NW 36 St, May 4, 2026New building, 1 Mia South Term Gse, May 18, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade

1 Mia Cc E

Miami-Dade County, FL 33166

The biggest project within a quarter mile since May 1: a $126M project at 1 Mia Wide Reroofing, permitted Jul 17.

Three permits on record here. The newest, Sep 18: Access control. Within a quarter mile, the county has issued 218 more permits (212 projects) since May 1. One is for a new building, under 10 ft away.

MayJunJulAugSepOct
Here3 permits · 1 Mia Cc E
  1. Access control
    Electrical
    Sep 18$320,985
  2. Jul 17$320,985
  3. Door set repla
    Alteration or repair
    May 7$320,985
Next doorunder 250 ft · 122 permits in 121 projects · 1 new building, $750,000
  1. Repl.grease trap
    1 Mia Cc H Near Gate H5 · under 10 ft · Alteration or repair
    Oct 6$319,983
  2. Alteration interior
    1 Mia Sourt Term H20370 · under 10 ft · Alteration or repair
    Oct 6$328,770
  3. Office interior
    1 Mia Bldg 702 205 · under 10 ft · Alteration or repair
    Oct 6$17,000
  4. Glazing replacement
    1 Miad Concourse H · under 10 ft · Alteration or repair
    Oct 6$17,000,000
  5. New glass railling
    1 Mia Walkway 2625 And 1081 · under 10 ft · Alteration or repair
    Oct 5$60,000
  6. Sprinkler heads
    1 Mia Cc F Sky Bridge · under 10 ft · Fire systems
    Oct 5$2,384,240
  7. Floor drains
    1 Mia 5200 NW 21 St · under 10 ft · Plumbing
    Oct 1$12,000
  8. Repair loading dock
    1 Mia Dolphin Garage Bldg 770 · under 10 ft · Alteration or repair
    Oct 1$100,000
  9. Repl 102lf 8'
    1 Mia Term F Door 13 · under 10 ft · Plumbing
    Oct 1$600,000
  10. Interior buildout
    1 Mia Cc J 3-4 Levels · under 10 ft · Plumbing
    Sep 30$12,200,000
  11. Reconnect EV charge
    1 Mia Park 1 Ev Charger · under 10 ft · Electrical
    Sep 30$5,405
  12. Display kiosk
    1 Mia N Terminal Rotunda D-38 · under 10 ft · Alteration or repair
    Sep 30$6,800
  13. Elevator modernztin
    1 Mia Gate D6 Elevator · under 10 ft · Mechanical (HVAC)
    Sep 24$270,000
  14. Elevator moderni
    1 Mia Cc D Gate D-15 · under 10 ft · Mechanical (HVAC)
    Sep 24$270,000
  15. Elevator modernz
    1 Mia Gate D10-D12 Elevator · under 10 ft · Mechanical (HVAC)
    Sep 24$270,000
  16. Inst 2 grease duct
    1 Mia Cc D Chef Creole · under 10 ft · Mechanical (HVAC)
    Sep 23$5,000
  17. Interior millwork
    1 Mia Concourse G Gate G4 · under 10 ft · Electrical
    Sep 23$163,784
  18. Sep 23$432,175
  19. New junction
    1 Mia Term E Bus Station Emr · under 10 ft · Electrical
    Sep 23$120,000
  20. Ground service equp
    1 Mia South Terminal · under 10 ft · Electrical
    Sep 22$12,000,000
  21. General elec
    1 Mia Park 4 · under 10 ft · Electrical
    Sep 22$3,500
  22. Electrical repairs
    1 Mia Cc F Sky Bridge · under 10 ft · Electrical
    Sep 18$2,384,240
  23. Lightpole/data comm
    1 Mia South Term Gse · under 10 ft · Electrical
    Sep 18$750,000
  24. Termp. Power constn
    1 Mia South Term Gse · under 10 ft · Electrical
    Sep 17$750,000
  25. Burgular alarm
    1 Mia Bldg 7200 · under 10 ft · Electrical
    Sep 17$5,300,000
  26. Elec:cctv\,datacommu
    1 Mia Bldg 7200 · under 10 ft · Electrical
    Sep 17$5,300,000
  27. Sep 17$17,800,000
  28. Ac/heat/insulat/duc
    1 Mia Cc J 3-4 Levels · under 10 ft · Mechanical (HVAC)
    Sep 16$12,200,000
  29. General elec
    1 Mia Bldg 3151 · under 10 ft · Electrical
    Sep 16$1,234,540
  30. Interior milkwork
    1 Mia Cc F 2nd Level · under 10 ft · Alteration or repair
    Sep 16$443,090
  31. Lighting pole
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    Sep 16$5,000,000
  32. Civil utilities
    1 Mia South Terminal · under 10 ft · Alteration or repair
    Sep 16$12,000,000
  33. Burgular alarm
    1 Mia Bldg 916 · under 10 ft · Electrical
    Sep 15$225,323
  34. Minor renovation
    1 Mia Bldg 916 · under 10 ft · Electrical
    Sep 14$21,000
  35. General plum
    1 Mia Pbb Gate D22 · under 10 ft · Plumbing
    Sep 14$1,000,000
  36. Ac/heat/insulat/prs
    1 Mia Pbb Gate D22 · under 10 ft · Mechanical (HVAC)
    Sep 14$1,000,000
  37. Grab and go concess
    1 Mia Concourse F Gate F7 · under 10 ft · Alteration or repair
    Sep 13$432,175
  38. Interior millwork
    1 Mia Concourse G Gate G4 · under 10 ft · Alteration or repair
    Sep 10$163,784
  39. Elevator moderni
    1 Mia Cc D Gate D-15 · under 10 ft · Electrical
    Sep 10$270,000
  40. Parking illuminatio
    1 Miad Bldg 3150 · under 10 ft · Electrical
    Sep 9$63,900
  41. Fire alarm
    1 Mia Gate D10-D12 Elevator · under 10 ft · Electrical
    Sep 9$270,000
  42. Elevator modernz
    1 Mia Gate D10-D12 Elevator · under 10 ft · Electrical
    Sep 9$270,000
  43. Elevator moderniztn
    1 Mia Gate D14 Elevator · under 10 ft · Electrical
    Sep 9$270,000
  44. Pbb replacement
    1 Mia Pbb Gate F3 · under 10 ft · Alteration or repair
    Sep 8$1,000,000
  45. Pbb replacement
    1 Mia Pbb Gate D16 · under 10 ft · Alteration or repair
    Sep 8$1,000,000
  46. Hook up bridge pca
    1 Mia Pbb Gate D22 · under 10 ft · Electrical
    Sep 4$1,000,000
  47. Electrical repairs × 2 permits
    1 Mia Wide Reroofing · under 10 ft · Electrical
    Aug 27 to Sep 3$125,703,562
  48. Fire alarm
    1 Mia Cc D Gate D-15 · under 10 ft · Electrical
    Sep 3$270,000
  49. Sep 2$120,000
  50. Curtain install
    1 Mia Bldg 3030 Shop · under 10 ft · Mechanical (HVAC)
    Sep 2$7,508
  51. Fire alarm N
    1 Mia Gate D14 Elevator · under 10 ft · Electrical
    Sep 2$270,000
  52. Site untility
    1 Mia South Term Expansion · under 10 ft · Fire systems
    Aug 31$5,287,540
  53. Repl. 2O ton ahv
    1 Mia Fiel Lighting Vault · under 10 ft · Mechanical (HVAC)
    Aug 31$23,942
  54. Foundation only a
    1 Mia South Term Expansion · under 10 ft · Electrical
    Aug 28$5,287,540
  55. Foundation only
    1 Mia South Term Gse · under 10 ft · Plumbing
    Aug 27$750,000
  56. Foundation only
    1 Mia South Term Gse · under 10 ft · Mechanical (HVAC)
    Aug 27$750,000
  57. Interior alteration
    1 Mia Bldg 3030 Warehouse · under 10 ft · Fire systems
    Aug 27$149,000
  58. Swer capping
    1 Mia Bldg 3030 Warehouse · under 10 ft · Plumbing
    Aug 26$149,000
  59. Duck\,exhaust replcm
    1 Mia Wide Reroofing · under 10 ft · Mechanical (HVAC)
    Aug 26$125,703,562
  60. Reloc. Fire heads r
    1 Mia Cc E 2nd Level · under 10 ft · Fire systems
    Aug 25$208,000
  61. Site utility y
    1 Mia South Term Gse · under 10 ft · Plumbing
    Aug 25$750,000
  62. Aug 25$5,287,540
  63. Plum grease trap
    1 Mia Cc E 2nd Level · under 10 ft · Plumbing
    Aug 25$208,000
  64. Plum alt/natr gasor
    1 Mia Cc E 2 Floor · under 10 ft · Plumbing
    Aug 25$192,000
  65. Int build out
    1miad Conc H 3rd Lv(Near H5) · under 10 ft · Mechanical (HVAC)
    Aug 21$800,000
  66. Pbb replacement
    1 Mia Pbb Gate H14 · under 10 ft · Plumbing
    Aug 20$1,000,000
  67. Bldg repair/gas bus
    1 Mia Bldg 3151 · under 10 ft · Alteration or repair
    Aug 19$1,234,540
  68. Pbb replacement
    1 Mia Pbb Gate D21 · under 10 ft · Alteration or repair
    Aug 18$1,000,000
  69. Ac install/ piping
    1 Mia Pbb Gate H14 · under 10 ft · Mechanical (HVAC)
    Aug 17$1,000,000
  70. Pbb replacement
    1 Mia Pbb Gate H14 · under 10 ft · Electrical
    Aug 14$1,000,000
  71. Interior alteration
    1 Mia Bldg 3030 Warehouse · under 10 ft · Mechanical (HVAC)
    Aug 14$149,000
  72. Interior buildout
    1 Mia Cc J 3-4 Levels · under 10 ft · Alteration or repair
    Aug 13$12,200,000
  73. Alteration interior
    1 Mia Cc E 2nd Level · under 10 ft · Electrical
    Aug 13$208,000
  74. Perimeter fence
    1 Mia 2301 NW 33 Ave · under 10 ft · Fence, wall or deck
    Aug 13$100,000
  75. Aug 13$12,431,853
  76. Alteration interior
    1 Mia Cc E 2 Floor · under 10 ft · Electrical
    Aug 11$192,000
  77. Aug 11$400,000
  78. Duct modify
    1 Mia Term E 3 Floor E3420 · under 10 ft · Mechanical (HVAC)
    Aug 11$400,000
  79. Plum as per plans
    1 Mia Terminal D · under 10 ft · Plumbing
    Aug 10$15,000,000
  80. Pbb replacement
    1 Mia Pbb Gate D22 · under 10 ft · Alteration or repair
    Aug 8$1,000,000
  81. Pbb replacement
    1 Mia Pbb Gate F5 · under 10 ft · Alteration or repair
    Aug 8$1,000,000
  82. Pbb replacement
    1 Mia Pbb Gate H14 · under 10 ft · Alteration or repair
    Aug 8$1,000,000
  83. Double walled fuel
    1 Mia South Term Expansion · under 10 ft · Mechanical (HVAC)
    Aug 6$17,800,000
  84. Install devices
    1 Mia Bldg 916 · under 10 ft · Electrical
    Aug 4$225,323
  85. Access control
    1miad Conc H 3rd Lv(Near H5) · under 10 ft · Electrical
    Jul 28$800,000
  86. Jul 27$5,000,000
  87. HVAC Undergnd pipin
    1 Mia South Term Expansion · under 10 ft · Mechanical (HVAC)
    Jul 23$5,287,540
  88. Interior alteration
    1 Mia Term E 3 Floor E3420 · under 10 ft · Alteration or repair
    Jul 23$400,000
  89. Access control
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    Jul 21$5,000,000
  90. Install phone cable
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    Jul 17$5,000,000
  91. Jul 17$125,703,562
  92. Alteration interior
    1 Mia Cc E 2 Floor · under 10 ft · Alteration or repair
    Jul 8$192,000
  93. Alteration interior
    1 Mia Cc E 2nd Level · under 10 ft · Alteration or repair
    Jul 2$208,000
  94. New fundation
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    Jun 26$5,000,000
  95. Jun 23$12,431,853
  96. INT. Alt new aoc
    1 Mia Terminal D · under 10 ft · Mechanical (HVAC)
    Jun 17$15,000,000
  97. Elect renovation
    1 Mia Bldg 916 · under 10 ft · Electrical
    Jun 16$21,000
  98. Suppresion system
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    Jun 15$5,000,000
  99. Jun 12$12,431,853
  100. Reconfigure office
    1 Mia Bldg 7200 · under 10 ft · Alteration or repair
    Jun 11$5,300,000
  101. Interior alteration
    1 Mia Bldg 3030 Warehouse · under 10 ft · Alteration or repair
    Jun 9$149,000
  102. Civil underg elec
    1 Mia South Term Gse · under 10 ft · Electrical
    Jun 8$750,000
  103. Elevator moderni
    1 Mia Cc D Gate D-15 · under 10 ft · Elevator
    Jun 4$270,000
  104. Jun 3$800,000
  105. Replace cable
    1 Mia Bldg 916 · under 10 ft · Electrical
    Jun 2$38,030
  106. May 26$270,000
  107. Bms installation
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    May 19$5,000,000
  108. Foundation only
    1 Mia South Term Gse · under 10 ft · New building
    May 18$750,000
  109. Security system ins
    1 Mia Bldg 916 · under 10 ft · Electrical
    May 15$225,323
  110. Install piles
    1 Mia South Terminal · under 10 ft · Alteration or repair
    May 14$13,146,387
  111. Lv data new aoc
    1 Mia Terminal D · under 10 ft · Electrical
    May 14$15,000,000
  112. May 14$270,000
  113. May 12$270,000
  114. Fire alarm system
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    May 11$5,000,000
  115. Exterior doors
    1 Mia 5300 NW 36 St · under 10 ft · Alteration or repair
    May 11$5,000,000
  116. New fundation
    1 Mia 5300 NW 36 St · under 10 ft · Alteration or repair
    May 11$5,000,000
  117. New fundation
    1 Mia 5300 NW 36 St · under 10 ft · Mechanical (HVAC)
    May 11$5,000,000
  118. Fire alarm
    1miad Conc H 3rd Lv(Near H5) · under 10 ft · Electrical
    May 6$800,000
  119. INT. Alt new aoc
    1 Mia Terminal D · under 10 ft · Electrical
    May 6$15,000,000
  120. Install data cables
    1 Mia 5300 NW 36 St · under 10 ft · Electrical
    May 6$5,000,000
  121. Fire spnkler/foam S
    1 Mia 5300 NW 36 St · under 10 ft · Fire systems
    May 4$5,000,000
This block250 to 1,000 ft · 95 permits in 90 projects
  1. Conduit/cut restore
    1 Mia Bldg 3041 · 980 ft W · Electrical
    Aug 4$1,000
  2. Aug 3$1,400,000
  3. Temp trailer × 2 permits
    1 Mia S Term Expansion · 980 ft W · Electrical
    Jul 17 to 31$10,000
  4. Service repair
    1 Mia 4640 NW 36 St · 980 ft W · Electrical
    Jul 30$1,933
  5. Sprinkler head relc
    1 Mia Cc D 2nd Floor · 980 ft W · Fire systems
    Jul 29$318,000
  6. 3 Ply bur system
    1 Mia Bldg 3038 · 980 ft W · Alteration or repair
    Jul 29$1,005,560
  7. Tank 14
    1 Mia Fuel Farm Tank 14 · 980 ft W · Alteration or repair
    Jul 28$1,400,000
  8. Jul 28$1,279,000
  9. Pump room
    1miad Bldg 709 · 980 ft W · Electrical
    Jul 27$100,000
  10. Replace 4 ducts
    1 Mia Cc D 2nd Floor · 980 ft W · Mechanical (HVAC)
    Jul 24$318,000
  11. Fire line repair
    1 Mia Bldg 863 · 980 ft W · Fire systems
    Jul 24$11,000
  12. Sign installation
    1 Mia Cc D · 980 ft W · Electrical
    Jul 22$35,000
  13. Walkway pit lights
    1 Mia Gate 7-10 16&32 · 980 ft W · Electrical
    Jul 22$8,000
  14. Jul 20$68,608
  15. Fire alarm
    1 Mia Cc D 2nd Floor · 980 ft W · Electrical
    Jul 16$318,000
  16. Sump pump
    1 Mia Satellite E Dc 2028 · 980 ft W · Plumbing
    Jul 15$139,275
  17. New 20 amp circuit
    1 Mia Bldg 3030 E Win · 980 ft W · Electrical
    Jul 15$6,000
  18. Jul 15$139,275
  19. General&data&teleph
    1 Mia Cc D 2nd Floor · 980 ft W · Electrical
    Jul 14$318,000
  20. Sum pump 2273
    1 Mia Term E-F Emr · 980 ft W · Plumbing
    Jul 14$120,000
  21. Water cooler/eyewas
    1miad Bldg 709 · 980 ft W · Plumbing
    Jul 14$100,000
  22. Jul 14$7,000,000
  23. Wall str repair
    1 Mia Cc G Triturator · 980 ft W · Alteration or repair
    Jul 13$65,827
  24. El fixtures and rec
    1 Mia Bldg 708 · 980 ft W · Electrical
    Jul 13$186,000
  25. Data outlet inst × 2 permits
    1 Miad Term D20 · 980 ft W · Electrical
    Jun 8 to Jul 9$18,000
  26. Jul 6$7,000,000
  27. Interior renovation
    1 Mia Term J Fis Checkpoint · 980 ft W · Mechanical (HVAC)
    Jul 2$1,539,900
  28. Jul 1$4,000
  29. New chiller plant × 2 permits
    1miad Concourse E Chiller P · 980 ft W · Mechanical (HVAC)
    Jun 29 to Jul 1$29,259,230
  30. Interior remodel
    1 Mia Cc D 2nd Floor · 980 ft W · Alteration or repair
    Jun 29$318,000
  31. Repl.booster pump
    1 Mia N Term Centurion Launge · 980 ft W · Alteration or repair
    Jun 25$639,000
  32. Re-roof
    1 Mia Cc D15-D19 · 980 ft W · Roofing
    Jun 25$440,095
  33. Install art work
    1 Mia Median Central Blvd · 980 ft W · Alteration or repair
    Jun 22$5,000
  34. Reloctn pods camera
    1 Mia Term E\,H\,J · 980 ft W · Electrical
    Jun 18$50,000
  35. New cctv access con
    1 Mia Concourse G · 980 ft W · Electrical
    Jun 18$1,984,965
  36. Access control
    1 Mia Cbp Office 3 Floor · 980 ft W · Electrical
    Jun 18$97,400
  37. Jun 16$700,000
  38. Jun 15$29,259,230
  39. Fifa pop up
    1 Mia North Term D29 · 980 ft W · Alteration or repair
    Jun 12$4,860
  40. Repl. 2 Grease trap × 2 permits
    1 Mia S Term Gate J3 · 980 ft W · Plumbing
    May 7 to Jun 10$600,868
  41. Repl. Grease trap
    1 Mia Cc J Near J9 · 980 ft W · Plumbing
    Jun 10$481,635
  42. New ar-sfff
    1 Mia Bldg 850 · 980 ft W · Alteration or repair
    Jun 10$1,981,180
  43. Data outlet inst
    1 Miad Term D11 · 980 ft W · Electrical
    Jun 8$18,000
  44. Data outlet inst
    1 Miad Term D10 · 980 ft W · Electrical
    Jun 8$18,000
  45. Branch circuit
    1 Mia Cc D Counter · 980 ft W · Electrical
    Jun 4$6,816
  46. Jun 3$100,000
  47. Interior milkwork
    1 Mia Cc D 2nd Floor · 980 ft W · Electrical
    May 29$100,300
  48. May 29$100,300
  49. Repl.walkway pit
    2100 NW 42 Ave Cc-D · 980 ft W · Electrical
    May 29$400,000
  50. Recert. Repair
    1 Mia Bldg 3038 · 980 ft W · Electrical
    May 28$1,005,560
  51. May 27$14,400
  52. Interior alteration × 2 permits
    1 Mia Bldg 874 · 980 ft W · Electrical
    May 27$13,125,000
  53. INT. Renov.rep.gate
    1 Mia Concourse F 2 Floor · 980 ft W · Mechanical (HVAC)
    May 27$1,574,100
  54. 6 Sprinkler heads
    1 Mia Bldg 3099 · 980 ft W · Fire systems
    May 27$4,000
  55. Data oulet install
    1 Mia Term D5 · 980 ft W · Electrical
    May 26$18,000
  56. Compressor replacmt
    1 Mia Ahs 3 · 980 ft W · Mechanical (HVAC)
    May 26$5,000
  57. Interior milkwork
    1 Mia Cc D 2nd Floor · 980 ft W · Alteration or repair
    May 26$100,300
  58. Pump replacement
    1 Mia Term E Skyride · 980 ft W · Mechanical (HVAC)
    May 22$8,713
  59. Pump replace
    1 Mia Bldg 60-861 · 980 ft W · Mechanical (HVAC)
    May 22$43,895
  60. New chiller plant
    1miad Concourse E Chiller P · 980 ft W · Alteration or repair
    May 22$29,259,230
  61. Recert. Repair
    1 Mia Bldg 3038 · 980 ft W · Alteration or repair
    May 21$1,005,560
  62. Repair\,40 year cert
    1 Mia Bldg 3033 · 980 ft W · Electrical
    May 20$1,246,331
  63. Structural repair
    1 Mia Dolphin Bridge · 980 ft W · Alteration or repair
    May 19$287,847
  64. Repl anchor bolts
    1 Mia Central Term Flag Plaza · 980 ft W · Alteration or repair
    May 19$180,000
  65. May 19$120,000
  66. May 19$1,539,900
  67. Repl.ahu bldg recer
    1 Mia Bldg 3202 · 980 ft W · Electrical
    May 19$1,238,040
  68. Repair recert 3094
    1 Mia Bldg 3094 · 980 ft W · Electrical
    May 19$1,208,400
  69. Access control
    1 Mia Bldg 874 · 980 ft W · Electrical
    May 19$13,125,000
  70. Fire sprinkler
    1 Mia Term G Ramp Landside · 980 ft W · Fire systems
    May 19$1,200,000
  71. May 15$100,000
  72. May 15$36,900
  73. Improvements
    1 Mia Taxi Lane Improvement · 980 ft W · Electrical
    May 14$21,641,950
  74. Rep concrete joist
    1 Mia Bldg 3094 5 Floor · 980 ft W · Alteration or repair
    May 13$128,800
  75. Repl.ahu bldg recer
    1 Mia Bldg 3202 · 980 ft W · Mechanical (HVAC)
    May 12$1,238,040
  76. Re-roof
    1 Mia Term F Stairwell · 980 ft W · Roofing
    May 12$23,100
  77. Light upgradepole
    1 Mia Cargo Bldg 714 · 980 ft W · Electrical
    May 12$586,600
  78. Update base pole
    1 Mia Cargo Bldg 714 · 980 ft W · Electrical
    May 12$586,600
  79. May 12$1,986,000
  80. Install ahs11 tank
    1 Mia Cc D48 Ahs11 Tank · 980 ft W · Mechanical (HVAC)
    May 12$5,000
  81. Repl. Tank ahs 16
    1 Mia Ahs 16 Pneumatic Tanks · 980 ft W · Mechanical (HVAC)
    May 12$5,000
  82. Strapping repl
    1 Miad Termninal D · 980 ft W · Electrical
    May 11$1,420,000
  83. Reapir ligth pole
    1 Mia Cargo Bldg 714 · 980 ft W · Alteration or repair
    May 11$586,600
  84. Repair expand joint
    1 Mia Cc J · 980 ft W · Alteration or repair
    May 11$420,000
  85. Upgrade fire sprink
    1 Bldg 754 · 980 ft W · Fire systems
    May 7$43,756
  86. Exact change out
    1mia Bldg 3090 Carpenter Shop · 980 ft W · Mechanical (HVAC)
    May 7$12,272
  87. May 6$80,000
  88. Install sprinkler
    1 Mia Satellite E Dc 1949 · 980 ft W · Fire systems
    May 6$139,275
  89. Elevtr room 1948
    1 Mia Satellite E Dc 1948 · 980 ft W · Fire systems
    May 6$139,275
  90. Elev.modern.2272
    1 Mia Term E Fis North Emr · 980 ft W · Fire systems
    May 6$120,000
Within a quarter mile1,000 ft to ¼ mi · 1 permit
  1. Fire alarm
    685 Miller Dr · 0.25 mi NE · Electrical
    Aug 10$4,690

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Miami-Dade County Department of Regulatory and Economic Resources updated its data Oct 7, 2026. We checked it Oct 8, 03:10 UTC. See the county's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near