Skip map
Map preview
Open mapBack to list
- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
2450 Riverside Ave
Minneapolis, MN 55454
- At this address
- 79 permits on record. Newest issued Jun 29: Adding to CT scanner to existing space
- Within ¼ mile
- 3 more permits issued since May 1.
Within
Since
Here79 permits · 2450 Riverside Ave
-
Adding to CT scanner to existing spaceMechanical (HVAC)Jun 29$101,603
-
Jun 1not listed
-
Fairview riversidePlumbingApr 20not listed
-
Installing 2 VAV s from existing main duct with reheats and modifying exhaust ducts for shower/change room…Mechanical (HVAC)Apr 7$40,000
-
Floor 10 Upgraded Locker RoomPlumbingMar 27not listed
-
Install ventilation to new hazardous material roomMechanical (HVAC)Nov 25, 2025$12,035
-
GRDs and ductwork alterationMechanical (HVAC)Nov 21, 2025$10,000
-
Nov 20, 2025not listed
-
Nov 14, 2025not listed
-
Jun 11, 2025not listed
-
Install new vav to include 2 supply openings and 1 return opening in newly created vender closetMechanical (HVAC)Jun 6, 2025$6,337
-
BLDG1118359 Relocate ducts, diffusersMechanical (HVAC)May 19, 2025$32,832
-
Remodel existing 2nd floor Family Resource Center in the East BuildingAlteration or repairJan 21, 2025$356,421
-
Snowmelt design and conditions summary submittals are located in the document folder for referenceMechanical (HVAC)Nov 15, 2024$701,177
-
Oct 22, 2024not listed
-
Oct 10, 2024$9,585,000
-
Oct 1, 2024not listed
-
BLDG1080745 10 th floor demo and reconfigure HVACMechanical (HVAC)Sep 23, 2024$67,515
-
Remodeling 10th floor riverside east building - special pathogens unitAlteration or repairAug 1, 2024$615,000
-
Remodel suite 6000 to create pediatric rehab gymAlteration or repairJun 10, 2024$187,000
-
Jun 6, 2024not listed
-
M-Health Fairview/Rework existing duct and had ductless mini-spilt to elevator machine roomMechanical (HVAC)Apr 9, 2024$52,835
-
Dec 7, 2023$2,596,285
-
No review per department practiceMechanical (HVAC)Apr 14, 2023not listed
-
Remodel main and satellite labs on 3rd floorAlteration or repairSep 28, 2022$257,776
-
First floor alterations of dietary/food prep areaAlteration or repairJul 8, 2022$1,700,000
-
Installing new makeup air unit and three exhaust fans and associated duct work per attached plansMechanical (HVAC)Jun 24, 2022$97,450
-
HVAC alteration, demo existing ductwork and add new ductworkMechanical (HVAC)Jun 1, 2022$31,550
-
Jun 1, 2022not listed
-
Remodel 3rd Flr Histology Lab certificate of occupancy required no special inspections required yesAlteration or repairMay 31, 2022$430,319
-
Mar 3, 2022not listed
-
HVAC system alteration, adding 10 dual duct VAV and five VAV boxesMechanical (HVAC)Feb 28, 2022$158,348
-
Jan 31, 2022not listed
-
Jan 31, 2022$4,150
-
HVAC replacing two main rooftop unitsMechanical (HVAC)Jul 15, 2021$2,444,303
-
Tenant remodeling certificate of occupancy required: NO special inspections required: NO const type: I-A…Alteration or repairApr 29, 2021$200,000
-
Chiller platform structure renovations and addition ENGINEER: MBJ - Mark Cackoski #25835Alteration or repairDec 22, 2020$169,574
-
HVAC system, adding two new air cooled chillersMechanical (HVAC)Nov 17, 2020$704,800
-
Oct 1, 2020not listed
-
Reconfiguration of HVAC system including six VAV boxesMechanical (HVAC)Oct 1, 2020$96,050
-
Reconfiguration of HVAC system including replacement of two air handling units with energy recoveryMechanical (HVAC)Sep 14, 2020$663,759
-
Sep 10, 2020not listed
-
Icu #10a - bathroom remodelPlumbingAug 31, 2020not listed
-
Reconstruct East wing on 10th floor of B certificate of occupancy required no special inspections required…Alteration or repairAug 17, 2020$4,637,365
-
Process pipingMechanical (HVAC)Aug 13, 2020$61,220
-
Remodel Maternal Fetal Meds certificate of occupancy required no special inspections required no const type…Alteration or repairAug 6, 2020$127,349
-
Jul 27, 2020not listed
-
ELECTRONIC SUBMITTAL InteriorDemo12RoomsEastWing10thFlrBldgA All fire rated elements within the scope of work…Alteration or repairApr 21, 2020$887,652
-
HVAC system renovation including supply and return air diffusers and grills and all associated duct workMechanical (HVAC)Jan 27, 2020$22,500
-
HVAC system for partial upgrading including adding 27 VAV boxes andMechanical (HVAC)Dec 30, 2019$304,631
-
Dec 30, 2019not listed
-
Remodel west wing of 11th floor - NICUAlteration or repairDec 20, 2019$1,911,000
-
Oct 25, 2019not listed
-
Renovating 2nd floor HVAC, adding 20 ton chiller for MRI unitMechanical (HVAC)Oct 25, 2019$198,652
-
HVAC, remodeling part of building adding new air handling unit with VAV boxes and associated ductwork and…Mechanical (HVAC)Sep 23, 2019$152,220
-
Hand sinkPlumbingAug 27, 2019not listed
-
Feb 26, 2019not listed
-
Adding 4 VAV to space with related ductworkMechanical (HVAC)Jan 16, 2019$38,780
-
Alterations to levels 2, 3 and 5 of u of mAlteration or repairNov 9, 2018$10,884,000
-
HVAC Modifications 2nd level -hot water and ductwork to VAVMechanical (HVAC)Oct 2, 2018$5,695
-
Install vav to existing duct and duct silencerMechanical (HVAC)Sep 28, 2018$7,012
-
Sep 20, 2018not listed
-
Reconfiguration of reception triageAlteration or repairAug 29, 2018$300,763
-
Level 2,3, and 5PlumbingAug 21, 2018not listed
-
Partial HVAC demo levels 2,3 & 5 duct work alterations LP & HP steam and HW piping alterationsMechanical (HVAC)Aug 21, 2018$817,319
-
Jul 27, 2018not listed
-
MEDIA LOUNGE/MUSIC STUDIO certificate of occupancy required: no special inspections required: no const type…Alteration or repairJul 6, 2018$570,297
-
Sac pymt for bldg674324 - children's play areaAlteration or repairJan 11, 2018not listed
-
Heating equipment / replace stesam relief valve in boiler plantMechanical (HVAC)Oct 5, 2017$41,000
-
Replace ducts & diffusers in existing area / install new toilet exhaust fan / 1st floorMechanical (HVAC)Oct 5, 2017$15,600
-
1st floor bathroomPlumbingSep 29, 2017not listed
-
Convert gift shop space to childrens play areaAlteration or repairSep 20, 2017$1,134,960
-
5TH FLOOR - Wellness Spa duct alterations 5TH FLOOR - Wellness Spa duct alterationsMechanical (HVAC)Jan 25, 2017$10,500
-
2Nd floor demo and install new ductwork and vav's 2nd floor demo and install new ductwork and vav'sMechanical (HVAC)Jan 24, 2017$42,000
-
2Nd floorPlumbingJan 17, 2017not listed
-
5Th floorPlumbingJan 17, 2017not listed
-
Demo and finishes remove partition walls between (2) double roooms to enlarge both (kas#1) change lighting to…Alteration or repairDec 21, 2016$327,636
-
Dec 15, 2016$64,000
-
Demo and framing interior remodel of currenting waiting area to ftiness area in masonic childrens hospital…Alteration or repairDec 15, 2016$169,598
Sort
This block250 to 1,000 ft · 1 permit
-
East building second floor - remodeling nuclear and CT scanner rooms2450 Riverside Ave #East Bldg · 510 ft SE · Alteration or repairJun 23$1,052,874
Within a quarter mile1,000 ft to ¼ mi · 2 permits
-
Flat roof (maa)2015 Riverside Ave · 0.23 mi W · RoofingJun 25$115,250
-
Remove existing slate tiles731 21st Ave S · 0.24 mi SW · RoofingMay 28$131,550
Zoning requests nearbynot published by Minneapolis
We don't list zoning cases for Minneapolis yet. Look them up on the city's Zoning Board of Adjustment page.
More on this streetRiverside Ave · 3 other addresses with permits
- 2406 Riverside Ave newest permit Dec 3, 2025
- 2315 Riverside Ave newest permit Apr 22, 2025
- 2015 Riverside Ave newest permit Jun 25, 2026
Minneapolis Construction Code Services updated its data Oct 14, 2026. We checked it Oct 15, 14:17 UTC. See the city's official records.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near