Skip map
Map preview
Open mapBack to list
- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
80 8th St S
Minneapolis, MN 55402
- At this address
- 200 permits on record. Newest issued Sep 17: Add one 6" VASV for Conference room
- Within ¼ mile
- 117 more permits issued since May 1.
- Biggest nearby
- A $9.6M alteration or repair at 90 7th St S, permitted Jun 5, within ¼ mile since May 1.
Within
Since
Here200 permits · 80 8th St S
-
Add one 6" VASV for Conference roomMechanical (HVAC)Sep 17$5,120
-
Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: IA… × 2 permitsAlteration or repairAug 19 to Sep 9$166,378
-
Tenant improvement including merging suites -ACW certificate of occupancy required: no special inspections…Alteration or repairSep 9$67,940
-
Aug 28not listed
-
Aug 20not listed
-
Shuffle existing diffusers, ductwork, new layoutMechanical (HVAC)Aug 7$2,000
-
Suite 1850. Relocate 2 VAV.sMechanical (HVAC)Jul 21$15,210
-
Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type…Alteration or repairJul 16$137,545
-
HVAC alterations include modifying the existing distribution system through the current air handling unitsMechanical (HVAC)Jul 15$35,500
-
Jun 15not listed
-
Office alterations on 33rd floorAlteration or repairJun 9$20,471
-
Replace 7 diffusers and add 1 diffuserMechanical (HVAC)May 29$2,820
-
T/I SUITE 3075 const type: IA occupancy: B 2020 MSBC occupant load: 39 architect: 17408 - HustadAlteration or repairMay 12$53,147
-
Remodel portion of office suite -ACW certificate of occupancy required: no special inspections required: no…Alteration or repairMay 12$850,000
-
36th floor white box demo and remodel bathroomsAlteration or repairApr 3$775,000
-
Relocate one diffuserMechanical (HVAC)Apr 1$2,110
-
Installing new ductwork for main distribution and two VAV boxesMechanical (HVAC)Mar 30$187,100
-
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no…Alteration or repairMar 23$38,781
-
Suite #3435 interior improvements certificate of occupancy required: no special inspections required: no…Alteration or repairMar 6$204,850
-
Remove internal staircaseAlteration or repairDec 23, 2025$85,746
-
Dec 18, 2025$30,450
-
Nov 20, 2025not listed
-
Nov 19, 2025not listed
-
HVAC alterations adding one VAV boxe to suit the new floor layoutMechanical (HVAC)Nov 13, 2025$6,800
-
Office remodel - suite 1600Alteration or repairNov 5, 2025$325,000
-
#300. Interior remodelAlteration or repairOct 30, 2025$211,544
-
Tenant Improvement - North Half of 11th FloorAlteration or repairOct 21, 2025$625,000
-
BLDG1148619 No drawingsMechanical (HVAC)Oct 15, 2025$13,400
-
Sep 25, 2025not listed
-
HVAC alterations include modifying the existing distribution system through the current air handling unitMechanical (HVAC)Sep 18, 2025$172,800
-
Sep 12, 2025not listed
-
Sep 5, 2025not listed
-
Interior remodel of the 43rd floor of the IDS centerAlteration or repairSep 5, 2025$3,391,000
-
Install dishwasher - Suite 3950PlumbingAug 26, 2025not listed
-
Installing GRDs and all associated ductworkMechanical (HVAC)Jun 20, 2025$5,220
-
Modify distribution on (3) existing VAVsMechanical (HVAC)Jun 5, 2025$11,100
-
T/I - 13TH FLOOR const type: IA occupancy: B 2020 MSBC occupant load: 246 architect: 23558 - WalzAlteration or repairJun 4, 2025$372,364
-
Replace DishwasherPlumbingJun 2, 2025not listed
-
Remodel suite 3850 & 3860 - "expansion of a tenant suite into an ajoining vacant suite" const type: IA…Alteration or repairMay 23, 2025$300,000
-
Remodel US Bank Skyway Level certificate of occupancy required: no special inspections required: no const…Alteration or repairMay 23, 2025$445,615
-
Dishwasher #300PlumbingFeb 18, 2025not listed
-
Hydronic piping for new AHU, VAV and FCU installations on Skyway Level for Associated BankMechanical (HVAC)Feb 13, 2025$83,425
-
Feb 11, 2025not listed
-
Full interior build out certificate of occupancy required: yesAlteration or repairFeb 10, 2025$750,000
-
Installing new air handling unitMechanical (HVAC)Jan 23, 2025$371,800
-
T/I - REMODEL SUITE 281 const type: IB occupancy: B 2020 MSBC sac: __2.39 charges __2.39 credits = __0.00 net…Alteration or repairDec 2, 2024$61,395
-
Oct 10, 2024not listed
-
35Th floor. Interior renovation of bank of america office spaceAlteration or repairSep 30, 2024$140,000
-
Replace chillerMechanical (HVAC)Sep 10, 2024$1,230,873
-
Sep 9, 2024not listed
-
T/I REMODEL const type: IA occupancy: B 2020 MSBC sprinklered: yes & no architect: 17408 - HustadAlteration or repairJul 8, 2024$205,000
-
Interior improvements at 30th floor corridorAlteration or repairJul 2, 2024$40,433
-
Installing new exhaust run to restroom and tying to existing systemMechanical (HVAC)Mar 22, 2024$1,500
-
Jan 24, 2024not listed
-
Remodel "break area", new "restroom"Alteration or repairJan 16, 2024$110,000
-
Suite 1900-FWHTMechanical (HVAC)Dec 14, 2023$41,100
-
Office remodeling - floor 19Alteration or repairDec 5, 2023$800,000
-
Nov 30, 2023not listed
-
Concrete repair in parking garageAlteration or repairOct 11, 2023$121,090
-
Interior demolition of full suite in preparation of full interior build outAlteration or repairSep 8, 2023$100,000
-
Replace dishwasherPlumbingAug 28, 2023not listed
-
Aug 17, 2023not listed
-
Demolition of existing connecting stair between 19th and 20th floorsAlteration or repairJul 7, 2023$84,446
-
Combine two office suites, 4535 4542 certificate of occupancy required: no const type: 1-A occupancy: B 2020…Alteration or repairJun 15, 2023$66,885
-
Jun 6, 2023not listed
-
Jun 6, 2023not listed
-
Plans available in ElmsMechanical (HVAC)May 31, 2023$101,900
-
Suite #3000 new demising wall and corridor extension after suite demo certificate of occupancy required: no…Alteration or repairMay 19, 2023$30,000
-
Remodel at suite #1500 (JJL) certificate of occupancy required: no special inspections required: no const…Alteration or repairMay 17, 2023$1,568,255
-
Demo and infill stairs certificate of occupancy required: no special inspections required: yes const type…Alteration or repairApr 18, 2023$130,000
-
SUITE 3450 MATTEL COMPANY EXPANSION certificate of occupancy required: no const type: 1-A occupancy: B 2020…Alteration or repairApr 7, 2023$47,014
-
Mar 14, 2023not listed
-
40 replacement VAV's, all new difussersMechanical (HVAC)Mar 7, 2023$184,200
-
INTERIOR REMODEL AT LEVEL 30 AND 31 (MAA) const type: 1 A occupancy: B 2020 MSBC occupant load: 75 AT LEVEL…Alteration or repairFeb 16, 2023$3,689,249
-
Feb 9, 2023not listed
-
Interior remodel (maa) revision after issuance 05.01.2023 add kitchen and remove few offices for…Alteration or repairFeb 9, 2023$413,240
-
HVAC modification adding two new VAV boxesMechanical (HVAC)Feb 7, 2023$21,400
-
Feb 2, 2023not listed
-
Minor duct modify for existing duct systemMechanical (HVAC)Jan 17, 2023$8,230
-
Water cooler 14th floor corridorPlumbingDec 27, 2022not listed
-
Minor revisions on two VAV distributionMechanical (HVAC)Dec 13, 2022$8,400
-
TENANT BUILDOUT OF SUITE 3850 IN THE IDS TOWER const type: 1A occupancy: B 2020 MSBC sprinklered: yes…Alteration or repairDec 13, 2022$138,732
-
14TH FLOOR - NEW WALLS-CORRIDOR EXTENSIONAlteration or repairDec 12, 2022$205,000
-
Buildout tenant areaMechanical (HVAC)Nov 3, 2022$63,600
-
Oct 11, 2022not listed
-
TI AT 42ND FLOOR (MAA) certificate of occupancy required: NO const type: I A occupancy: B 2020 MSBC occupant…Alteration or repairOct 7, 2022$985,984
-
(Dmh - projectdox) office demo and remodel to 13,259 sqft north half of 26th floorAlteration or repairSep 28, 2022$548,547
-
Sep 13, 2022$61,100
-
Remodel common area 26th floor certificate of occupancy required: no special inspections required: no const…Alteration or repairSep 8, 2022$112,339
-
Aug 22, 2022not listed
-
Aug 22, 2022not listed
-
HVAC system modification, adding (5) new diffusersMechanical (HVAC)Aug 22, 2022$3,770
-
Remove/re-install: (5) exhaust grillesMechanical (HVAC)Aug 15, 2022$2,220
-
Aug 8, 2022not listed
-
Office alterations in suite 2800Alteration or repairJul 18, 2022$357,370
-
HVAC system alteration, adding new 15 VAV boxesMechanical (HVAC)May 3, 2022$111,100
-
Apr 19, 2022not listed
-
Apr 19, 2022not listed
-
Apr 19, 2022not listed
-
Adding transfer fan (200 cfm)Mechanical (HVAC)Apr 19, 2022$3,110
-
Remodel 46th floor officesAlteration or repairApr 14, 2022$1,100,000
-
SUITE 3875 - BUILD OUT OF WHITEBOX SUITE certificate of occupancy required: no special inspections required…Alteration or repairMar 24, 2022$132,597
-
HVAC system of 42nd floor of IDS centerMechanical (HVAC)Mar 14, 2022$148,305
-
HVAC system alteration, rezoning VAV boxesMechanical (HVAC)Mar 14, 2022$17,900
-
26th floor 2 sinksPlumbingFeb 17, 2022not listed
-
Tenant Improvement - Suite 4200 - INTERIOR DEMO ONLY certificate of occupancy required: no special…Alteration or repairFeb 17, 2022$114,283
-
Randstad suite 2600Alteration or repairFeb 17, 2022$275,000
-
Feb 17, 2022not listed
-
43rd Floor - Vanilla Shell - Includes infill of existing floor opening certificate of occupancy required: no…Alteration or repairJan 11, 2022$642,746
-
Bathrooms on 43rd floorPlumbingDec 20, 2021not listed
-
Dec 8, 2021$148,305
-
Tenant Remodel - Suite 1550 certificate of occupancy required: no special inspections required: no const…Alteration or repairNov 24, 2021$119,214
-
Relocating 3 diffusers and adding oneMechanical (HVAC)Nov 8, 2021$2,220
-
HVAC system to accommodate for new layoutMechanical (HVAC)Nov 8, 2021$131,500
-
Nov 1, 2021not listed
-
SUITE 3710-Interior demolition and remodel certificate of occupancy required: no special inspections…Alteration or repairOct 26, 2021$139,422
-
Oct 12, 2021not listed
-
Remodel of 38th floor restroomsPlumbingOct 12, 2021not listed
-
Unprades to interior spaceAlteration or repairSep 28, 2021$874,121
-
38Th floor. Interior finish upgrades to lobby, restroom, and corridorsAlteration or repairSep 27, 2021$262,184
-
Adding exhaust grille to new ADA restroom and connecting to existing building exhaust systemMechanical (HVAC)Sep 2, 2021$2,660
-
(Dmh - projectdox) select demo and remodel to existing bankAlteration or repairAug 31, 2021$222,000
-
Unisex restroom 8th floorPlumbingAug 26, 2021not listed
-
Remove sliding glass door system and replace with pair of swing doors on skyway level - wells fargo bank…Alteration or repairMay 4, 2021$43,000
-
Apr 27, 2021not listed
-
8th floor corridor, lobby and restroom remodeling certificate of occupancy required: NO special inspections…Alteration or repairApr 22, 2021$163,234
-
Alterations to skyway level ATMsAlteration or repairJan 12, 2021$65,000
-
Contractor will install the heat exchangerMechanical (HVAC)Jan 11, 2021$282,655
-
Jan 7, 2021not listed
-
Crystal Court Renovation certificate of occupancy required: no special inspections required: yes const type…Alteration or repairJan 5, 2021$3,097,367
-
Ductwork modification per attached drawingsMechanical (HVAC)Dec 10, 2020$16,200
-
46th floor renovation for future tenant improvementAlteration or repairOct 30, 2020$495,376
-
Removal and replacement of ductwork for 46th floorMechanical (HVAC)Oct 15, 2020$155,455
-
INTERIOR REMODEL certificate of occupancy required: no special inspections required: no const type: I-A…Alteration or repairOct 8, 2020$70,872
-
Add one VAV for conference roomMechanical (HVAC)Oct 5, 2020$3,320
-
Reconfiguration of HVAC supply systemMechanical (HVAC)Jun 11, 2020$238,270
-
Jun 11, 2020not listed
-
Tenant remodeling - whole floor certificate of occupancy required: NO special inspections required: YES…Alteration or repairMay 21, 2020$2,310,622
-
Apr 2, 2020not listed
-
Mechanical (HVAC) permit, no description from the cityMechanical (HVAC)Mar 9, 2020$18,400
-
(Dmh#1) remodel to tenant #3710Alteration or repairMar 2, 2020$138,794
-
Feb 24, 2020not listed
-
6Th floor, suite 675 office remodelAlteration or repairFeb 10, 2020$381,633
-
Remodel of 7th floor ceiling tiles, reception areaAlteration or repairFeb 10, 2020$400,000
-
Core toilet facilities improvements serving 7th floor certificate of occupancy required: no special…Alteration or repairFeb 10, 2020$97,500
-
Install 2 new gate valves serving the cooling tower linesMechanical (HVAC)Jan 27, 2020$28,350
-
Tenant build out - 24th floorPlumbingJan 21, 2020not listed
-
41St floor-vermillion bank ______ add 3 vavsMechanical (HVAC)Jan 16, 2020$21,700
-
Jan 14, 2020not listed
-
Jan 13, 2020not listed
-
Tenant Remodel certificate of occupancy required: no special inspections required: no occupancy: B 2015 MSBC…Alteration or repairJan 8, 2020$80,413
-
Jan 8, 2020not listed
-
New starbucks coffe shop 1420 sqft (maa) done with reviewAlteration or repairJan 2, 2020$150,000
-
Tenant remodeling certificate of occupancy required: NO special inspections required: yes FIRE RATED…Alteration or repairNov 21, 2019$598,670
-
Non-struct remod suite 3715Alteration or repairNov 6, 2019$27,189
-
All new mains for 24th floorMechanical (HVAC)Oct 24, 2019$123,980
-
New HVAC for 47th floor / 2 new vavs & ductsMechanical (HVAC)Oct 23, 2019$133,295
-
24 New vav,s / new HVAC for 24th floorMechanical (HVAC)Oct 23, 2019$272,900
-
41St floor break room sinkPlumbingOct 22, 2019not listed
-
ELEVATOR LOBBY AND CORRIDOR REMODEL AT 41ST LEVEL (MAA) const type: IA occupancy: B 2015 MSBC sprinklered…Alteration or repairOct 18, 2019$84,830
-
Add 3 vav,s on 41st floor spec suiteMechanical (HVAC)Oct 18, 2019$16,120
-
Demo floorAlteration or repairOct 15, 2019$175,350
-
41St floor tenant buildoutAlteration or repairOct 4, 2019$245,156
-
Demo work on 24th floorAlteration or repairOct 3, 2019$175,350
-
Non-structural SUITE 4160 SUITE BUILDOUT 1994 SF B occupancyAlteration or repairOct 2, 2019$156,653
-
3Rd floor. Conference room remodelAlteration or repairAug 20, 2019$181,175
-
Modify lighting in conference room on 44th floorAlteration or repairAug 7, 2019$19,500
-
Modify existing HVAC / add new vav's / fs dampers at elevator lobbyMechanical (HVAC)Jun 28, 2019$427,900
-
Relocate 4 grills and diffusers, add 2 grills and diffusersMechanical (HVAC)Jun 19, 2019$1,100
-
Jun 19, 2019not listed
-
Renovation of just 25th floor adding 21 new VAV boxesMechanical (HVAC)Jun 13, 2019$139,800
-
Interior tenant remodeling certificate of occupancy required: NO special inspections required: NO const type…Alteration or repairMay 29, 2019$92,253
-
Condenser water 23rd floor / all new equipment on another permit from the same mechMechanical (HVAC)May 15, 2019$42,220
-
Add vav's & ducts per eng plans 25th floorMechanical (HVAC)Apr 5, 2019$121,400
-
Mar 28, 2019not listed
-
Feb 6, 2019not listed
-
Add 2 vav's to loungeMechanical (HVAC)Feb 6, 2019$7,700
-
Interior office remodel - floors 22, 23, 24, 25 - single tenantAlteration or repairJan 28, 2019$4,165,410
-
Suite # 800 8th floor interior remodelAlteration or repairJan 25, 2019$9,416
-
Relocate diffusers for 15th floorMechanical (HVAC)Jan 14, 2019$1,200
-
Tenant improvemenmt of existing office space on 15th floor of ids buildingAlteration or repairJan 7, 2019$47,726
-
15Th floor replace electPlumbingJan 3, 2019not listed
-
(Dmh#1) select demo and remodel to existing 18th floor tenant spaceAlteration or repairDec 31, 2018$45,410
-
Add 1 vav zone for 18th floorMechanical (HVAC)Dec 24, 2018$4,880
-
Alterations on 41st floor for employee amenity lounge - approx. 5100 sq ft. sck#1 alternate method approved…Alteration or repairDec 21, 2018$387,150
-
Suite # 2100 interior alterations certificate of occupancy required: no special inspections required: no…Alteration or repairNov 20, 2018$29,293
-
Nov 13, 2018not listed
-
48th FLOOR CORRIDORS AND RESTROOMS REMODEL (MAA) certificate of occupancy required: YES const type: I-A…Alteration or repairNov 2, 2018$94,300
-
TI - Expansion certificate of occupancy required: no special inspections required: no const type: 1A…Alteration or repairOct 10, 2018$135,250
-
23Rd & 25th flrs-add 4 vav's & 10 f/s dampers - revise ducts perengineered drawingsMechanical (HVAC)Sep 24, 2018$118,100
-
23rd and 25th floor DEMOAlteration or repairSep 21, 2018$542,500
-
49 Th floor interior remodelAlteration or repairAug 10, 2018$88,000
-
3 sinks to waste linePlumbingJul 20, 2018not listed
-
Office alterations on 40th and 41st floorsAlteration or repairApr 16, 2018$2,679,680
-
Non structural demo at suite 605 (maa)Alteration or repairApr 10, 2018$4,050
-
Expand existing office by adding approx. 2400 SQFT AT 48TH FLOOR (MAA #01) certificate of occupancy required…Alteration or repairMar 27, 2018$92,450
-
Mar 7, 2018$46,500
-
40th floor remodelPlumbingMar 7, 2018not listed
-
Ducts & vav's for 40th & 41st floors / 2 liebert unitsMechanical (HVAC)Mar 5, 2018$161,000
Sort
This block250 to 1,000 ft · 92 permits
-
Remove Existing Restroom Fixtures and Install New800 Marquette Ave · 340 ft S · PlumbingOct 6not listed
-
Remodel small area 10th floor 2020 msbc900 Nicollet Mall #H · 890 ft SW · Alteration or repairOct 5$60,000
-
New sinks and grease trap in an existing kitchen800 Nicollet Mall · 490 ft W · PlumbingOct 1not listed
-
Suite 1700. Tenant remodel121 8th St S · 660 ft S · Alteration or repairSep 30$247,904
-
THE QUINLAN ROOM certificate of occupancy required: YES const type: IA occupancy: A-2 2020 MSBC occupant…81 9th St S #100 · 710 ft SW · Alteration or repairSep 28not listed
-
HVAC alterations on Floors 33 and 34 include modifications to the existing air distribution systems served by…60 6th St S · 770 ft NE · Mechanical (HVAC)Sep 25$478,500
-
Plumbing fixtures for office remodel60 6th St S · 770 ft NE · PlumbingSep 24not listed
-
REMODEL CORRIDOR, 18th FLOOR const type: IA occupancy: B 2020 MSBC sprinklered: YES architect: 23558 - Walz801 Nicollet Mall · 260 ft SW · Alteration or repairSep 23$215,000
-
Furnish & install gas deduct meter86 9th St S · 490 ft S · PlumbingSep 21not listed
-
Replace Dishwasher Ste 1400225 6th St S · 990 ft E · PlumbingSep 18not listed
-
HVAC alterations using the existing distribution system through the current air handling units90 7th St S · 450 ft NE · Mechanical (HVAC)Sep 17$108,000
-
Replace (14) diffusers for new ceilings800 Nicollet Mall · 490 ft W · Mechanical (HVAC)Sep 16$7,920
-
Rearrange diffusers as shown on attached plans800 Lasalle Ave · 800 ft W · Mechanical (HVAC)Sep 11$85,000
-
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no…700 Nicollet Mall · 320 ft NW · Alteration or repairSep 10$112,183
-
Modify training space on Level 532 9th St S · 890 ft W · Alteration or repairSep 8$80,000
-
White box demo of 2 full floors -ACW certificate of occupancy required: no special inspections required: no…90 7th St S · 450 ft NE · Alteration or repairSep 2$175,000
-
Office remodel -ACW certificate of occupancy required: no special inspections required: no const type: IA…90 7th St S · 450 ft NE · Alteration or repairSep 2$627,376
-
HVAC modifications related to tenant build out, level 4790 7th St S · 450 ft NE · Mechanical (HVAC)Sep 1$161,400
-
Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type…60 6th St S · 770 ft NE · Alteration or repairAug 28$6,060,461
-
Ran approximately 10 feet of 3/4 gas piping with 4 outlets for four gas burning cooking appliances86 9th St S · 490 ft S · PlumbingAug 27not listed
-
Rework HVAC systems on levels 43- 4690 7th St S · 450 ft NE · Mechanical (HVAC)Aug 27$873,650
-
New restaurant tenant - 1st floor - bellcour certificate of occupancy required - an authorized representative…90 7th St S · 450 ft NE · Alteration or repairAug 27$847,525
-
4 new eggcrate, 2 new air transfers, 6 new linear diffusers225 6th St S · 990 ft E · Mechanical (HVAC)Aug 25$5,300
-
Install Plumbing for New Restaurant90 7th St S · 450 ft NE · PlumbingAug 25not listed
-
Expand tenant space -ACW certificate of occupancy required: no special inspections required: no const type…225 6th St S · 990 ft E · Alteration or repairAug 24$66,848
-
47th floor replace wellness sink, dishwasher, ice maker, coffee maker90 7th St S · 450 ft NE · PlumbingAug 21not listed
-
Add floor drain for cooler215 8th St S · 890 ft SE · PlumbingAug 21not listed
-
Tenant remodel - Suite 207 - Green and the Grain certificate of occupancy required: no special inspections…800 Nicollet Mall · 490 ft W · Alteration or repairAug 21$332,400
-
Install Break Room Sink and coffee maker/11th floor801 Nicollet Mall · 260 ft SW · PlumbingAug 20not listed
-
20th floor suite 2010800 Lasalle Ave · 800 ft W · Mechanical (HVAC)Aug 19$42,110
-
All gas piping and appliances shall be installed in accordance with the 2020 Minnesota State Fuel Gas Code…800 Nicollet Mall #240 · 490 ft W · PlumbingAug 19not listed
-
Temporary patches, small area roof 2020 msbc805 Hennepin Ave · 970 ft W · Alteration or repairAug 19$5,000
-
Demo Break Sink & Cap Plumbing Demo Break Sink & Set New Sink at Existing Plumbing225 6th St S · 990 ft E · PlumbingAug 13not listed
-
New break room sink in the Wagner suite on 20th floor800 Lasalle Ave · 800 ft W · PlumbingAug 10not listed
-
Suite 1900 - Install new break room sink and faucet800 Lasalle Ave · 800 ft W · PlumbingAug 7not listed
-
HVAC alterations reusing existing distribution system and VAV boxes replacing all GRDs121 8th St S · 660 ft S · Mechanical (HVAC)Aug 6$6,500
-
Demo interior of tenant space -ACW certificate of occupancy required: no special inspections required: no…60 6th St S · 770 ft NE · Alteration or repairAug 5$193,472
-
Provide & Install on existing rough-in: 2 - 6 gallon water heater800 Nicollet Mall · 490 ft W · PlumbingAug 4not listed
-
Demise and remodel tenant space -ACW certificate of occupancy required: no special inspections required: no…121 8th St S · 660 ft S · Alteration or repairAug 4$59,620
-
46th floor. remove and replace roof drain piping 100 ft.90 7th St S · 450 ft NE · PlumbingAug 3not listed
-
Upper level concrete framing repairs120 6th St S · 980 ft NE · Alteration or repairJul 29$100,000
-
(Dmh-pdox) demo and remodel to existing 10,681 S.F. office space800 Lasalle Ave · 800 ft W · Alteration or repairJul 29$650,000
-
Suite 219/Remove lav and install sink in a breakroom733 Marquette Ave · 340 ft SE · PlumbingJul 27not listed
-
Dishwasher #110050 6th St S · 850 ft N · PlumbingJul 23not listed
-
Suite 1400 -Install sink on existing rough in121 8th St S · 660 ft S · PlumbingJul 23not listed
-
Add exhaust duct and install grilles800 Lasalle Ave · 800 ft W · Mechanical (HVAC)Jul 20$1,100
-
Refrigeration system for walk-in cooler and freezer215 8th St S · 890 ft SE · Mechanical (HVAC)Jul 15not listed
-
Install 5 toilets, 4 lavs, 1 drinking fountain, 2 urinals800 Lasalle Ave · 800 ft W · PlumbingJul 6not listed
-
Relocate the existing low-pressure ductwork from the existing FVAV and VAVs50 6th St S · 850 ft N · Mechanical (HVAC)Jun 30$17,650
-
Suite 1900. Tenant improvement800 Lasalle Ave · 800 ft W · Alteration or repairJun 30$2,092,997
-
Replace exterior door from suite 100 to nicollet mall including panic hardware815 Nicollet Mall · 430 ft SW · Alteration or repairJun 30$5,000
-
Addition of a standpipe drain for fire suppression system800 Lasalle Ave · 800 ft W · PlumbingJun 17not listed
-
Replace existing electric water heater215 8th St S · 890 ft SE · PlumbingJun 17not listed
-
Run new waste, vent, and water for new break room sink with water heater50 6th St S · 850 ft N · PlumbingJun 17not listed
-
Provide & Install Plumbing for (2) Break Sinks800 Lasalle Ave · 800 ft W · PlumbingJun 17not listed
-
Demo pluming as needed90 7th St S · 450 ft NE · PlumbingJun 16not listed
-
Removing and reinstalling existing GRDs800 Nicollet Mall · 490 ft W · Mechanical (HVAC)Jun 16$2,000
-
Add Liebert unit to IT room, add return air transfer at unrated demising wall801 Nicollet Mall · 260 ft SW · Mechanical (HVAC)Jun 16$22,500
-
Install HVAC on Level 6520 Nicollet Mall · 980 ft N · Mechanical (HVAC)Jun 16$164,875
-
Refrigeration piping for new cooler and freezer800 Lasalle Ave #104 · 800 ft W · Mechanical (HVAC)Jun 16not listed
-
Level 25 elevator lobby remodel225 6th St S · 990 ft E · Alteration or repairJun 16$200,000
-
Replace 16 supply diffusers800 Nicollet Mall #240 · 490 ft W · Mechanical (HVAC)Jun 15$7,500
-
Add 1 new heat pump which serves room 1816 B but equipment is located in rm.1821800 Lasalle Ave · 800 ft W · Mechanical (HVAC)Jun 15$100,000
-
Relocate one fan powered VAV box with hot water piping225 6th St S · 990 ft E · Mechanical (HVAC)Jun 15$7,000
-
Rework ductwork, install new diffusers, install new 1 heat pump901 Marquette Ave · 790 ft S · Mechanical (HVAC)Jun 11$25,000
-
Suite 2500. Office remodel225 6th St S · 990 ft E · Alteration or repairJun 11$946,000
-
Office Remodel - Suite 1300 certificate of occupancy required: no special inspections required: no const…50 6th St S · 850 ft N · Alteration or repairJun 8$202,703
-
Upgrade AT&T communications equipment on rooftop45 8th St S · 620 ft W · Alteration or repairJun 8$25,000
-
Pull and replace 1 drinking fountain, 6 lavs, 2 urinals & 5 toilets225 6th St S · 990 ft E · PlumbingJun 5not listed
-
Remodel of levels 43,44,45,46 -ACW Revision - change door types at elevator lobby and misc other…90 7th St S · 450 ft NE · Alteration or repairJun 5$9,624,000
-
HVAC alterations include modifying the existing distribution system through the current air handling units225 6th St S · 990 ft E · Mechanical (HVAC)Jun 4$42,000
-
2 dishwashers, 2 kit sinks 4 coffee makers225 6th St S · 990 ft E · PlumbingJun 3not listed
-
Rough-in, provide, install: Sink Water line for coffee Water line for refrigerator 6 gallon water heater with…901 Marquette Ave · 790 ft S · PlumbingJun 2not listed
-
The plan sheet didn't show a motorized damper for new fan or curb insulation r value800 Lasalle Ave · 800 ft W · Mechanical (HVAC)Jun 2$4,000
-
Pull and replace 10 lavs/faucets - 12th floor800 Nicollet Mall · 490 ft W · PlumbingJun 1not listed
-
Tenant Remodel - Erberts & Gerberts occupancy: B 2020 MSBC sprinklered: yes architect: Robert Glueck #18390800 Lasalle Ave · 800 ft W · Alteration or repairMay 29$41,000
-
Tenant improvement at suite #W1750 -ACW certificate of occupancy required: no special inspections required…801 Nicollet Mall · 260 ft SW · Alteration or repairMay 28$53,150
-
Tenant Improvement -ACW certificate of occupancy required: no special inspections required: no const type…901 Marquette Ave · 790 ft S · Alteration or repairMay 27$191,738
-
Demo tenant space at Level 46 -ACW certificate of occupancy required: no special inspections required: no…225 6th St S · 990 ft E · Alteration or repairMay 26$250,000
-
Remodel restrooms and add restroom -ACW certificate of occupancy required: no special inspections required…800 Lasalle Ave · 800 ft W · Alteration or repairMay 22$175,000
-
Rough-in and fixtures All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing…520 Nicollet Mall · 980 ft N · PlumbingMay 22not listed
-
T/I FLOOR 18 const type: IA occupancy: B 2020 MSBC occupant load: 363 sprinklered: YES architect: 59613800 Lasalle Ave · 800 ft W · Alteration or repairMay 21$1,256,000
-
#3550 interior tenant finish60 6th St S · 770 ft NE · Alteration or repairMay 20$127,894
-
Plumbing for new tenant800 Lasalle Ave · 800 ft W · PlumbingMay 15not listed
-
Remove and cap plumbing as needed600 Nicollet Mall · 740 ft N · PlumbingMay 14not listed
-
Rework existing ductwork to accommodate new floor plan60 6th St S · 770 ft NE · Mechanical (HVAC)May 14$7,000
-
Demo only90 7th St S · 450 ft NE · Alteration or repairMay 11$55,000
-
Adjust existing duct system to accommodate new floor layout121 8th St S · 660 ft S · Mechanical (HVAC)May 8$18,900
-
Installation of additional fixtures90 7th St S · 450 ft NE · PlumbingMay 8not listed
-
Install Water with Beverage Backflow for Appliance60 6th St S · 770 ft NE · PlumbingMay 5not listed
-
Replace two existing fan coil unit like-for- like121 8th St S · 660 ft S · Mechanical (HVAC)May 5$17,990
-
Suite 825. Tenant remodel800 Lasalle Ave · 800 ft W · Alteration or repairMay 4$18,700
Within a quarter mile1,000 ft to ¼ mi · 25 permits
-
HVAC alterations using the existing distribution system through the current air handling unit100 5th St S · 0.23 mi NE · Mechanical (HVAC)Sep 30$13,150
-
Remove branch duct and cap existing branch duct take off on existing low-pressure duct from FPVAV 30-151000 Nicollet Mall · 0.23 mi SW · Mechanical (HVAC)Sep 17$6,150
-
This is not a building permit and does not allow any additional changes or improvements to the building or…824 Hennepin Ave · 0.24 mi W · Alteration or repairSep 8not listed
-
Per building official: expansion of the scope of existing permitbldg1130446 for re-anchoring travertine…200 6th St S · 0.23 mi E · Alteration or repairSep 4$5,054,642
-
Install flashing under parapet cap 2020 msbc89 10th St S · 0.22 mi SW · Alteration or repairAug 31$22,725
-
HVAC system, installing two new fan-powered boxes with hot water reheat coils1000 Nicollet Mall · 0.23 mi SW · Mechanical (HVAC)Aug 26$23,780
-
Buildout of 14th and 35th floors in the north tower200 6th St S · 0.23 mi E · PlumbingAug 26not listed
-
BLDG1196849 Install 2 new cooling only FCU's200 6th St S · 0.23 mi E · Mechanical (HVAC)Aug 26$412,200
-
Reroof -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC710 Hennepin Ave · 0.21 mi NW · RoofingAug 19$398,432
-
Remodel 3 offices on 30th floor1000 Nicollet Mall · 0.23 mi SW · Alteration or repairAug 18$89,000
-
Install (1) double drinking fountain with bottle feed920 2nd Ave S · 0.20 mi S · PlumbingAug 5not listed
-
Suite 2100. Entrance remodel100 5th St S · 0.23 mi NE · Alteration or repairAug 3$40,000
-
Tenant improvement in existing office spaces on 2 level -ACW certificate of occupancy required: no special…200 6th St S · 0.23 mi E · Alteration or repairJul 27$2,473,048
-
Rework existing ductwork and diffusers to accommodate new floor plan150 5th St S · 0.24 mi NE · Mechanical (HVAC)Jul 24$7,200
-
Rework existing ducts for suite expansion and tenant separation333 7th St S · 0.24 mi SE · Mechanical (HVAC)Jul 14$11,500
-
Rework existing ductwork (2 branch ducts),1 linear diffuser as well as several eggcrate to accommodate new…1000 Nicollet Mall · 0.23 mi SW · Mechanical (HVAC)Jul 7$6,750
-
Us bank plaza in wall piping only restrooms200 6th St S · 0.23 mi E · PlumbingJul 6not listed
-
19th floor office alterations1000 Nicollet Mall · 0.23 mi SW · Alteration or repairJul 2$120,000
-
Office expansion/remodel - Suite 3475 certificate of occupancy required: no special inspections required: no…150 5th St S · 0.24 mi NE · Alteration or repairJun 16$115,000
-
26Th floor. Ceo suite remodel1000 Nicollet Mall · 0.23 mi SW · Alteration or repairJun 15$240,000
-
Tenant interior remodel -ACW certificate of occupancy required: yes no mechanical plans required for…333 7th St S · 0.24 mi SE · Alteration or repairJun 11$159,637
-
Tenant interior remodel - Suite 3200 certificate of occupancy required: no special inspections required: no…222 9th St S · 0.19 mi SE · Alteration or repairJun 5$125,027
-
Removing (1) sink and replaceing with (1) new sink and reconnecting ice maker and dishwasher222 9th St S · 0.19 mi SE · PlumbingMay 26not listed
-
HVAC alterations reusing the existing distribution system through the current air handling unit100 5th St S · 0.23 mi NE · Mechanical (HVAC)May 19$168,256
-
Full white box demo of levels 14N and 35N -ACW certificate of occupancy required: no special inspections…200 6th St S · 0.23 mi E · Alteration or repairMay 19$174,760
Zoning requests nearbynot published by Minneapolis
We don't list zoning cases for Minneapolis yet. Look them up on the city's Zoning Board of Adjustment page.
More on this street8th St S · 10 nearest addresses with permits
- 45 8th St S newest permit Jun 8, 2026
- 121 8th St S newest permit Sep 30, 2026
- 24 8th St S newest permit Apr 10, 2026
- 215 8th St S newest permit Aug 21, 2026
- 501 8th St S newest permit Oct 8, 2025
- 730 8th St S newest permit Sep 8, 2026
- 900 8th St S newest permit Sep 16, 2025
- 1110 8th St S newest permit Jul 23, 2026
- 1130 8th St S newest permit Sep 25, 2026
- 1132 8th St S newest permit Feb 20, 2025
Minneapolis Construction Code Services updated its data Oct 13, 2026. We checked it Oct 14, 10:21 UTC. See the city's official records.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near