Skip map
Map preview
Open mapBack to list
- Searched address
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
133 Steuart St
San Francisco, CA 94105
The biggest project within a quarter mile since May 1: a $15M alteration or repair at 300 Howard St, permitted Sep 24.
28 permits on record here. The newest, Oct 25, 2024: To obtain final inspection fof work approved under pa@ 201809069307. Within a quarter mile, the city has issued 115 more permits since May 1.
Within
Since
Here28 permits · 133 Steuart St
-
To obtain final inspection fof work approved under pa@ 201809069307Alteration or repairOct 25, 2024not listed
-
(basement).iAlteration or repairSep 24, 2020$10,000
-
Jul 30, 2019$8,000
-
Basement: t.i for office, wine storageAlteration or repairMar 12, 2019$40,000
-
Street space & mta permitAlteration or repairJun 25, 2014not listed
-
Street spaceAlteration or repairNov 13, 2013not listed
-
Lower level: add 5 smoke detectorsAlteration or repairMar 27, 2013$25,000
-
Mar 25, 2013not listed
-
Demo extg piping at north side of bldg and repipe branch line in between joist for new ceiling installedAlteration or repairMar 22, 2013$50,000
-
Revision to pa# 2012/04/24/8997AdditionMar 19, 2013$10,000
-
Revision to appl #2012.0914.9762 - changes to concAlteration or repairFeb 19, 2013$15,000
-
Street spaceAlteration or repairDec 5, 2012not listed
-
Nov 6, 2012$30,000
-
Revision to pa# 2012-0119-2518-prepare trenches for plumbing work covered under pa# 2012-0119-2518Alteration or repairSep 20, 2012$15,000
-
Construction/remodel for new restaurant/bar in basementAlteration or repairMar 5, 2012$1,400,000
-
Nov 10, 2011$85,000
-
Interior demolition of nonbearing partitions & millworkAlteration or repairAug 9, 2011$12,000
-
Upgrade autoAlteration or repairAug 3, 2009$4,000
-
Renew pa#9818783 for final inspectionAlteration or repairJul 21, 1999not listed
-
Renew ap#9714977/9716216/9717519/9722973 & 4/9717194/9718775Alteration or repairSep 18, 1998not listed
-
Renew expired app #9706001, 9709784 9720022, 9719258Alteration or repairSep 18, 1998not listed
-
Dec 9, 1997$500
-
Horizontal additionAdditionDec 9, 1997$6,000
-
Install fire system in kitchen hoodAlteration or repairOct 8, 1997$1,800
-
Oct 3, 1997$80,000
-
Modify existing basement to comply w/current codesAlteration or repairSep 29, 1997$5,000
-
Remodel existing sprinkler systemAlteration or repairAug 7, 1997$4,500
-
Restaurant remodelAdditionJul 11, 1997$80,000
Sort
This block250 to 1,000 ft · 85 permits
-
Deffered M.E.P. for bpa#2026040790211 Market St · 810 ft NW · Alteration or repairSep 29$15,000
-
18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred55 Spear St · 570 ft W · Alteration or repairSep 24$37,488
-
12th floor- structural only permit to show anchorage of idf racks221 Main St · 950 ft S · Alteration or repairSep 23not listed
-
3/fl- mechanical modifications to improve cooling capabilities121 Spear St · 390 ft S · Alteration or repairSep 22$50,000
-
Demolition of 5th and 6th floor communicating stair to intermediary landing55 Spear St · 570 ft W · Alteration or repairSep 22$350,000
-
Mechanical: install (n) low-pressure duct and air distribution to meet new ti layout180 Howard St · 740 ft S · Alteration or repairSep 21$125,000
-
Mechanical-install new low pressure duct & air distribution to meet new layout180 Howard St · 740 ft S · Alteration or repairSep 21$150,000
-
10/fl- ti to include paint, finishes, and (n) phone booths55 Spear St · 570 ft W · Alteration or repairSep 21$150,000
-
9/fl- ti to include paint, finishes, and (n) phone booths55 Spear St · 570 ft W · Alteration or repairSep 21$200,000
-
8/fl- ti to include paint, finishes, and (n) phone booths55 Spear St · 570 ft W · Alteration or repairSep 21$200,000
-
Mech: replace duct work, transfer fan relocation201 Mission St · 950 ft SW · Alteration or repairSep 16$337,875
-
To obtain final inspection under pa#: 202405142070135 Main St · 730 ft SW · Alteration or repairSep 15not listed
-
12/f - suite 1200: install evacuation maps on 12th floor150 Spear St · 530 ft SW · Alteration or repairSep 15$2,500
-
New lobby level security improvements-installing turnstiles221 Main St · 950 ft S · Alteration or repairSep 11$250,000
-
Ref demo permit#: 202602055297201 Mission St · 950 ft SW · Alteration or repairSep 1$322,135
-
Level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room201 Spear St · 670 ft S · Alteration or repairSep 1$135,915
-
To obtain final inspection for work approved under pa# 202503031385135 Main St · 730 ft SW · Alteration or repairAug 26not listed
-
14/f suite 1400: selective interior demo and new construction of elements including but not limited to…201 Mission St · 950 ft SW · Alteration or repairAug 21$285,000
-
28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at…1 Market St · 810 ft NW · Alteration or repairAug 21$150,000
-
29th & 30th fl: revision to pa #2025-1215-17981 Market St · 810 ft NW · Alteration or repairAug 21not listed
-
L30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes55 Spear St · 570 ft W · Alteration or repairAug 13$715,000
-
9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the…180 Howard St · 740 ft S · Alteration or repairAug 12not listed
-
37th floor: interior non-structural demolition only55 Spear St · 570 ft W · Alteration or repairAug 11$91,700
-
12th floor: electrical under 202606032405150 Spear St · 530 ft SW · Alteration or repairAug 7$350,000
-
12th floor: hvac modifications under reference # 202606032405150 Spear St · 530 ft SW · Alteration or repairAug 7$300,000
-
28th fl - mechanical demo of mech systems: install 2 novo vav boxes55 Spear St · 570 ft W · Alteration or repairAug 6$15,000
-
Administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 00755 Spear St · 570 ft W · Alteration or repairAug 4not listed
-
New 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor201 Spear St · 670 ft S · Alteration or repairJul 31$38,000
-
Emergency evacuation map installation/inspection201 Mission St · 950 ft SW · Alteration or repairJul 29$5,000
-
New interconnected stair betweem 19 flr & 20 flr101 Mission St · 530 ft SW · Alteration or repairJul 28$450,000
-
19/f: mep submittal to support approved arch permit101 Mission St · 530 ft SW · Alteration or repairJul 27$684,000
-
2nd floor: anchoring of existing one person furniture phone booths180 Howard St · 740 ft S · Alteration or repairJul 24$10,000
-
1 & 2/fl- new interior ti partitions, doors, and interior glazing88 Spear St · 560 ft W · Alteration or repairJul 23$2,797,784
-
Install evacuation maps on floors 17 & 181 Market St · 810 ft NW · Alteration or repairJul 22$2,000
-
Four evacuation maps on 6th floor221 Main St · 950 ft S · Alteration or repairJul 17$1,500
-
28th floor: electrical-new power, lighting and signal55 Spear St · 570 ft W · Alteration or repairJul 15$27,000
-
14th fl - deferred mep to pa# 202605191493201 Spear St · 670 ft S · Alteration or repairJul 14$250,000
-
4/fl-deferred seismic anchoring for workout equipment for 202512192304121 Spear St · 390 ft S · Alteration or repairJul 13not listed
-
9th flr: deferred mep drawings180 Howard St · 740 ft S · Alteration or repairJul 13$250,000
-
To obtain final inspection for work approved under pa# 2024102436731 Market St · 810 ft NW · Alteration or repairJul 10not listed
-
29th floor: interior non-structural demolition on the 29th floor55 Spear St · 570 ft W · Alteration or repairJul 9$45,000
-
25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting1 Market St · 810 ft NW · Alteration or repairJul 8$150,000
-
6/f: interior t.i area of work is 3068 sq.ft partial floor remodel1 Market St · 810 ft NW · AdditionJul 8$3,000,000
-
Deferred electrical for 4th floor suite 400 office ti under permit 202604028757221 Main St · 950 ft S · Alteration or repairJul 7$175,000
-
Suite 400: reconfigure existing ductwork221 Main St · 950 ft S · Alteration or repairJul 7$75,000
-
4th flr mep deferred pa#: 202512192304121 Spear St · 390 ft S · Alteration or repairJul 7$266,400
-
Rev202409040025 and deffered mep: arch changes-operable partition in multipurpose rm and removal of planters…88 Spear St · 560 ft W · AdditionJul 7not listed
-
1st floor: convert 2449 sqft of retail space to office to provide tenant amenities201 Mission St · 950 ft SW · Alteration or repairJul 7$550,000
-
Unit 1202: install pre fabricated reach in pantry closet within space behind wall between bedroom and living…1 Steuart Ln · 530 ft SE · Alteration or repairJul 6$15,000
-
Level 31 ti new non structural partitions, mep, finishes55 Spear St · 570 ft W · Alteration or repairJul 2$8,250,000
-
17th fl structural for high density files55 Spear St · 570 ft W · Alteration or repairJun 30not listed
-
23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior…201 Mission St · 950 ft SW · Alteration or repairJun 30$56,543
-
Ste: 1200 - modification to (e) ti150 Spear St · 530 ft SW · Alteration or repairJun 23$1,500,000
-
18f t.i: demo done under permit55 Spear St · 570 ft W · Alteration or repairJun 18$3,279,000
-
14th fl. tenant improvement work with demo of non-load bearing walls201 Spear St · 670 ft S · Alteration or repairJun 18$45,000
-
Ste 770: 2 new phone booths in existing office221 Main St · 950 ft S · Alteration or repairJun 16$10,000
-
30th fl - ti (n) non-structural partitions, mep, finishes55 Spear St · 570 ft W · Alteration or repairJun 15$9,052,500
-
Demolition of structural deck between level 5 and 6221 Main St · 950 ft S · Alteration or repairJun 12$700,000
-
Spear street tower, 17th flr: T.I. selected demo of remaining soffite and partitions55 Spear St · 570 ft W · Alteration or repairJun 11$2,199
-
Ste 1200 interior demo only - tenant readiness221 Main St · 950 ft S · Alteration or repairJun 11$78,000
-
21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal…201 Mission St · 950 ft SW · Alteration or repairJun 10$127,465
-
21 fl - ste: 2150 - hvac relocate (e) difusers201 Mission St · 950 ft SW · Alteration or repairJun 10$60,000
-
19/fl- ti to include non structrual partitions101 Mission St · 530 ft SW · Alteration or repairJun 9$2,307,421
-
25/f: ref# 202604149378 - mech: demo all mech system55 Spear St · 570 ft W · Alteration or repairJun 5$50,000
-
22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes201 Mission St · 950 ft SW · Alteration or repairJun 4$190,288
-
17th and 18th floor160 Spear St · 560 ft SW · Alteration or repairJun 4$300,000
-
21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but…201 Mission St · 950 ft SW · Alteration or repairJun 3$218,435
-
Exterior building maintanence unit replacement of existing1 Market St · 810 ft NW · Alteration or repairJun 2$449,000
-
12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions180 Howard St · 740 ft S · Alteration or repairJun 1$750,000
-
10/fl- ti and selective soft demo and construction of non structural partitions180 Howard St · 740 ft S · Alteration or repairJun 1$750,000
-
Mechanical and electrical system for lobby renovation under 20260401866688 Howard St · 410 ft S · Alteration or repairJun 1not listed
-
Lobby renovation: interior improvement to the lobby of (e) residential building88 Howard St · 410 ft S · Alteration or repairJun 1$450,000
-
4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with…121 Spear St · 390 ft S · Alteration or repairMay 29$450,000
-
B14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24121 Spear St · 390 ft S · Alteration or repairMay 27$239,000
-
Ref#: 202602186115; ste14b: T.I. installation of an exhaust fan serviing the single user restroom121 Spear St · 390 ft S · Alteration or repairMay 27$245,000
-
10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures1 Market St · 810 ft NW · Alteration or repairMay 26$30,000
-
11th fl l- ref pa 202512151826 there is an existing 2-way communication system back bone installed in the…221 Main St · 950 ft S · Alteration or repairMay 21$9,000
-
10th fl l- ref pa 202512222392 there is an existing 2-way communication system back bone installed in the…221 Main St · 950 ft S · Alteration or repairMay 21$9,000
-
9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites180 Howard St · 740 ft S · Alteration or repairMay 20not listed
-
16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower)55 Spear St · 570 ft W · Alteration or repairMay 19$150,000
-
13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping201 Spear St · 670 ft S · Alteration or repairMay 19$20,000
-
36th fl - minor ti to accomodate a new focus room and trade desk space55 Spear St · 570 ft W · Alteration or repairMay 12$800,000
-
Unit# 40-d. remove dry-wall around wall hung toilets280 Spear St · 990 ft S · Alteration or repairMay 11$2,500
-
Remove and replace chw coil in rooftop unit and install new louvers180 Howard St · 740 ft S · Alteration or repairMay 8$598,634
-
Fl b7: interior renovation retail space w/ new non-structural partitions1 Market St · 810 ft NW · Alteration or repairMay 1$50,000
Within a quarter mile1,000 ft to ¼ mi · 30 permits
-
Provide 2025 cbc i010.2.12.1 compliance for a new tenant that is going to lock- elev300 Mission St · 0.23 mi SW · Alteration or repairSep 30$11,170
-
14/f: revision to pa#202607225388300 Mission St · 0.23 mi SW · Alteration or repairSep 24$50,000
-
7th & 8th floors: T.I. including new interior walls300 Howard St · 0.24 mi SW · Alteration or repairSep 24$15,451,442
-
Mechanical and electrical work for T.I. at suite 18251 California St · 0.25 mi W · Alteration or repairSep 23$82,000
-
14th - floor (5) evacuation maps300 Mission St · 0.23 mi SW · Alteration or repairSep 15$3,000
-
14th/f: structural upgrade to accommodate future T.I.300 Howard St · 0.24 mi SW · Alteration or repairSep 10$165,000
-
15th f/l: structural upgrades to accomodate future tenant buildout300 Howard St · 0.24 mi SW · Alteration or repairSep 10$165,000
-
Suite 200,300.400,500 &700:relocate phone booths to open office area8 California St · 0.23 mi W · Alteration or repairSep 9$10,000
-
31st floor: restroom upgrade consisting of demo and construction of non-structural partitions1 California St · 0.25 mi W · Alteration or repairSep 3$112,286
-
Ref permit#202512222450300 Mission St · 0.23 mi SW · Alteration or repairSep 2$70,000
-
#1850: mechanical and electrical work to tenant improvement ref 2026052618891 California St · 0.25 mi W · Alteration or repairAug 24$60,000
-
16th fl: structural upgrades to accommodate future tenant buildout300 Howard St · 0.24 mi SW · Alteration or repairAug 24$165,000
-
30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions1 California St · 0.25 mi W · Alteration or repairAug 18$139,810
-
14th floor: electrical for pa #202605201633 project300 Mission St · 0.23 mi SW · Alteration or repairAug 14$573,000
-
6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and…300 Mission St · 0.23 mi SW · Alteration or repairAug 11not listed
-
Barrier removal300 Howard St · 0.24 mi SW · Alteration or repairAug 11$10,000
-
2 : structural upgrades to accommodate future tenant buildout300 Howard St · 0.24 mi SW · Alteration or repairAug 10$200,000
-
22nd floor: restroom upgrade consisting of demo and construction of selective fixtures1 California St · 0.25 mi W · Alteration or repairJul 31$15,870
-
Basemen restroom exhaust air fan upgrade300 Mission St · 0.23 mi SW · Alteration or repairJul 30$80,000
-
Project is commercial T.I.for non-profit childcare facility ages 0-5 w/in (e) residential building245 East Clementina St · 0.24 mi S · Alteration or repairJul 29$1,821,294
-
9/f: structural upgrades to accommodate future tenant buildout300 Howard St · 0.24 mi SW · Alteration or repairJul 27$135,000
-
18th floor: #1825: interior tenant improvement1 California St · 0.25 mi W · Alteration or repairJul 22$370,336
-
18/f -interior tenetn improvement1 California St · 0.25 mi W · Alteration or repairJul 22$392,975
-
14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout300 Mission St · 0.23 mi SW · Alteration or repairJul 20$513,000
-
31st fl - demo only of non-structural partitions1 California St · 0.25 mi W · Alteration or repairJul 14$127,035
-
22/fl- ref 202604229900- mep work1 California St · 0.25 mi W · Alteration or repairJul 7$750,000
-
6/fl- relocate (e) phone booths to open office area8 California St · 0.23 mi W · Alteration or repairJun 15$100,000
-
Bathtub to shower conversion285 Main St · 0.23 mi S · Alteration or repairJun 10$4,500
-
14 fl: interior tenant improvement which includes multi-use men and women restrooms300 Mission St · 0.23 mi SW · Alteration or repairJun 10$2,000,000
-
22/fl-ref 202603318610- ti to (e) office space including non structual demo1 California St · 0.25 mi W · Alteration or repairMay 6$1,500,000
SF Department of Building Inspection updated its data Oct 2, 2026. We checked it Oct 5, 13:33 UTC. Official data.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near