Nearby Permits
Map of 122 permits within a quarter mile of 26 Hall StPlumbing, 12 Lesley Ave, Oct 7, 2026Plumbing, 12 Lesley Ave, Oct 7, 2026Roofing, 34 Willow Ave, Oct 6, 2026Plumbing, 96 Willow Ave, Oct 5, 2026Alteration or repair, 15 Hall St, Oct 5, 2026Electrical, 74 Cedar St, Oct 2, 2026Plumbing, 61 Hancock St, Oct 1, 2026Plumbing, 21 Cedar St, Oct 1, 2026Plumbing, 51 Willow Ave, Oct 1, 2026Plumbing, 21 Cedar St, Oct 1, 2026Electrical, 9 Fairlee St, Oct 1, 2026Electrical, 328 Highland Ave, Sep 28, 2026Mechanical (HVAC), 59 Elm St, Sep 25, 2026Plumbing, 78 Cedar St, Sep 25, 2026Alteration or repair, 35 Spencer Ave, Sep 24, 2026Alteration or repair, 53 Cherry St, Sep 23, 2026Electrical, 21 Lexington Ave, Sep 22, 2026Electrical, 19 Alpine St, Sep 21, 2026Other, 42 Banks St, Sep 21, 2026Electrical, 66 Morrison Ave, Sep 17, 2026Plumbing, 103 Willow Ave, Sep 15, 2026Plumbing, 103 Willow Ave, Sep 15, 2026Addition, 42 Morrison Ave, Sep 15, 2026Electrical, 36 Cherry St, Sep 14, 2026Alteration or repair, 3 Mountain Ave, Sep 11, 2026Plumbing, 66 Morrison Ave, Sep 10, 2026Alteration or repair, 18 Charnwood Rd, Sep 9, 2026Alteration or repair, 74 Cedar St, Sep 8, 2026Other, 318 Summer St, Sep 8, 2026Electrical, 44 Hancock St, Sep 2, 2026Alteration or repair, 70 Porter St, Sep 2, 2026Fence, wall or deck, 61 Elm St, Sep 1, 2026Plumbing, 15 Willow Ave, Aug 31, 2026Electrical, 21 Cedar St, Aug 27, 2026Mechanical (HVAC), 18 Hancock St, Aug 25, 2026Alteration or repair, 243 Summer St, Aug 25, 2026Mechanical (HVAC), 75 Cedar St, Aug 24, 2026Alteration or repair, 48 Spencer Ave, Aug 19, 2026Alteration or repair, 66 Morrison Ave, Aug 19, 2026Roofing, 6 Henry Ave, Aug 19, 2026Mechanical (HVAC), 331 Summer St, Aug 19, 2026Electrical, 50 Spencer Ave, Aug 17, 2026Addition, 73 Cherry St, Aug 14, 2026Electrical, 118 Cedar St, Aug 7, 2026Electrical, 76 Lexington Ave, Aug 7, 2026Electrical, 331 Summer St, Aug 5, 2026Alteration or repair, 96 Willow Ave, Aug 5, 2026Alteration or repair, 7 Ashland St, Aug 5, 2026Alteration or repair, 318 Summer St, Aug 5, 2026Plumbing, 48 Banks St, Aug 4, 2026Plumbing, 48 Banks St, Aug 4, 2026Electrical, 18 Hancock St, Aug 3, 2026Electrical, 15 Willow Ave, Aug 3, 2026Electrical, 241 Summer St, Aug 3, 2026Alteration or repair, 114 Cedar St, Aug 3, 2026Alteration or repair, 297 Summer St, Aug 3, 2026Sign, 2 Alpine St, Jul 31, 2026Plumbing, 152 Albion St, Jul 30, 2026Alteration or repair, 266 Summer St, Jul 29, 2026Electrical, 73 Cherry St, Jul 28, 2026Electrical, 75 Cedar St, Jul 27, 2026Solar, 114 Cedar St, Jul 24, 2026Electrical, 156 Albion St, Jul 23, 2026Electrical, 354 Highland Ave, Jul 21, 2026Alteration or repair, 96 Cedar St, Jul 21, 2026Alteration or repair, 57 Cherry St, Jul 21, 2026Electrical, 298 Summer St, Jul 20, 2026Alteration or repair, 297 Summer St, Jul 20, 2026Other, 285 Highland Ave, Jul 16, 2026Mechanical (HVAC), 3 Fairlee St, Jul 14, 2026Plumbing, 48 Banks St, Jul 9, 2026Plumbing, 48 Banks St, Jul 9, 2026Electrical, 114 Cedar St, Jul 9, 2026Demolition, 44 White St, Jul 9, 2026Electrical, 57 Cherry St, Jul 8, 2026Roofing, 10 Burnside Ave, Jul 8, 2026Plumbing, 354 Highland Ave, Jul 7, 2026Plumbing, 22 Charnwood Rd, Jul 6, 2026Plumbing, 9 Charnwood Rd, Jul 2, 2026Plumbing, 9 Charnwood Rd, Jul 2, 2026Electrical, 315 Highland Ave, Jul 2, 2026Electrical, 29a Windsor Rd, Jul 2, 2026Electrical, 102 Hancock St, Jul 1, 2026Electrical, 47 Burnside Ave, Jun 30, 2026Alteration or repair, 118 Cedar St, Jun 29, 2026Alteration or repair, 21 Lexington Ave, Jun 28, 2026Plumbing, 147 Albion St, Jun 26, 2026Plumbing, 9 Gilson Terr, Jun 23, 2026Plumbing, 19 Burnside Ave, Jun 23, 2026Electrical, 75 Elm St, Jun 23, 2026Plumbing, 103 Willow Ave, Jun 18, 2026Alteration or repair, 103 Willow Ave, Jun 18, 2026Alteration or repair, 89 Lexington Ave, Jun 16, 2026Roofing, 106 Hancock St, Jun 16, 2026Alteration or repair, 79 Hancock St, Jun 16, 2026Roofing, 164 Hudson St, Jun 10, 2026Electrical, 103 Willow Ave, Jun 9, 2026Electrical, 19 Hall St, Jun 9, 2026Alteration or repair, 271 Highland Ave, Jun 9, 2026Electrical, 5 Lexington Ave, Jun 8, 2026Plumbing, 40 Willow Ave, Jun 5, 2026Electrical, 299 Summer St, Jun 4, 2026Electrical, 44 White St, Jun 4, 2026Plumbing, 11 Mountain Ave, Jun 3, 2026Plumbing, 11 Mountain Ave, Jun 3, 2026Alteration or repair, 12 Francis St, Jun 1, 2026Alteration or repair, 289 Highland Ave, May 27, 2026Alteration or repair, 354 Highland Ave, May 26, 2026Plumbing, 241 Summer St, May 22, 2026Plumbing, 241 Summer St, May 22, 2026Alteration or repair, 36 Cherry St, May 21, 2026Electrical, 35 Cedar St, May 19, 2026Electrical, 33 Cedar St, May 19, 2026Alteration or repair, 11 Henry Ave, May 18, 2026Alteration or repair, 169 Albion St, May 18, 2026Electrical, 8 Porter Ave, May 14, 2026Alteration or repair, 11 Burnside Ave, May 14, 2026Alteration or repair, 5-7 Henry Ave, May 14, 2026Alteration or repair, 74 Elm St, May 7, 2026Electrical, 83 Cedar St, May 6, 2026New building, 35 Cedar St, Jul 29, 2026New building, 44 White St, Jul 27, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

26 Hall St

Somerville, MA 02144

44 White St: demolition permitted Jul 9, a new building Jul 27.

One permit here in the last two years. The newest, Jul 14, 2025: Re roof top main roof. Within a quarter mile, the city has issued 122 more permits (114 projects) since May 1. Two are for new buildings, the nearest 850 ft away.

The city's data portal didn't answer in time. "Here" shows our copy of the last two years, which we checked 2026-10-08 10:31 UTC. Data status

MayJunJulAugSepOct
Here1 permit · 26 Hall St
  1. Re roof top main roof
    Alteration or repair
    Jul 14, 2025$22,260
Next doorunder 250 ft · 5 permits
  1. Oct 5$3,600
  2. Expletory demolition of walls, ceilings
    53 Cherry St · 160 ft N · Alteration or repair
    Sep 23$25,000
  3. Jul 21$625,000
  4. Wiring 3 family
    57 Cherry St · 200 ft N · Electrical
    Jul 8$25,000
  5. Add electric car charger
    19 Hall St · 130 ft E · Electrical
    Jun 9$400
This block250 to 1,000 ft · 75 permits in 68 projects · 1 new building, $621,000
  1. Tankless water heater installation × 2 permits
    12 Lesley Ave · 970 ft N · Plumbing
    Oct 7not listed
  2. Oct 2$3,100
  3. Oct 1not listed
  4. Relocate 2 gas stoves
    51 Willow Ave · 970 ft NW · Plumbing
    Oct 1not listed
  5. Oct 1$800
  6. Sep 28$4,357
  7. Sep 25not listed
  8. Sep 24$10,660
  9. Sep 22$1,000
  10. Sep 21$5,884
  11. Sep 14$35,203
  12. Sep 11$12,300
  13. Sep 9$26,000
  14. Sep 8$43,500
  15. Backyard block wall
    318 Summer St · 910 ft NW · Other
    Sep 8$9,137
  16. Sep 2$1,200
  17. Aug 25$40,000
  18. Residential weatherization/air sealing
    243 Summer St · 840 ft SE · Alteration or repair
    Aug 25$17,000
  19. Aug 24$20,490
  20. Install 8 replacement windows
    48 Spencer Ave · 700 ft N · Alteration or repair
    Aug 19$8,715
  21. Aug 17$8,500
  22. Aug 14$60,750
  23. Deck light and outlet
    118 Cedar St · 710 ft NE · Electrical
    Aug 7$1,000
  24. I.E Install 38 double hung windows
    7 Ashland St · 360 ft S · Alteration or repair
    Aug 5$62,476
  25. Rebuilding back yard decks for 2 units
    318 Summer St · 910 ft NW · Alteration or repair
    Aug 5$47,590
  26. Water heater replacement × 4 permits
    48 Banks St · 860 ft W · Plumbing
    Jul 9 to Aug 4not listed
  27. Install 2 3 tons mini Split
    18 Hancock St · 760 ft SW · Electrical
    Aug 3$1,800
  28. Aug 3$1,500
  29. Residential weatherization/air sealing
    114 Cedar St · 680 ft NE · Alteration or repair
    Aug 3$21,971
  30. Residential weatherization/air sealing × 2 permits
    297 Summer St · 520 ft NW · Alteration or repair
    Jul 20 to Aug 3$18,000
  31. Replace front stairs and landing
    266 Summer St · 380 ft S · Alteration or repair
    Jul 29$11,850
  32. Jul 29$621,000
  33. Jul 28$28,340
  34. Jul 27$4,000
  35. Jul 24$44,000
  36. Jul 21$52,411
  37. Jul 20$16,000
  38. New rubber roof
    285 Highland Ave · 630 ft NE · Other
    Jul 16$15,500
  39. Jul 14$25,000
  40. Jul 9$34,329
  41. Roof replacement
    10 Burnside Ave · 940 ft W · Roofing
    Jul 8$30,000
  42. Finish plumbing
    22 Charnwood Rd · 750 ft NW · Plumbing
    Jul 6not listed
  43. Jul 2not listed
  44. Jul 2not listed
  45. Jul 2$3,500
  46. Jul 2$1,600
  47. Jul 1$8,000
  48. Jun 30$10,000
  49. Teardown and rebuild two story front porch
    118 Cedar St · 710 ft NE · Alteration or repair
    Jun 29$45,000
  50. Install 24 replacement windows
    21 Lexington Ave · 970 ft NE · Alteration or repair
    Jun 28$54,435
  51. Jun 23not listed
  52. Jun 23$35,000
  53. Jun 16$28,999
  54. Jun 16$2,000
  55. Strip and re-roof
    164 Hudson St · 880 ft E · Roofing
    Jun 10$15,750
  56. Residential weatherization/air sealing
    271 Highland Ave · 850 ft E · Alteration or repair
    Jun 9$4,000
  57. Rear Decks
    299 Summer St · 560 ft NW · Electrical
    Jun 4$720
  58. Replace water heater × 2 permits
    11 Mountain Ave · 850 ft SE · Plumbing
    Jun 3not listed
  59. Jun 1$18,720
  60. May 27$80,000
  61. Replace boiler × 2 permits
    241 Summer St · 870 ft SE · Plumbing
    May 22not listed
  62. May 21$7,937
  63. Ufer ground
    35 Cedar St · 850 ft S · Electrical
    May 19$1,000
  64. Ufer Ground
    33 Cedar St · 890 ft S · Electrical
    May 19$1,000
  65. May 14$2,600
  66. May 14$7,000
  67. Install new storm door and hardware
    5-7 Henry Ave · 990 ft NW · Alteration or repair
    May 14$1,762
  68. May 6$1,200
Within a quarter mile1,000 ft to ¼ mi · 42 permits in 41 projects · 1 new building, $68,814
  1. Oct 6$27,300
  2. Oct 5not listed
  3. Oct 1not listed
  4. Oct 1not listed
  5. Installation of replacement furnace
    59 Elm St · 0.23 mi S · Mechanical (HVAC)
    Sep 25$9,685
  6. Sep 21$2,500
  7. Wire New Hot Water Heater
    66 Morrison Ave · 0.24 mi N · Electrical
    Sep 17$1,000
  8. Replace Water Heater × 2 permits
    103 Willow Ave · 0.22 mi NW · Plumbing
    Sep 15not listed
  9. Sep 15$3,599
  10. Sep 10not listed
  11. Ductless mini split install
    70 Porter St · 0.20 mi SE · Alteration or repair
    Sep 2$49,021
  12. Sep 1$46,000
  13. Aug 31not listed
  14. Aug 27$500
  15. Aug 19$4,399
  16. Aug 19$20,962
  17. Aug 19$16,003
  18. Aug 7$516
  19. Aug 5$4,000
  20. Aug 5$45,860
  21. Aug 3$6,200
  22. Jul 31not listed
  23. Gas boiler replacement
    152 Albion St · 0.22 mi E · Plumbing
    Jul 30not listed
  24. Jul 27$68,814
  25. Cottage Fire alarm
    156 Albion St · 0.21 mi E · Electrical
    Jul 23$2,500
  26. Jul 21$3,000
  27. Jul 9$35,000
  28. Jul 7not listed
  29. Gas test
    147 Albion St · 0.24 mi E · Plumbing
    Jun 26not listed
  30. Jun 23not listed
  31. Jun 18not listed
  32. Jun 18$30,000
  33. Remove/replace 10 existing windows
    89 Lexington Ave · 0.23 mi N · Alteration or repair
    Jun 16$12,972
  34. Jun 9$3,000
  35. Jun 8$7,000
  36. Jun 5not listed
  37. Jun 4$200
  38. Add a 3rd floor bathroom with a Dormer
    354 Highland Ave · 0.24 mi NW · Alteration or repair
    May 26$97,792
  39. Mass Save Insulation & Air Sealing
    11 Henry Ave · 0.19 mi N · Alteration or repair
    May 18$8,777
  40. May 18$3,426
  41. May 7$10,241
More on this streetHall St · 5 other addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Somerville Inspectional Services Division updated its data Oct 8, 2026. We checked it Oct 8, 10:31 UTC. See the city's official records (SomerStat, City of Somerville, ODbL 1.0).

Contains information from Applications for Permits and Licenses (SomerStat, City of Somerville), which is made available here under the Open Database License (ODbL).

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near