Nearby Permits
Map of 115 permits within a quarter mile of 12 Linden StAlteration or repair, 415 W Fourth St, Oct 1, 2026Plumbing, 506 E Fourth St, Sep 30, 2026Plumbing, 342 W Third St, Sep 29, 2026Plumbing, 21 Thomas Pk, Sep 25, 2026Alteration or repair, 13 Gates St, Sep 25, 2026Roofing, 353-361 Athens St, Sep 24, 2026Alteration or repair, 284 Bowen St, Sep 24, 2026Plumbing, 26 Telegraph St, Sep 24, 2026Plumbing, 368 E Eighth St, Sep 24, 2026Alteration or repair, 75 Old Harbor St, Sep 24, 2026Plumbing, 509-511 E Second St, Sep 23, 2026Alteration or repair, 9 Gates St, Sep 22, 2026Alteration or repair, 106 H St, Sep 22, 2026Alteration or repair, 13 Gates St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Alteration or repair, 541 E Fourth St, Sep 17, 2026Roofing, 6 G St, Sep 17, 2026Alteration or repair, 303 Bolton St, Sep 16, 2026Roofing, 409 W Fourth St, Sep 16, 2026Alteration or repair, 106 H St, Sep 10, 2026Electrical, 541 E Fourth St, Sep 10, 2026Alteration or repair, 449 E Fifth St, Sep 10, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Electrical, 2 G St, Sep 8, 2026Other, 53 Thomas Pk, Sep 4, 2026Alteration or repair, 2 G St, Aug 31, 2026Fence, wall or deck, 291 W Fifth St, Aug 31, 2026Roofing, 277 Silver St, Aug 28, 2026Alteration or repair, 507 E Fifth St, Aug 28, 2026Alteration or repair, 78 H St, Aug 27, 2026Alteration or repair, 13 Gates St, Aug 27, 2026Addition, 421 E Sixth St, Aug 27, 2026Alteration or repair, 26 Telegraph St, Aug 25, 2026Electrical, 288 Bowen St, Aug 24, 2026Addition, 63 Telegraph St, Aug 24, 2026Alteration or repair, 32a-32 Mercer St, Aug 19, 2026Roofing, 498 E Sixth St, Aug 17, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 148-150 F St, Aug 13, 2026Alteration or repair, 75-77 Dorchester St, Aug 13, 2026Alteration or repair, 63 Telegraph St, Aug 7, 2026Electrical, 8 Atlantic St, Aug 5, 2026Electrical, 432-434 E Sixth St, Aug 4, 2026Plumbing, 58 Thomas Pk, Jul 31, 2026Electrical, 430 E Eighth St, Jul 31, 2026Alteration or repair, 503 E Fifth St, Jul 30, 2026Alteration or repair, 8 Atlantic St, Jul 30, 2026Alteration or repair, 61 Story St, Jul 30, 2026Plumbing, 58 Thomas Pk, Jul 29, 2026Alteration or repair, 32a-32 Mercer St, Jul 28, 2026Alteration or repair, 104 Old Harbor St, Jul 28, 2026Alteration or repair, 32a-32 Mercer St, Jul 27, 2026Roofing, 460 E Eighth St, Jul 27, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 30 Mercer St, Jul 17, 2026Alteration or repair, 432-434 E Sixth St, Jul 16, 2026Roofing, 19 Mercer St, Jul 15, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 470 E Sixth St, Jul 14, 2026Electrical, 449 E Fifth St, Jul 13, 2026Electrical, 59 Gates St, Jul 9, 2026Alteration or repair, 21 Atlantic St, Jul 8, 2026Plumbing, 21 Atlantic St, Jul 8, 2026Plumbing, 34 Emerson St, Jul 7, 2026Plumbing, 260-262 Gold St, Jul 6, 2026Alteration or repair, 458-460 E Sixth St, Jun 26, 2026Plumbing, 59 Gates St, Jun 26, 2026Alteration or repair, 21 Thomas Pk, Jun 24, 2026Alteration or repair, 462 E Seventh St, Jun 23, 2026Plumbing, 477 E Fourth St, Jun 23, 2026Electrical, 477 E Fourth St, Jun 22, 2026Alteration or repair, 112 H St, Jun 22, 2026Alteration or repair, 43 Telegraph St, Jun 22, 2026Alteration or repair, 75 Old Harbor St, Jun 17, 2026Alteration or repair, 509r E Fifth St, Jun 16, 2026Alteration or repair, 380-380h E Eighth St, Jun 15, 2026Alteration or repair, 403 W Fourth St, Jun 9, 2026Demolition, 75-77 Dorchester St, Jun 9, 2026Alteration or repair, 43 Telegraph St, Jun 8, 2026Alteration or repair, 59 Gates St, Jun 5, 2026Alteration or repair, 26 Telegraph St, Jun 5, 2026Roofing, 70 G St, Jun 4, 2026Alteration or repair, 455 E Seventh St, Jun 4, 2026Alteration or repair, 5 Colebrook St, Jun 3, 2026Alteration or repair, 194 Dorchester St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Electrical, 260-262 Gold St, Jun 1, 2026Electrical, 187 Dorchester St, Jun 1, 2026Mechanical (HVAC), 9 Gates St, May 28, 2026Plumbing, 454-456 E Sixth St, May 28, 2026Plumbing, 187 Dorchester St, May 28, 2026Electrical, 11 Dorchester St, May 27, 2026Electrical, 26 Telegraph St, May 27, 2026Plumbing, 27 G St, May 26, 2026Alteration or repair, 416 E Seventh St, May 22, 2026Plumbing, 72 G St, May 22, 2026Electrical, 66-68 Gates St, May 21, 2026Roofing, 69 Old Harbor St, May 18, 2026Plumbing, 449 E Fifth St, May 12, 2026Plumbing, 449 E Fifth St, May 12, 2026Alteration or repair, 25 Colebrook St, May 8, 2026Plumbing, 260-262 Gold St, May 6, 2026Plumbing, 260-262 Gold St, May 5, 2026Alteration or repair, 70 G St, May 4, 2026Alteration or repair, 260-262 Gold St, May 4, 2026Alteration or repair, 469 E Sixth St, May 1, 2026Plumbing, 469 E Sixth St, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

12 Linden St

Boston, MA 02127

The biggest project within a quarter mile since May 1: an $8.4M alteration or repair at 75-77 Dorchester St, permitted Aug 13.

12 permits on record here. The newest, Jun 26, 2025: We are reinstalling 13 panels. Within a quarter mile, the city has issued 115 more permits (112 projects) since May 1.

MayJunJulAugSepOct
Here12 permits · 12 Linden St
  1. Jun 26, 2025$2,340
  2. Jan 31, 2025$5,706
  3. Sep 29, 2023$1,895
  4. Feb 3, 2022$1,600
  5. Jan 24, 2022$10,000
  6. Jan 25, 2021$10,000
  7. Jan 6, 2016$7,174
  8. Nov 10, 2015$2,242
  9. Jun 16, 2015$1,000
  10. Apr 24, 2015$7,641
  11. Feb 13, 2015$17,000
  12. Jan 16, 2014$7,500
Next doorunder 250 ft · 5 permits
  1. Sep 30$500
  2. Jun 23$1,000
  3. 2 counter outlets
    477 E Fourth St · 240 ft NW · Electrical
    Jun 22$400
  4. Water heater @ 45
    43 G St · 230 ft NE · Plumbing
    Jun 1$650
  5. Water heater replacement @ 45
    43 G St · 230 ft NE · Plumbing
    Jun 1$650
This block250 to 1,000 ft · 62 permits in 60 projects
  1. Sep 29$8,000
  2. Remodeling
    21 Thomas Pk · 300 ft SW · Plumbing
    Sep 25$4,000
  3. Gut renovation of existing building
    13 Gates St · 920 ft W · Alteration or repair
    Sep 25$625,000
  4. Insulation &
    284 Bowen St · 960 ft W · Alteration or repair
    Sep 24$3,887
  5. Amendment to ALT1856561
    75 Old Harbor St · 960 ft SW · Alteration or repair
    Sep 24$85,902
  6. Sep 22$9,500
  7. Sep 18$2,000
  8. Sep 17$57,000
  9. Sep 17$19,000
  10. Gut remodel bathroom - existing layout
    303 Bolton St · 940 ft N · Alteration or repair
    Sep 16$27,000
  11. Sep 10$5,100
  12. Confirm living space in basement
    449 E Fifth St · 730 ft E · Alteration or repair
    Sep 10$15,000
  13. Sep 8$1,200
  14. Sep 4$7,500
  15. 5 double hung replacement windows
    2 G St · 810 ft N · Alteration or repair
    Aug 31$7,800
  16. Remove and replace 1 window
    291 W Fifth St · 890 ft W · Fence, wall or deck
    Aug 31$10,612
  17. Aug 27not listed
  18. Aug 27not listed
  19. Aug 24$2,500
  20. Aug 24$153,400
  21. Aug 14$5,500
  22. Install new gastove
    432-434 E Sixth St · 660 ft SE · Plumbing
    Aug 14$750
  23. Aug 13$8,406,316
  24. Aug 7$5,000
  25. Aug 5$1,400
  26. Aug 4$18,000
  27. Jul 31$500
  28. Building a Partition Wall with Misc
    8 Atlantic St · 270 ft W · Alteration or repair
    Jul 30$35,555
  29. Jul 30$12,000
  30. Jul 29$8,000
  31. Jul 22$2,500
  32. Jul 16$169,848
  33. Installing Bryant 24K BTU Outdoor Unit × 2 permits
    4 Jason Te · 940 ft S · Electrical
    Jul 14$26,922
  34. Jul 14$1,000
  35. Jul 13$20,000
  36. Jul 8$16,121
  37. Jul 8$4,959
  38. Jul 6$2,500
  39. Replace deck beam and hardware
    458-460 E Sixth St · 870 ft SE · Alteration or repair
    Jun 26$11,946
  40. Jun 24$77,430
  41. Jun 23$10,000
  42. Jun 17$85,902
  43. Jun 9$50,000
  44. Strip and reroof
    70 G St · 350 ft SE · Roofing
    Jun 4$8,900
  45. Jun 1$30,000
  46. May 28$42,427
  47. May 28$9,500
  48. May 26$1,800
  49. May 22$5,500
  50. May 22$60,000
  51. May 18$50,000
  52. May 12$12,000
  53. May 12$4,000
  54. May 8$300,000
  55. Disconnect stove
    260-262 Gold St · 970 ft NW · Plumbing
    May 6not listed
  56. May 5$5,000
  57. May 4$15,012
  58. Light renovation of interior of unit 301
    260-262 Gold St · 970 ft NW · Alteration or repair
    May 4$500,000
  59. May 1$17,640
  60. May 1$2,500
Within a quarter mile1,000 ft to ¼ mi · 48 permits in 47 projects
  1. Oct 1$39,000
  2. Sep 24$14,123
  3. Sep 24$15,400
  4. Shower pan
    368 E Eighth St · 0.20 mi S · Plumbing
    Sep 24$3,000
  5. Sep 23$2,500
  6. Clarify Occupancy as a Single Family Residence
    106 H St · 0.19 mi E · Alteration or repair
    Sep 22not listed
  7. Sep 18$1,500
  8. Sep 18$1,500
  9. Gas Boiler
    430 E Eighth St · 0.20 mi S · Plumbing
    Sep 18$1,000
  10. Sep 16$11,025
  11. Sep 10$15,000
  12. Sep 8$18,500
  13. 2 HVAC, 2 stove
    32a-32 Mercer St · 0.22 mi SW · Plumbing
    Sep 8$4,000
  14. Aug 28$12,000
  15. Aug 28not listed
  16. Aug 27$4,000
  17. Aug 25$105,950
  18. Aug 19$450,000
  19. Aug 17$10,000
  20. Aug 13$1,895
  21. Jul 31$5,000
  22. Jul 30$9,500
  23. Confirm occupancy of existing 2 family.
    32a-32 Mercer St · 0.22 mi SW · Alteration or repair
    Jul 28not listed
  24. Jul 28$300,000
  25. Jul 27$32,000
  26. Strip and re-roof
    460 E Eighth St · 0.22 mi SE · Roofing
    Jul 27$18,500
  27. Emergency permit
    30 Mercer St · 0.22 mi SW · Plumbing
    Jul 17$9,500
  28. Jul 15$46,100
  29. Install mini-split
    59 Gates St · 0.23 mi SW · Electrical
    Jul 9$10,000
  30. Gas furnace replacement
    34 Emerson St · 0.21 mi NE · Plumbing
    Jul 7$10,000
  31. Kitchen and laundry remodel
    59 Gates St · 0.23 mi SW · Plumbing
    Jun 26$4,500
  32. Confirm occupancy of existing 3 family
    112 H St · 0.19 mi E · Alteration or repair
    Jun 22not listed
  33. Jun 22$13,000
  34. Jun 16$110,000
  35. Jun 15$150,000
  36. Jun 9$20,250
  37. Jun 8$44,988
  38. Remodel kitchen
    59 Gates St · 0.23 mi SW · Alteration or repair
    Jun 5$27,000
  39. Insulate walls
    26 Telegraph St · 0.25 mi W · Alteration or repair
    Jun 5$4,166
  40. Replaced the siding, Lap Cement siding
    455 E Seventh St · 0.22 mi SE · Alteration or repair
    Jun 4$15,000
  41. Back deck replacement
    5 Colebrook St · 0.20 mi SE · Alteration or repair
    Jun 3$100,000
  42. Replacement of (1) Patio Sliding Door
    194 Dorchester St · 0.24 mi W · Alteration or repair
    Jun 1$10,413
  43. Bathroom reno
    187 Dorchester St · 0.23 mi W · Electrical
    Jun 1$1,500
  44. May 28$3,000
  45. May 27$6,850
  46. May 27$12,000
  47. May 21$900

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 11:45 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near