6-6b Beacon St
Boston, MA 02108
- At this address
- 131 permits on record. Newest issued Sep 16: Masonry facade repairs, stone patching
- Within ¼ mile
- 280 more permits (275 projects) issued since May 1.
- Biggest nearby
- A $3.7M alteration or repair at 1 Beacon St, permitted Aug 10, within ¼ mile since May 1.
Within
Since
Here131 permits · 6-6b Beacon St
-
Masonry facade repairs, stone patchingAlteration or repairSep 16$381,894
-
Redo Drain in 3 bay sinkPlumbingAug 27$1,000
-
Fire escape repairsAlteration or repairJul 27$16,500
-
Jul 23$12,000
-
Generator support workElectricalApr 6$25,000
-
Jan 16$48,000
-
Install new glass in existing office fronts offices and one conference room frontAlteration or repairAug 11, 2025$65,000
-
Suite 200. Install new officesAlteration or repairAug 27, 2024$150,000
-
RICKTEL Communications, IncElectricalAug 6, 2024$5,000
-
Alterations to an existing suiteFire systemsJul 17, 2024$2,500
-
Renovations to an existing suiteElectricalJul 17, 2024$15,000
-
Wiring in of a portable generatorElectricalJul 17, 2024$5,000
-
Application for SF permit to start framing while waiting for ALT 1606120Alteration or repairJun 13, 2024not listed
-
Remove and replace 8 cracked bricksAlteration or repairNov 25, 2023$12,438
-
Renovations to an existing suiteElectricalNov 1, 2023$10,000
-
Jun 27, 2023$6,000
-
Suite 900 DesimoneAlteration or repairApr 17, 2023$215,000
-
Remove existing non structural office partitions and paint in Suite 915Alteration or repairMar 2, 2023$15,000
-
Jan 25, 2023$10,000
-
Alterations to an existing systemFire systemsJan 17, 2023$2,500
-
Renovations to an existing suiteElectricalJan 17, 2023$30,000
-
Mobilize and start interior non structural office work while waiting for ALT1424322Alteration or repairDec 21, 2022$100
-
Run (12) category 6 data cablesElectricalDec 20, 2022$2,000
-
At interior lightwell courtyard areaAlteration or repairSep 15, 2022$125,000
-
Remove interior non bearing office partitionsAlteration or repairAug 29, 2022$12,000
-
Rebuild front northeast corner (front left side) including removal of masonry to expose steel column from…Alteration or repairApr 19, 2022$85,000
-
Renovations to an existing suiteElectricalFeb 14, 2022$10,000
-
Suite 415. Install new ACT, Install new lightsAlteration or repairJan 5, 2022$45,500
-
Suite 215. Remove existing officesAlteration or repairJan 5, 2022$14,500
-
Suite 900. Remove existing non bearing office partitionsAlteration or repairSep 15, 2021$38,000
-
Provide support for electrical service upgrade in the form of coring holes and providing fire rated wood…Alteration or repairSep 15, 2021$28,000
-
Fire escape repair: long flight of 18 steps require clips which are currently welded to be drilled and bolted…Alteration or repairJan 21, 2020$3,489
-
Replace existing main switchgearElectricalDec 30, 2019$75,000
-
Install new fire alarm system building wide to replace existing non conforming system × 2 permitsFire systemsOct 3 to 16, 2019$358,000
-
Aug 23, 2019$2,500
-
May 15, 2019$1,976
-
Front elevation onlyAlteration or repairMar 1, 2019$248,000
-
Nov 14, 2018$4,000
-
Alterations to an existing systemFire systemsOct 9, 2018$2,500
-
Oct 1, 2018$3,700
-
Renovations to an existing suiteElectricalOct 1, 2018$10,000
-
Suite 920-Build new office, remove ceiling tileAlteration or repairSep 6, 2018$7,500
-
Strang Scott - Suite 305 - 3rd FloorAlteration or repairJun 13, 2018$110,000
-
Suite 810-New ceiling tile, carpetAlteration or repairApr 5, 2018$27,000
-
Feb 12, 2018$6,600
-
Supply and install new drain and vent also install new sink and 4 gallon electric hot water heaterPlumbingFeb 9, 2018$2,000
-
Suite 600. Build one new non bearing office partitionAlteration or repairFeb 1, 2018$6,000
-
Mobilize and start work while waiting for ALT 792977Alteration or repairFeb 1, 2018$10,000
-
Alterations to an existing systemFire systemsJan 30, 2018$2,000
-
Renovations to an existing suiteElectricalJan 30, 2018$12,000
-
Dec 19, 2017$219,500
-
Suite 510. Build out new offices and conference roomAlteration or repairOct 26, 2017$87,000
-
Suite 920: Build out new office suiteAlteration or repairAug 31, 2017$65,000
-
Suite 410: Build new offices and conference roomAlteration or repairAug 30, 2017$177,000
-
Aug 28, 2017$8,000
-
Aug 17, 2017$2,502
-
Aug 16, 2017$1,000
-
Supply and install drain and vent also new cold water line for new kitchen sink install new sink and faucet… × 2 permitsPlumbingAug 16, 2017$2,700
-
Low voltage voice and dataElectricalAug 10, 2017$8,400
-
Mobilize and start work while waiting for ALT 736680 Suite 510Alteration or repairJul 28, 2017not listed
-
Mobilize and start work while waiting for ALT 736681Alteration or repairJul 28, 2017not listed
-
Mobilize and start work while waiting for ALT 736683 Suite 920Alteration or repairJul 28, 2017not listed
-
Jul 27, 2017$3,500
-
Jul 27, 2017$57,500
-
Jul 25, 2017$2,000
-
Remove existing non bearing office partitionsAlteration or repairJun 8, 2017$6,000
-
Replace exiting ceiling tile, lightingAlteration or repairJun 8, 2017$15,000
-
Installation of a new meterElectricalApr 14, 2017$1,000
-
Alterations to an existing systemFire systemsApr 5, 2017$2,000
-
Install (9) CatElectricalMar 3, 2017$3,000
-
Build out new office suite 1115 LovenburgAlteration or repairFeb 20, 2017$105,000
-
Build out new office suite 610 TPLAlteration or repairFeb 20, 2017$230,000
-
Build out new office suite 310Alteration or repairFeb 20, 2017$95,000
-
Feb 10, 2017$6,500
-
Installation, termination, testingElectricalJan 26, 2017$15,000
-
Mobilize and start framing while waiting on ALT 672995 suite 310Alteration or repairJan 24, 2017not listed
-
Mobilize and start framing while waiting on ALT 672997 Suite 610Alteration or repairJan 24, 2017not listed
-
Mobile and Start framing while waiting for ALT672999 suite 1115.Cost reflected on ALT672999Alteration or repairJan 24, 2017$100
-
Alterations to an existing systemFire systemsJan 20, 2017$2,000
-
Jan 20, 2017$2,000
-
Jan 20, 2017$42,500
-
Alteration to existing systemFire systemsOct 21, 2016$2,000
-
Renovations to an existing suiteElectricalOct 21, 2016$12,000
-
Swap 4 existing aluminum doors with the same style and size in the same locationAlteration or repairOct 13, 2016$14,500
-
Build new office suiteAlteration or repairAug 5, 2016$275,000
-
Aug 4, 2016$8,000
-
Install kitchen sink, dishwasherPlumbingJul 27, 2016$3,000
-
Mobilize and start framing while waiting for ALT 606515Alteration or repairJul 25, 2016$1,000
-
Alterations to an existing systemFire systemsJul 21, 2016$3,000
-
Renovations to an existing suiteElectricalJul 21, 2016$25,000
-
Remove interior non structural office partitions on floors 3 and 6Alteration or repairFeb 25, 2016$24,000
-
Feb 23, 2016$3,500
-
Install new kitchen cabinets, swap out the existing light fixture for newAlteration or repairOct 15, 2015$22,000
-
Gas coversion on two boilersPlumbingSep 30, 2015$5,000
-
Sep 10, 2015$23,700
-
Sep 10, 2015$10,000
-
Remodel of existing space and fire alarmElectricalSep 8, 2015$20,000
-
Sep 4, 2015$4,000
-
Build two new offices in the existing office suite 700Alteration or repairSep 3, 2015$15,000
-
Aug 31, 2015$5,254
-
Lighting rehab of 7th floorElectricalJul 16, 2015$20,000
-
Change three office door swingsAlteration or repairJul 13, 2015$18,900
-
Infilling 8 existing windows with 4" Concrete Masonry UnitsAlteration or repairJun 26, 2015$17,500
-
Haystack LLC - 8th FloorAlteration or repairMay 22, 2015$79,000
-
May 20, 2015$10,000
-
May 19, 2015$1,500
-
Mobilize and start framing while waiting for ALT 473663 to be issuedAlteration or repairMay 18, 2015$1,000
-
Suite 815 Tenant RemodelAlteration or repairMay 18, 2015$25,000
-
May 7, 2015$7,500
-
10 1/2 Beacon StreetElectricalApr 20, 2015$9,000
-
Mobilize and carry out selective demolitionAlteration or repairMar 26, 2015$5,000
-
Repair to rear fire egress repair stair treads rebolt railsAlteration or repairDec 3, 2014$1,900
-
Jul 1, 2014$10,000
-
Replace existing entry doorAlteration or repairMay 23, 2014$5,000
-
Install new wall panelingAlteration or repairMay 23, 2014$15,000
-
Replacement of the aluminum windowsAlteration or repairOct 3, 2013$419,000
-
Remove existing cooling tower and install new cooling tower on the roofAlteration or repairMar 20, 2013$61,000
-
Repoint 100% of exterior masonryAlteration or repairFeb 15, 2013$2,004,984
-
Jan 2, 2013$1,000
-
Sep 15, 2010$700,000
Sort
Next doorunder 250 ft · 2 permits
-
Replace Stone Panels, selective repointing of facade12-14a Beacon St · 220 ft W · Alteration or repairSep 16$1,088,400
-
Gut remodel bathroom, remove existing tub21 Beacon St · 230 ft W · Alteration or repairAug 21$23,500
This block250 to 1,000 ft · 145 permits
-
Chimneys disintegrated beyond repointing - dismantle to rooflines69 Hancock St · 860 ft W · Alteration or repairOct 7$50,950
-
Install prep sink for Subway Restaurant in the Corner Mall Food Court417-435 Washington St · 850 ft S · PlumbingOct 7$4,500
-
Add a module to system45 School St · 620 ft E · ElectricalOct 7$3,000
-
Electrical demolition, 3 circuits, outlets switches25-55 Court St · 880 ft NE · Alteration or repairOct 7$7,300
-
Replacement of gas boiler100-102 Tremont St · 370 ft SE · PlumbingOct 6$5,000
-
Repair and repoint the two chimneys in kind8 Mount Vernon Pl · 900 ft W · Alteration or repairOct 2$18,000
-
Install security devices at 12 doors201 Washington St · 930 ft E · ElectricalOct 2$32,000
-
Brattle Group - Project #22301 - Tel-data install1 Beacon St · 270 ft NE · ElectricalOct 2$16,595
-
Replacement of a same in kind electric fire pump28-38 Winter St · 830 ft S · Fire systemsOct 1$124,275
-
Provide and install electrical power for new heat pump system36 Temple St · 990 ft NW · ElectricalSep 30$1,500
-
Remove/dispose of existing clapboard on one side of property and install new48 Temple St · 880 ft NW · Alteration or repairSep 28$31,525
-
Minor modification to existing tenant1 Beacon St · 270 ft NE · ElectricalSep 25$18,520
-
Emergency repair to mortar on chimney to stop leak69 Hancock St · 860 ft W · Alteration or repairSep 23$5,550
-
Wire and install low voltage security141 Tremont St · 1,000 ft S · ElectricalSep 23$8,000
-
Dodge & Cox - Project #22195 - Tel-Data Install201 Washington St · 930 ft E · ElectricalSep 23$36,890
-
Install 120V power to 12 work stations201 Washington St · 930 ft E · ElectricalSep 21$35,000
-
Renovations to existing office space on the 26th & 27th floors for new offices1 Beacon St · 270 ft NE · Alteration or repairSep 21$1,500,000
-
Freeman Mathis - Project 21611 - Tenant renovation adding (3) offices with new lighting and added receptacles201 Washington St · 930 ft E · ElectricalSep 15$8,000
-
Provide new IT room cooling unit on the 39th floor201 Washington St · 930 ft E · Alteration or repairSep 14$250,000
-
Masonry Facade Repairs141 Tremont St · 1,000 ft S · Alteration or repairSep 14$279,190
-
Low voltage wiring at Workable 401 Washington Street Floor 5391-405 Washington St · 770 ft SE · ElectricalSep 14$50,000
-
Construction of three single occupant interior offices on the 22nd floor of One Boston Pl. The scope includes…201 Washington St · 930 ft E · Alteration or repairSep 11$66,771
-
Food Court unit, Dumpling & Noodles House In Kitchen417-435 Washington St · 850 ft S · Alteration or repairSep 10$35,500
-
Installation of low voltage telecommunications cabling201 Washington St · 930 ft E · ElectricalSep 10$2,500
-
Installing 6 sinks and 1 water heater25-55 Court St · 880 ft NE · PlumbingSep 9$41,000
-
Provide power to new steam boiler33 Beacon St · 900 ft W · ElectricalSep 9$4,500
-
Replace three water closets, three lavatory faucets141 Tremont St · 1,000 ft S · PlumbingSep 3$5,000
-
Install new led sign 20 inches x233.5 inches lenth131-134 Tremont St · 740 ft S · SignSep 3$5,200
-
Adding/modification to existing system by incorporating initiating and notification devices in 3rd floor suite1-3 Center Pz · 750 ft NE · Fire systemsSep 1$23,000
-
401 Washington 5th Floor: Tenant fit-out391-405 Washington St · 770 ft SE · Alteration or repairAug 28$616,362
-
Retain and restore 42 historic wood windows8 Mount Vernon Pl · 900 ft W · Alteration or repairAug 27$120,000
-
Unit 58 Existing bread house, new name 's Agann's Flatbread48-50 Winter St · 760 ft S · Alteration or repairAug 27$20,000
-
Install sinks, toilets, showers for new dorm rooms17 Court St · 1,000 ft NE · PlumbingAug 24$63,300
-
Whitwell - Project 21874 - Temp power for temp staging28-32 Derne St · 910 ft NW · ElectricalAug 24$2,000
-
Installation of BPDA approved non-illuminated sign on existing building100-102 Tremont St · 370 ft SE · SignAug 24$8,455
-
Furnish and install the following low voltage cabling on the 9th floor201 Washington St · 930 ft E · ElectricalAug 21$95,000
-
New recessed lights, new tv box and 2 wall sconce1 Franklin St · 980 ft SE · ElectricalAug 18$6,000
-
25 Court st, short form scope, change of occupancy from a25-55 Court St · 880 ft NE · Alteration or repairAug 18$172,976
-
Year Up United - Project #21909 - AV System Install1-3 Center Pz · 750 ft NE · ElectricalAug 17$74,650
-
S26-833 - Year Up - Connect modular furniture wiring to existing office circuity1-3 Center Pz · 750 ft NE · ElectricalAug 13$800
-
Relocating 1 breakroom kitchen sink and adding 1 sink/lav in wellness room391-405 Washington St · 770 ft SE · PlumbingAug 12$35,000
-
Wire space to plans provided to isd391-405 Washington St · 770 ft SE · ElectricalAug 12$35,000
-
Disconnect and reconnect fire alarm from Kitchen Hood, microswitch100 City Hall Pz · 950 ft NE · Fire systemsAug 11$850
-
Modifications to existing fire alarm system391-405 Washington St · 770 ft SE · Fire systemsAug 11$8,000
-
HVAC Control wiring on the 3rd floor year up1-3 Center Pz · 750 ft NE · ElectricalAug 11$12,000
-
Removed and replace existing fire suppression system in kind at the existing restaurant100 City Hall Pz · 950 ft NE · Fire systemsAug 11$6,500
-
McCormack Control Center1 Ashburton Pl · 510 ft NW · ElectricalAug 10$7,800
-
Interior space renovation on the 13th floor of One Beacon St. The scope includes selective demo1 Beacon St · 270 ft NE · Alteration or repairAug 10$3,687,217
-
Add 7 loose seats to restaurant with 37 &330 Washington St · 920 ft SE · Alteration or repairAug 7not listed
-
Installation of (29) new emergency lighting inverters and batteries in electrical room throughout the building3 Pemberton Sq · 520 ft N · ElectricalAug 6$300,000
-
401 Washington, 5th Fl: Demo in conjunction with ALT1878958 to include misc391-405 Washington St · 770 ft SE · Alteration or repairAug 3$90,775
-
The work includes repair to concrete slab227-275 Washington St · 900 ft E · Alteration or repairAug 3$676,315
-
T26235 Add electrical equipment to a bike charging station1 Ashburton Pl · 510 ft NW · ElectricalAug 3$24,000
-
Temp generator power for film production15 Court Sq · 800 ft E · ElectricalJul 31$500
-
Temp generator power for film production45 School St · 620 ft E · ElectricalJul 31$500
-
7.22.25 MODIFICATION TO PHASED APPROVAL TO: Build out of an existing restaurant100 City Hall Pz · 950 ft NE · Alteration or repairJul 30$25,000
-
Installation of AFCI receptacles in select guest rooms56-72 School St · 410 ft E · ElectricalJul 29$5,000
-
Install 200amp panel for stage power23-29 School St · 700 ft E · ElectricalJul 28$40,000
-
Restore power45 Province St · 530 ft SE · ElectricalJul 27$300
-
Low voltage cabling for Year-up 1-3 Center PZ floor 31-3 Center Pz · 750 ft NE · ElectricalJul 24$58,000
-
Rep[lacing a total of 8 lavatories23-29 School St · 700 ft E · PlumbingJul 21$4,000
-
To provide temp power and distro for a watch party on July 19th 202630-42 Temple Pl · 950 ft S · ElectricalJul 17$3,500
-
Install fixtures along with all necessary piping to make the job operational and conform with 248CMR Plumbing…227-275 Washington St · 900 ft E · PlumbingJul 16$15,000
-
Install fixtures as contracted along with all necessary piping required to make the job operational in…227-275 Washington St · 900 ft E · PlumbingJul 16not listed
-
New work on 3rd floor for existing tenant expansion1-3 Center Pz · 750 ft NE · Alteration or repairJul 16$1,900,000
-
Install (2) access control doors100 City Hall Pz · 950 ft NE · ElectricalJul 13$8,000
-
Install/relocate data/network wiring and install low voltage wiring for LED227-275 Washington St · 900 ft E · ElectricalJul 13$6,000
-
Renovation of 9th floor with new fire alarm for new architectural layouts201 Washington St · 930 ft E · Fire systemsJul 13$35,000
-
Replace 10 lights, install 9 new lights227-275 Washington St · 900 ft E · ElectricalJul 13$25,000
-
Install low voltage cable and system components associated with an AV system upgrade at 101 TREMONT STREET…53-55 Bromfield St · 440 ft SE · ElectricalJul 10$14,322
-
AV install on 18th, 19th, and 20th Floors100 Cambridge St · 950 ft N · ElectricalJul 9$30,000
-
Change Occupancy to include new Amenity Center with food service on the 9th floor for BNY201 Washington St · 930 ft E · Alteration or repairJul 8$3,000,000
-
Wire for closet, two bathrooms and bar area1 Franklin St · 980 ft SE · ElectricalJul 7$15,000
-
27th floor decommissioning Remove all low voltage wiring including floor below at poke thru devices Make safe…201 Washington St · 930 ft E · ElectricalJul 6$22,000
-
Install new core bathrooms,three private bathrooms201 Washington St · 930 ft E · PlumbingJul 2$364,000
-
Renovation to the fire alarm system for the new tenant1-3 Center Pz · 750 ft NE · Fire systemsJul 2$30,000
-
Renovation and New Work Dental Office1-3 Center Pz · 750 ft NE · PlumbingJul 1$180,000
-
Low voltage wiring for HVAC system - 9th Floor201 Washington St · 930 ft E · ElectricalJul 1$41,700
-
15 security devices on the 3rd floor of 1 Center Plaza for tenant PCG Security Systems GC-2661401-3 Center Pz · 750 ft NE · ElectricalJul 1$20,000
-
Renovation to the 6th floor for new tenant1-3 Center Pz · 750 ft NE · ElectricalJul 1$366,000
-
To provide temp power and distro for a watch party on July 1st 202630-42 Temple Pl · 950 ft S · ElectricalJun 30$3,500
-
Make safe, interior demolition and layout on 3rd floor1-3 Center Pz · 750 ft NE · Alteration or repairJun 29$50,000
-
Remove existing EPDM Install 2.6" insulation and 3" cover board Install EPDM350 Washington St · 920 ft SE · RoofingJun 29$324,000
-
Cameras and Access Control100-102 Tremont St · 370 ft SE · ElectricalJun 29$15,080
-
1 of New 800A service & 1 of New 200A service350 Washington St · 920 ft SE · ElectricalJun 29$250,000
-
Network cabling for cameras at Antico330 Washington St · 920 ft SE · ElectricalJun 25$2,100
-
Fitout of the 9th floor power and lighting for BNY office201 Washington St · 930 ft E · ElectricalJun 24$1,325,000
-
Removal of a section of the bar/half-walls and other finishes23-29 School St · 700 ft E · Alteration or repairJun 23$109,000
-
HVAC Controls20 Somerset St · 620 ft N · ElectricalJun 16$4,000
-
Pulling electrical permit cause Michael Oleary asked for19-21 School St · 760 ft E · ElectricalJun 16$2,200
-
Install of conduit and wire for museum av system125 Tremont St · 550 ft S · ElectricalJun 15$175,000
-
Installing New Fire Alarm system in an Occupied Highrise Residential Building140 Tremont St · 890 ft S · ElectricalJun 15$10,000
-
Install 3 sinks on the 3rd floor at 1-2 Center Plaza1-3 Center Pz · 750 ft NE · PlumbingJun 12$5,000
-
HVAC Control wiring on the 25th floor1 Beacon St · 270 ft NE · ElectricalJun 11$12,000
-
Change of Occupancy from;Health club17-33 Winter St · 760 ft S · Alteration or repairJun 11not listed
-
Tenant fit out, with new lighting and receptacles to fit new layout141 Tremont St · 1,000 ft S · ElectricalJun 10$27,400
-
Suite 525 Interior tenant fit-out25-55 Court St · 880 ft NE · ElectricalJun 9$9,800
-
Replace 5 ATS Switches and Generator Reconditioning1 Ashburton Pl · 510 ft NW · ElectricalJun 9$924,000
-
Relocate a 3 component kitchen sink417-435 Washington St · 850 ft S · PlumbingJun 8$1,800
-
Supply and install plumbing for office remodel1-3 Center Pz · 750 ft NE · PlumbingJun 8$40,000
-
Gas piping for a fryer and two cook stove417-435 Washington St · 850 ft S · PlumbingJun 8$4,000
-
In existing restroom on the 28th floor1 Beacon St · 270 ft NE · Alteration or repairJun 5$229,000
-
2nd Fl: Cosmetic upgrades to men's & women's bathrooms to include new tile141 Tremont St · 1,000 ft S · Alteration or repairJun 5$145,500
-
Install the following: (1) toilets – (1) shower – (1) tubs - (1) bar sink – (1) laundry sink – (3) bathroom…1 Franklin St · 980 ft SE · PlumbingJun 5$25,000
-
Dental office renovation to add power1-3 Center Pz · 750 ft NE · ElectricalJun 5$468,450
-
Install low voltage fire alarm wiring for (1) smoke detector and (1) duct smoke detector1 Ashburton Pl · 510 ft NW · Fire systemsJun 4$2,500
-
Renovation of 25th Floor Spec Suite space1 Beacon St · 270 ft NE · PlumbingJun 3$34,000
-
Renovating existing area to add New dish room and associated waste and water connections20 Somerset St · 620 ft N · PlumbingJun 3$60,000
-
Install 1x Receptacle for a Price Checker MAC Station inside of the Target Store100 Cambridge St · 950 ft N · ElectricalJun 3$2,000
-
Cut out and recaulk entrance at 100 Cambridge100 Cambridge St · 950 ft N · Alteration or repairJun 2$54,007
-
Selective demolition of existing exterior bank signage25-55 Court St · 880 ft NE · Alteration or repairJun 2$3,900
-
First floor lighting remodel,new bathroom vanity45 Province St · 530 ft SE · ElectricalJun 2$3,000
-
T26160 McCormack power to a lift1 Ashburton Pl · 510 ft NW · ElectricalMay 28$23,000
-
New IT Room, provide 4 receptacles100 City Hall Pz · 950 ft NE · ElectricalMay 28$41,000
-
Electrical Installations for a Kitchen100 Cambridge St · 950 ft N · ElectricalMay 27$3,000
-
Rip and replace (5) ACH550 480v three phase VFDs using existing power from existing circuit45 Province St · 530 ft SE · ElectricalMay 27$54,024
-
Suffolk University - Samia Hall - Dish Room Renovation20 Somerset St · 620 ft N · Alteration or repairMay 27$717,195
-
Fifth Fl UNIT 525 - install hand sink with pump and 4-gallon electric water heater25-55 Court St · 880 ft NE · PlumbingMay 26$3,600
-
Interior renovation of restaurant space for new owner227-275 Washington St · 900 ft E · Alteration or repairMay 26$221,148
-
Construction of new Holocaust Museum (Job #250030 - 125 Tremont St.)125 Tremont St · 550 ft S · Fire systemsMay 22$300,000
-
Updated Kitchen Equipment & Track Lighting Add330 Washington St · 920 ft SE · ElectricalMay 21$31,000
-
55 Court st., suite 52525-55 Court St · 880 ft NE · Alteration or repairMay 20$73,117
-
Installation of temporary generator for 3 days for standby power100-102 Tremont St · 370 ft SE · ElectricalMay 20$3,000
-
Installing 46 new fire alarm devices for a new spec suite on the 25th Fl1 Beacon St · 270 ft NE · Fire systemsMay 20$18,000
-
Tenant Fitout - Spec Suite 25th Fl1 Beacon St · 270 ft NE · ElectricalMay 20$361,500
-
Partial 25th Floor interior spec suite office fit out1 Beacon St · 270 ft NE · Alteration or repairMay 20$2,128,742
-
Run drainage venting for under sink pump25-55 Court St · 880 ft NE · PlumbingMay 14$1,500
-
Add data lines to selected locations25-55 Court St · 880 ft NE · ElectricalMay 14$1,000
-
New fire alarm devices on floor 18,19100 Cambridge St · 950 ft N · Fire systemsMay 14$80,000
-
Remodel of existing space25-55 Court St · 880 ft NE · ElectricalMay 14$20,000
-
Replace Access Control Panel with New Updated Panel45 School St · 620 ft E · ElectricalMay 13$1,500
-
125 Tremont Street - Holocaust Museum125 Tremont St · 550 ft S · ElectricalMay 13$215,053
-
Suffolk University – Samia Hall20 Somerset St · 620 ft N · Alteration or repairMay 12$24,251
-
Project #21231 - Tel-Data Install100 Cambridge St · 950 ft N · ElectricalMay 11$280,000
-
Install 134 Ca6a data cables for Public Consultants Group 1 Center PLZ1-3 Center Pz · 750 ft NE · ElectricalMay 11$60,000
-
Provide fire alarm fitout, per attached plans19-21 School St · 760 ft E · Fire systemsMay 11$57,800
-
100 Cambridge St. 02114 - Floors 18100 Cambridge St · 950 ft N · ElectricalMay 7$75,000
-
Connect existing fire alarm modules to new kitchen hood1 Ashburton Pl · 510 ft NW · Fire systemsMay 7$4,117
-
Re-work existing office on first floor and data room in basement1 Ashburton Pl · 510 ft NW · ElectricalMay 7$10,000
-
Replacing existing gas fired steam boiler with Weil Mclain LGB 7 section boiler and 40gal Water heater33 Beacon St · 900 ft W · PlumbingMay 6$6,500
-
Project 21230 - Tenant renovations with new lighting and general office power for new architectural layouts100 Cambridge St · 950 ft N · ElectricalMay 6$1,250,000
-
Kitchen renovation1 Ashburton Pl · 510 ft NW · ElectricalMay 6$30,464
-
Security upgrades on 5th and 10th Floor201 Washington St · 930 ft E · ElectricalMay 6$5,000
-
We are providing new lighting and devices in an existing kitchen/cafeteria20 Somerset St · 620 ft N · ElectricalMay 5$62,000
-
Fitout of Antico Vinaio space330 Washington St · 920 ft SE · PlumbingMay 1$28,000
Within a quarter mile1,000 ft to ¼ mi · 133 permits in 128 projects
-
Unit 5. Install 9 new windows on front of building5 Walnut St · 0.23 mi W · Alteration or repairOct 5$50,850
-
Renovation of two laundry's one kitchen two bathrooms three bar sinks9 Walnut St · 0.23 mi W · PlumbingOct 5$90,000
-
To provide temp power for the Heart Walk on 10/23-24/2026 on the Boston Common139 Tremont St · 0.21 mi SW · ElectricalOct 5$3,500
-
Apt 1 b updating bathroom and laundry and adding a bathroom32-34 Hancock St · 0.20 mi NW · PlumbingOct 2$12,000
-
Wire 01 laundry and 01 bathroom in unit # 1b32-34 Hancock St · 0.20 mi NW · ElectricalOct 2$3,500
-
Entire unit renovation, including basement21 Pinckney St · 0.23 mi W · ElectricalSep 30$20,000
-
Selective exploratory demo of non-structural walls and office partitions280-306 Washington St · 0.19 mi E · Alteration or repairSep 29$65,000
-
101 Arch 7th Fl: Demo and remove nonstructural office walls93-101 Arch St · 0.24 mi SE · Alteration or repairSep 29$64,250
-
101 Arch 5th Fl: Demo and remove nonstructural office walls93-101 Arch St · 0.24 mi SE · Alteration or repairSep 29$68,550
-
Provide 1 x 45kVA portable diesel generator (120/208V) and all associated outdoor rated electrical… × 3 permits139 Tremont St · 0.21 mi SW · ElectricalSep 29$5,000
-
Install new aspirated fire alarm system on 6th floor,connected to existing fire alarm system for data center21-53 Summer St · 0.23 mi S · Fire systemsSep 29$110,000
-
Comprehensive interior renovation thoughout home includes kitchen9 Walnut St · 0.23 mi W · Alteration or repairSep 25$2,383,504
-
10 Milk St 4th Fl: Exploratory demo to include removing non-structural walls280-306 Washington St · 0.19 mi E · Alteration or repairSep 24$19,100
-
To provide temp power for the Jimmy Fund walk on Boston Common from 10/03-04/2026139 Tremont St · 0.21 mi SW · ElectricalSep 23$3,500
-
Workday - Project #22219 - Security system install33 Arch St · 0.22 mi SE · ElectricalSep 23$21,665
-
Install one 52" high x 185.33" wide alum19-21 Milk St · 0.20 mi SE · SignSep 23$8,975
-
Replace copper gutter and copper cladding34 Myrtle St · 0.23 mi W · RoofingSep 22$81,480
-
Provide 6 x 45kVA portable diesel generators (120/208V) and all associated outdoor rated electrical…139 Tremont St · 0.21 mi SW · ElectricalSep 22$5,000
-
Cut and point 100% of mortar joints on walnut st elevation37 Beacon St · 0.21 mi W · Alteration or repairSep 15$120,000
-
Replacement of existing boiler and add drain in Penthouse276-278 Washington St · 0.19 mi E · PlumbingSep 15$20,000
-
Replacement of a boiler276-278 Washington St · 0.19 mi E · PlumbingSep 15$16,000
-
Apto 1B---> Update existing bathroom and demo laundry room and make a second bathroom32-34 Hancock St · 0.20 mi NW · Alteration or repairSep 10$75,788
-
Add 2 Low frequency horns to new bed rooms21-27 Temple Pl · 0.20 mi S · Fire systemsSep 10$3,800
-
Erect tents for Nicola Williams - Spicetober Fest | Boston - Saturday1 City Hall Pz · 0.23 mi NE · OtherSep 9$2,806
-
Erect tents for Pizza Fest - City Hall Plaza Boston 2026 Saturday1 City Hall Pz · 0.23 mi NE · OtherSep 9$23,994
-
Modify existing fire alarm for 2nd floor right side change of use from barber shop to 2 bedroom condo21-27 Temple Pl · 0.20 mi S · Fire systemsSep 9$3,800
-
Remediate and repair structural deficiencies discovered after demo per stamped drawings21-21a Pinckney St · 0.23 mi W · Alteration or repairSep 9$96,317
-
We are replacing two toilets and updating 2 vanities11-17 Bowdoin St · 0.21 mi N · PlumbingSep 8$1,000
-
In a residential 5-unit apartment building27 Hancock St · 0.23 mi NW · Fire systemsSep 3$20,000
-
Furnish and install complete addressable FA system with horn strobe evacuation29 Hancock St · 0.22 mi NW · Fire systemsSep 3$20,000
-
Relocate Panel from closet to hallway to be code compliant11-17 Bowdoin St · 0.21 mi N · ElectricalSep 3$7,000
-
Installing two 20x20 weighted frame tents with walls139 Tremont St · 0.21 mi SW · OtherAug 30$28,655
-
Temporary Generator power for an event on the Boston Common on 8/30/2026139 Tremont St · 0.21 mi SW · ElectricalAug 28$2,000
-
Grounding of (3) generators, (1) 36KW139 Tremont St · 0.21 mi SW · ElectricalAug 27$1,000
-
Diesel generator to Power Inflatables for duration of event139 Tremont St · 0.21 mi SW · ElectricalAug 27$964
-
Install plumbing for 10 affordable apartments29 Hancock St · 0.22 mi NW · PlumbingAug 24$275,000
-
Install plumbing for 5 affordable apartments27 Hancock St · 0.23 mi NW · PlumbingAug 24$175,000
-
Install (2) 20x60, 20x40, (3) 20x30139 Tremont St · 0.21 mi SW · OtherAug 19$28,691
-
Electrical Renovation of 1,920sf condominium53 Mount Vernon St · 0.22 mi W · Alteration or repairAug 19$25,000
-
Pending;ALT1861635 - Occupancy CommitteeStage front of building to top with safety netting compliant with…25 Ridgeway Ln · 0.21 mi NW · Alteration or repairAug 17$32,000
-
Relocating/adding fire alarm devices for a tenant fit-out280-306 Washington St · 0.19 mi E · Fire systemsAug 17$31,000
-
Fire alarm work will consist of converting an existing office building 110 apartment units9 Arch St · 0.21 mi SE · Fire systemsAug 17$365,000
-
Installation of low voltage telecommunications cabling9 Arch St · 0.21 mi SE · ElectricalAug 14$225,000
-
Confirm occupancy of existing 5 units25 Ridgeway Ln · 0.21 mi NW · Alteration or repairAug 14not listed
-
Installing a temporary weighted 20x20 frame tent without walls for a QVC production1 City Hall Pz · 0.23 mi NE · OtherAug 13$1,000
-
Temporary Electrical Service-Generator: Providing temporary electrical power for upcoming festival this…139 Tremont St · 0.21 mi SW · ElectricalAug 13$1,300
-
1 floor: 2 bath, 1 kitchen, 1 laundry53 Mount Vernon St · 0.22 mi W · PlumbingAug 11$4,500
-
1 floor; 1 gas stove53 Mount Vernon St · 0.22 mi W · PlumbingAug 11$1,000
-
This work is the renovation of an existing building that is a five story multi-family29 Hancock St · 0.22 mi NW · ElectricalAug 11$300,000
-
Proposed work to include an interior renovation of the existing building which is a four story miltifamily27 Hancock St · 0.23 mi NW · ElectricalAug 11$200,000
-
Temporary 20x20 Tents will be installed 8.231 City Hall Pz · 0.23 mi NE · OtherAug 7$3,400
-
Install 480 volt transformer 200 amp panel 2 tesla chargers28 State St · 0.23 mi E · ElectricalAug 7$8,000
-
Installing three temporary weighted frame tents1 City Hall Pz · 0.23 mi NE · OtherAug 5$12,100
-
Diesel generator to Power Inflatables for duration of event1 City Hall Pz · 0.23 mi NE · ElectricalAug 5$3,400
-
Grounding of (1) 20KW generator to power sound stage -- for 8/22 and 8/23139 Tremont St · 0.21 mi SW · ElectricalAug 3$1,000
-
Remove roofing, install vapor barrier45-47 Mount Vernon St · 0.20 mi W · RoofingAug 1$64,000
-
Proposed renovation of 1,920 sf condominium53 Mount Vernon St · 0.22 mi W · Alteration or repairJul 30$475,000
-
Install a new copper flashing below the existing gutter and cut and pont sections of the rear section of the…63 Mount Vernon St · 0.24 mi W · RoofingJul 27$68,400
-
Erect 9x12 tent on 7/10/26, removal on 8/17/26139 Tremont St · 0.21 mi SW · OtherJul 23$1,000
-
Fire alarm work on 2nd floor only: Converting an existing office space into an escape room41 West St · 0.21 mi S · Fire systemsJul 23$14,000
-
Updated proposed drawing set for the Fire Pump Replacement project dated 5/15/2026 from Vanderweil Engineers276-278 Washington St · 0.19 mi E · Fire systemsJul 20$474,500
-
Mayor's Office event requiring generator139 Tremont St · 0.21 mi SW · ElectricalJul 13$500
-
Jun 12 to Jul 13$500
-
Fidleity 4th Floor Low Voltage 26-0048-10276-278 Washington St · 0.19 mi E · ElectricalJul 13$20,000
-
Tie in two portable trailers, ground portable generator139 Tremont St · 0.21 mi SW · ElectricalJul 13$1,500
-
To connect a 20kw diesel generator as a power source to a sound system for a music concert at the Parkman…139 Tremont St · 0.21 mi SW · ElectricalJul 9$100
-
Fire Alarm work associated with the cooling tower replacement permitted under building permit SF1812340276-278 Washington St · 0.19 mi E · Fire systemsJul 9$100,000
-
13th and 14th floor renovations HVAC Control wiring for the following devices: -23 total fan power boxes -13…93-101 Arch St · 0.24 mi SE · ElectricalJul 8$25,000
-
Connecting 23 furniture feeds at 7 Water St Boston for Elaine Construction276-278 Washington St · 0.19 mi E · ElectricalJul 8$724
-
Install 2 windows for replacement37 Beacon St · 0.21 mi W · Alteration or repairJul 7$7,269
-
HVAC low voltage system9 Arch St · 0.21 mi SE · ElectricalJul 7$170,100
-
Install temporary 40x60, 10x30, &1 City Hall Pz · 0.23 mi NE · OtherJun 30$6,848
-
Clarify ALT169398619-21 Milk St · 0.20 mi SE · Alteration or repairJun 30not listed
-
Modification of Conditional Use Permit for Cannabis Establishment to change name of petitioner or19-21 Milk St · 0.20 mi SE · Alteration or repairJun 30not listed
-
Remove existing fire pump and perform work detailed on fire protection drawings such as replacing sections of…43-45 West St · 0.21 mi S · Fire systemsJun 26$52,500
-
In existing office space on the 22nd floor33 Arch St · 0.22 mi SE · Alteration or repairJun 24$150,000
-
Connecting 48 office cubicles at 33 Arch St 19th Floor for Harbor Capital33 Arch St · 0.22 mi SE · ElectricalJun 24$1,500
-
Wiring an escape room on 2nd floor41 West St · 0.21 mi S · ElectricalJun 19$25,000
-
Replace roof top units10 Hancock St · 0.24 mi NW · OtherJun 16$8,500
-
Grounding of (1) 56KW generator - 1-day event - JP Morgan Challenge - June 23-24139 Tremont St · 0.21 mi SW · ElectricalJun 16not listed
-
HVAC Control wiring on the 37th floor28 State St · 0.23 mi E · ElectricalJun 15$7,500
-
Amendment to permit ALT1766463 for minor interior layout revisions requested during Health Department review280-306 Washington St · 0.19 mi E · Alteration or repairJun 15$15,000
-
Work is in combination with 27 Hancock29 Hancock St · 0.22 mi NW · Alteration or repairJun 9$3,500,000
-
Change of use and occupancy from the 17 lodger Lodging House to a Multifamily Residential Use27 Hancock St · 0.23 mi NW · Alteration or repairJun 9$2,800,000
-
Within Skechers (AKA 477 Washington St): Thermostats and sensors should already be in place60-70 Temple Pl · 0.20 mi S · ElectricalJun 8$2,115
-
Provide 2 x 45kVA portable diesel generator and all associated outdoor rated electrical distribution…139 Tremont St · 0.21 mi SW · ElectricalJun 5$5,000
-
Grounding of portable generator for 1 day event - June 6th139 Tremont St · 0.21 mi SW · ElectricalJun 2$800
-
Install 3 new receptacles, add one new 2x2 light28 State St · 0.23 mi E · ElectricalJun 2$3,500
-
Relocate existing electrical panel11a-11 Myrtle St · 0.20 mi NW · ElectricalJun 2$8,000
-
Erect (6) 10x20, (2) 20x30, (3) 20x201 City Hall Pz · 0.23 mi NE · OtherMay 28$31,590
-
Furnish and install (10) fire alarm devices9 Arch St · 0.21 mi SE · Fire systemsMay 28$15,000
-
Exterior deck repairs new timber Teck decking repair rails21 Ridgeway Ln · 0.22 mi NW · Alteration or repairMay 27$70,889
-
Replacement of a dishwasher25 Ridgeway Ln · 0.21 mi NW · PlumbingMay 27$200
-
Replacing gas dryer in common area laundry room24a-24 Joy St · 0.20 mi NW · PlumbingMay 27$200
-
Tenant improvements on the 37th Floor28 State St · 0.23 mi E · Fire systemsMay 27$12,000
-
Tenant improvements on the 37th Floor28 State St · 0.23 mi E · ElectricalMay 27$90,000
-
REAR fire escape repairs, replacement of bolts, and 37 treads11-19 Temple Pl · 0.19 mi S · Alteration or repairMay 22$12,800
-
Remove existing metal staircase at rear of building in courtyard6 Chestnut St · 0.25 mi W · Alteration or repairMay 22$55,000
-
Replace damaged led lighting, switches and reattach receptacle boxes on floors 3,4&5147 Tremont St · 0.21 mi S · ElectricalMay 21$26,000
-
Install 800 Amp feeders to 3 new 250 ton chillers on the roof21-53 Summer St · 0.23 mi S · ElectricalMay 21$369,000
-
Interior repairs due to water damage147 Tremont St · 0.21 mi S · Alteration or repairMay 20$255,094
-
Plumbing renovation28 State St · 0.23 mi E · PlumbingMay 19$10,000
-
Temp connections to an air handler unit276-278 Washington St · 0.19 mi E · ElectricalMay 19$12,000
-
Wire space to plans provided to building department93-101 Arch St · 0.24 mi SE · ElectricalMay 19$85,000
-
Partial 37th floor interior office fit out28 State St · 0.23 mi E · Alteration or repairMay 19$1,124,610
-
At 27-29 Hancock Street, Creation will remove all deteriorated square head bolts throughout the fire escapes29 Hancock St · 0.22 mi NW · Alteration or repairMay 18$9,680
-
20 security devices on the 13th & 14th floors of 93-101 Arch Street (101 Arch Street) for tenant AIB TK-26610093-101 Arch St · 0.24 mi SE · ElectricalMay 15$30,000
-
177 telecom drops & 125 sound masking emitters on the 13th & 14th floors of 93-101 Arch Street (101 Arch…93-101 Arch St · 0.24 mi SE · ElectricalMay 14$40,548
-
Kitchen and bathroom renovation45-47 Mount Vernon St · 0.20 mi W · ElectricalMay 14$7,000
-
Grounding for stage and temp generator 24kva for one day outdoor event 6-6-26 rainbow walk on Boston common…139 Tremont St · 0.21 mi SW · ElectricalMay 13$1,000
-
*7 WATER ST, BOSTON, MA 02109* Tie into the existing panel to feed the temp transformer276-278 Washington St · 0.19 mi E · ElectricalMay 13$10,000
-
Replace Brookline Bank signs with Beacon Bank Signs: 1 internally illluminated cabinet over entrance and 4…7 Congress St · 0.25 mi E · SignMay 13$35,950
-
Fixture swap bathroom30 Hancock St · 0.20 mi NW · PlumbingMay 12$4,000
-
New waste, water, & vent piping for three kitchen sinks93-101 Arch St · 0.24 mi SE · PlumbingMay 12$32,750
-
De-energized maintenance and testing50 Milk St · 0.22 mi E · ElectricalMay 12$21,000
-
Emergency Service due to a flood in the building26-30 West St · 0.24 mi S · ElectricalMay 11$5,000
-
Modify existing sprinkler system on 8th floor7 Congress St · 0.25 mi E · Fire systemsMay 11$12,000
-
Renovate Kitchen, countertops with fixtures21-21a Pinckney St · 0.23 mi W · Alteration or repairMay 8$455,000
-
Provide 2 x 500kW and 3 x 70kW portable diesel generators as well as tie into 2 house panels for Sound1 City Hall Pz · 0.23 mi NE · ElectricalMay 8$25,000
-
Wire kitchen and bathroom30 Hancock St · 0.20 mi NW · ElectricalMay 8$10,000
-
Installation of two new chillers on the seventh-floor roof21-53 Summer St · 0.23 mi S · Alteration or repairMay 8$3,554,969
-
Construct two new offices in existing open office area28 State St · 0.23 mi E · Alteration or repairMay 7$73,187
-
Power for the Mojo Music Fest on Saturday, May 9th 20261 City Hall Pz · 0.23 mi NE · ElectricalMay 7$5,000
-
Installing new notification devices in the tenant space on the 20th floor50 Milk St · 0.22 mi E · Fire systemsMay 7$2,500
-
Installing new fire alarm devices in tenant space on floors 13 & 1493-101 Arch St · 0.24 mi SE · Fire systemsMay 7$20,000
-
2 Temporary 20x20 Tents will be installed and removed 6/1/2026139 Tremont St · 0.21 mi SW · OtherMay 6$1,486
-
3 Floor: 1 kitchen and 1 bath remodeling45-47 Mount Vernon St · 0.20 mi W · PlumbingMay 5$7,000
-
Installation of additional IP camera coverage28 State St · 0.23 mi E · ElectricalMay 4$50,000
Zoning requests nearby1 request · as of Oct 9
Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.
-
To change occupancy from retail chocolate store to café with takeout276 to 278 Washington St · 1,000 ft E · Approved · city: "Appeal Closed", decision "Approved" · case BOA1822390Decided Sep 11hearing Aug 20
Boston Inspectional Services Department updated its data Oct 8, 2026. We checked it Oct 9, 07:22 UTC. See the city's official records.
Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 9, 06:47 UTC.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.