47 permits on record here. The newest, Aug 17: Fire alarm work will consist of converting an existing office building 110 apartment units. Within a quarter mile, the city has issued 551 more permits since May 1.
Within
Since
Here47 permits · 9 Arch St
-
Fire alarm work will consist of converting an existing office building 110 apartment unitsFire systemsAug 17$365,000
-
Aug 14$225,000
-
HVAC low voltage systemElectricalJul 7$170,100
-
Furnish and install (10) fire alarm devicesFire systemsMay 28$15,000
-
Apr 22$3,776,000
-
Mar 26$4,000,000
-
Mar 26$5,000
-
Mar 25$1,000
-
Feb 3$19,000
-
Change of occupancy from Offices to Multi-family Dwelling for 110 unitsAlteration or repairDec 11, 2025$20,035,000
-
Replace dishwasherPlumbingMar 10, 2018$300
-
Nov 2, 2017$11,000
-
Oct 18, 2017$5,400
-
Oct 10, 2017$15,000
-
Sep 26, 2017$6,000
-
Sep 21, 2017$16,500
-
2nd floor install of (1) smoke detecotFire systemsSep 21, 2017$4,000
-
Sep 21, 2017$10,500
-
Tenant fit out to include new paint, carpet, and lightingAlteration or repairSep 19, 2017$110,716
-
Cutting walls down to 1 foot from the floorAlteration or repairSep 12, 2017$5,900
-
Jul 13, 2017$7,800
-
Replace toilet fixtures, toilet partitions, flooring, paint wallsAlteration or repairJul 7, 2017$56,168
-
Jun 26, 2017$20,000
-
Relocate #1 kitchen sinkPlumbingMay 24, 2017$4,500
-
E - Plan -; Interior Renovations to 4th Floor: DemolitionAlteration or repairMay 1, 2017$147,674
-
Apr 21, 2017$1,500
-
Apr 7, 2017$3,600
-
Replace existing windows with new to match work recently completed on permits SF417560 and SF579353Alteration or repairApr 3, 2017$141,787
-
Mar 22, 2017$6,000
-
Mar 20, 2017$6,000
-
Mar 20, 2017$12,000
-
Mar 8, 2017$15,000
-
Feb 23, 2017$2,400
-
Interior Renovations: Maiona and WardAlteration or repairFeb 22, 2017$140,622
-
Low voltage voice and data cablingElectricalFeb 14, 2017$7,000
-
Tenant Fit Up-Interior Renovations: DemolitionAlteration or repairFeb 14, 2017$106,000
-
Feb 7, 2017$10,000
-
Tenant Fit Up: Brailsford and Dunlavey 31 Milk StreetAlteration or repairDec 22, 2016$150,093
-
Dec 12, 2016$3,600
-
Nov 30, 2016$20,000
-
Nov 2, 2016$2,500
-
Remodel bathroomsPlumbingJun 20, 2016$7,000
-
Wiring and miscElectricalJun 8, 2016$9,500
-
Jun 8, 2016$8,000
-
Wiring and lighting for TDC 3rd floorElectricalJun 8, 2016$35,000
-
Fire alarmFire systemsJun 1, 2016$6,000
-
Replace old windows to match recently installed windows permit SF417560Alteration or repairApr 27, 2016$124,466
Sort
Next doorunder 250 ft · 7 permits
-
Workday - Project #22219 - Security system install33 Arch St · 100 ft S · ElectricalSep 23$21,665
-
Install one 52" high x 185.33" wide alum19-21 Milk St · 95 ft NW · SignSep 23$8,975
-
Connecting 9 office cubicles at 185 Devonshire st181-185 Devonshire St · 200 ft SE · ElectricalSep 17$284
-
Add 7 loose seats to restaurant with 37 &330 Washington St · 210 ft NW · Alteration or repairAug 7not listed
-
Renovation of existing plumbing for OneUnited Bank181-185 Devonshire St · 200 ft SE · PlumbingJul 30$4,000
-
Partial 2nd floor occupied interior renovation to an existing space181-185 Devonshire St · 200 ft SE · Alteration or repairJul 22$248,167
-
185 Devonshire St 2nd Floor - OneUnited Bank renovation181-185 Devonshire St · 200 ft SE · ElectricalJul 21$32,000
This block250 to 1,000 ft · 149 permits
-
Renovation to locker room showers - added plumbing for kitchen area43-65 State St · 910 ft NE · PlumbingOct 2$100,000
-
WCT - Fitout Flrs 16-17 Simpson115 Federal St · 770 ft SE · ElectricalOct 2$185,000
-
Install security devices at 12 doors201 Washington St · 790 ft N · ElectricalOct 2$32,000
-
Install new kitchen sink with dishwasher on 5th floor43-65 State St · 910 ft NE · PlumbingOct 1$12,000
-
At 1 Federal - 11th FLR1 Federal St · 310 ft SE · ElectricalOct 1$6,000
-
At 1 Federal - 25th FLR1 Federal St · 310 ft SE · ElectricalOct 1$10,000
-
At 1 Federal - 23rd FLR we are demoing the offices to open the space back up for the building1 Federal St · 310 ft SE · ElectricalOct 1$12,000
-
Low voltage piping & wiring for control wiring project12 Post Office Sq · 640 ft NE · ElectricalSep 30$130,000
-
Selective exploratory demo of non-structural walls and office partitions280-306 Washington St · 300 ft N · Alteration or repairSep 29$65,000
-
101 Arch 7th Fl: Demo and remove nonstructural office walls93-101 Arch St · 600 ft SW · Alteration or repairSep 29$64,250
-
101 Arch 5th Fl: Demo and remove nonstructural office walls93-101 Arch St · 600 ft SW · Alteration or repairSep 29$68,550
-
Install new aspirated fire alarm system on 6th floor,connected to existing fire alarm system for data center21-53 Summer St · 880 ft SW · Fire systemsSep 29$110,000
-
Installing 82 new fire alarm device for tenant fit out on the 38th & 39th floors - Freshfields1 Post Office Sq · 820 ft E · Fire systemsSep 29$85,000
-
10 Milk St 4th Fl: Exploratory demo to include removing non-structural walls280-306 Washington St · 300 ft N · Alteration or repairSep 24$19,100
-
To install 2 kit sinks, 1 lav, 2 wc1 Post Office Sq · 820 ft E · PlumbingSep 24$50,000
-
Doing security door at 1 Federal st, Boston, 37th floor for Test Fit1 Federal St · 310 ft SE · ElectricalSep 24$1,200
-
Doing security door at 1 Federal st1 Federal St · 310 ft SE · ElectricalSep 24$1,200
-
Sweetgreen cafe interior refresh upgrades to existing conditions of retail cafe83-87 Summer St · 980 ft S · Alteration or repairSep 23$14,500
-
Dodge & Cox - Project #22195 - Tel-Data Install201 Washington St · 790 ft N · ElectricalSep 23$36,890
-
Plumbing connections in support of an office fit out33-59 Congress St · 610 ft NE · PlumbingSep 22$182,000
-
Fidelity Walk in Center 1st Floor and Lower Mezzanine renovations including 1 100amp 120/208 volt sub panel33-59 Congress St · 610 ft NE · ElectricalSep 22$620,000
-
Install 120V power to 12 work stations201 Washington St · 790 ft N · ElectricalSep 21$35,000
-
HNTB - 6 & 7th floor offices/conf rooms115 Federal St · 770 ft SE · Fire systemsSep 19$12,000,000
-
Interior renovation of appr 40,000SF to existing 38th & 39th floors1 Post Office Sq · 820 ft E · Alteration or repairSep 17$5,033,000
-
One Federal Street Floor 23- Interior non-structural demolition of partitions1 Federal St · 310 ft SE · Alteration or repairSep 16$4,500
-
One Federal Street Floor 25-Interior selective demolition of partitions1 Federal St · 310 ft SE · Alteration or repairSep 16$4,500
-
One Federal Floor 111 interior non-Structural interior demolition of partitions1 Federal St · 310 ft SE · Alteration or repairSep 16$4,500
-
Conference room and training room101 Federal St · 670 ft SE · ElectricalSep 16$26,000
-
Connect modular furniture wiring to existing office circuitry1 Post Office Sq · 820 ft E · ElectricalSep 16$1,000
-
Replacement of existing boiler and add drain in Penthouse276-278 Washington St · 380 ft N · PlumbingSep 15$20,000
-
Replacement of a boiler276-278 Washington St · 380 ft N · PlumbingSep 15$16,000
-
Freshfields - Project #22142 - Tel-Data Install1 Post Office Sq · 820 ft E · ElectricalSep 15$94,500
-
Freeman Mathis - Project 21611 - Tenant renovation adding (3) offices with new lighting and added receptacles201 Washington St · 790 ft N · ElectricalSep 15$8,000
-
Replacing 20 Fan Coil Units1 Post Office Sq · 820 ft E · ElectricalSep 15$12,000
-
Provide new IT room cooling unit on the 39th floor201 Washington St · 790 ft N · Alteration or repairSep 14$250,000
-
Low voltage wiring at Workable 401 Washington Street Floor 5391-405 Washington St · 610 ft W · ElectricalSep 14$50,000
-
240 Devonshite St Unit #4101 Install (2) outlets for closet millwork115 Federal St · 770 ft SE · ElectricalSep 14$2,500
-
Construction of three single occupant interior offices on the 22nd floor of One Boston Pl. The scope includes…201 Washington St · 790 ft N · Alteration or repairSep 11$66,771
-
Installation of temporary grounding for generator40-46 Summer St · 600 ft S · ElectricalSep 11$1,300
-
Food Court unit, Dumpling & Noodles House In Kitchen417-435 Washington St · 690 ft W · Alteration or repairSep 10$35,500
-
New flooring, lighting, millwork, paint, vinyl base, misc43-65 State St · 910 ft NE · Alteration or repairSep 10$298,200
-
Installation of low voltage telecommunications cabling201 Washington St · 790 ft N · ElectricalSep 10$2,500
-
40 telecom drops on the 18th floor of 1 Federal Street for tenant TA Realty CZ-2674351 Federal St · 310 ft SE · ElectricalSep 10$3,801
-
Installation of Access & CCTV security devices at Bank of America 100 Federal St Boston MA (100862180-01&02)100 Federal St · 800 ft SE · ElectricalSep 10$12,147
-
Perform maintenance testing of the distribution switchgear at 50 Post Office Square Boston Ma 021101 Post Office Sq · 820 ft E · ElectricalSep 10$33,300
-
Connecting 40 office cubicles at 53 State st43-65 State St · 910 ft NE · ElectricalSep 10$1,260
-
HVAC Control wiring on the 18th floor ta realty1 Federal St · 310 ft SE · ElectricalSep 9$7,500
-
Relocation of not more than 10 sprinkler heads and sprinkler branch for slab to be cut for communing stairs1 Post Office Sq · 820 ft E · Fire systemsSep 8$500
-
Commerical Fitout of law offices with kitchenettes and bathrooms - Levels 15-17115 Federal St · 770 ft SE · PlumbingSep 8$150,000
-
Provide Low Voltage Services for Card Readers, Cameras, Intercoms1p Post Office Sq · 580 ft E · ElectricalSep 8$25,000
-
Wiring for 9 access control doors43-65 State St · 910 ft NE · ElectricalSep 3$14,000
-
Freshfields - Project 22057 - Tenant fit out of 38th and 39th floor with new electrical equipment1 Post Office Sq · 820 ft E · ElectricalSep 3$1,000,000
-
Supply and install plumbing for tenant office fit-out33-59 Congress St · 610 ft NE · PlumbingSep 2$23,000
-
Install 5 sinks, 1 toilet, 3 HWH1 Post Office Sq · 820 ft E · PlumbingSep 2$70,000
-
NEW CAT6 & Cat6A CABLING SCOPE: (TOTAL CABLES – 128 Cat6 / 3 Cat6A) 60 – 2 Port Cat6 Drops 8 – 1 Port Cat6…70 Federal St · 560 ft SE · ElectricalSep 2$20,000
-
Fidelity Investments Security 11 Card Reader and 25 cameras33-59 Congress St · 610 ft NE · ElectricalSep 2$130,000
-
Electrical Work Associate d With Tenat Fitout43-65 State St · 910 ft NE · ElectricalSep 2$3,500
-
4th Floor: Cosmetic upgrades to existing 4th floor office to include new paint10 Post Office Sq · 630 ft NE · Alteration or repairAug 31$33,800
-
Removal of walls, ceilings, and flooring at 19th and 37th floor suites100 Federal St · 800 ft SE · Alteration or repairAug 28$276,456
-
260909 - For the installation wiring, lights &43-65 State St · 910 ft NE · ElectricalAug 28$60,000
-
We will cut and drop to the floor all lighting100 Federal St · 800 ft SE · SignAug 28$8,500
-
401 Washington 5th Floor: Tenant fit-out391-405 Washington St · 610 ft W · Alteration or repairAug 28$616,362
-
Connecting 15 office cubicles at 1 Federal st 21st floor1 Federal St · 310 ft SE · ElectricalAug 27$473
-
S26-901 - Furnish and Install electrical jumpers between the added workstations using the supplied jumpers…100 Federal St · 800 ft SE · ElectricalAug 26$800
-
Renovation to the fire alarm system for new tenant on the 4th floor33-59 Congress St · 610 ft NE · Fire systemsAug 25$75,000
-
Renovation to the 4th floor for new tenant33-59 Congress St · 610 ft NE · ElectricalAug 25$900,000
-
On the 19th floor-cut and cap- pantry sink and one hot water heater On the 37th Floor-demolished: ADA bathroom100 Federal St · 800 ft SE · PlumbingAug 24$8,500
-
Goulston - Project #22030 - Install 12 cameras and cable pull1 Post Office Sq · 820 ft E · ElectricalAug 24$1,085
-
Renovation to the 16th & 17th Floor of 115 Federal Street for ST&B115 Federal St · 770 ft SE · Fire systemsAug 24$160,000
-
Renovation to the 16th and 17th Floors of 115 Federal Street for ST&B115 Federal St · 770 ft SE · ElectricalAug 24$2,840,000
-
Installation of BPDA approved non-illuminated sign on existing building100-102 Tremont St · 810 ft W · SignAug 24$8,455
-
Furnish and install the following low voltage cabling on the 9th floor201 Washington St · 790 ft N · ElectricalAug 21$95,000
-
Amend past construction plans approved in ALT #169934110 Post Office Sq · 630 ft NE · Fire systemsAug 20$12,000
-
Interior renovation 2nd floor to include: new partitions115 Federal St · 770 ft SE · Alteration or repairAug 19$2,500,000
-
Install new plumbing for a sink in the coffee bar area on the 18th floor1 Federal St · 310 ft SE · PlumbingAug 18$18,000
-
New recessed lights, new tv box and 2 wall sconce1 Franklin St · 490 ft SW · ElectricalAug 18$6,000
-
Relocating/adding fire alarm devices for a tenant fit-out280-306 Washington St · 300 ft N · Fire systemsAug 17$31,000
-
Interior fitout on 16th &115 Federal St · 770 ft SE · Alteration or repairAug 17$17,751,616
-
Conversion of commercial building into apartment building12 Post Office Sq · 640 ft NE · PlumbingAug 14$950,000
-
Deleting Won Door on the 19th Floor1 Post Office Sq · 820 ft E · Fire systemsAug 14$2,500
-
Remodel of small tenant space1 Federal St · 310 ft SE · Fire systemsAug 13$18,750
-
Interior renovation on the 6th floor of 53 State St. The scope includes selective demolition43-65 State St · 910 ft NE · Alteration or repairAug 12$84,401
-
Relocating 1 breakroom kitchen sink and adding 1 sink/lav in wellness room391-405 Washington St · 610 ft W · PlumbingAug 12$35,000
-
Installation of low voltage telecommunications cabling1 Federal St · 310 ft SE · ElectricalAug 12$35,000
-
Wire space to plans provided to isd391-405 Washington St · 610 ft W · ElectricalAug 12$35,000
-
Remodel of small suite on the 18th floor1 Federal St · 310 ft SE · ElectricalAug 12$120,000
-
Modifications to existing fire alarm system391-405 Washington St · 610 ft W · Fire systemsAug 11$8,000
-
HVAC Control wiring on the 37th floor spec suite1 Federal St · 310 ft SE · ElectricalAug 11$8,500
-
HVAC Control wiring on the 37th floor verdad capital1 Federal St · 310 ft SE · ElectricalAug 11$9,500
-
HVAC Control wiring on the 7th floor75-101 Federal St · 530 ft SE · ElectricalAug 11$3,500
-
53 State Street - Project #21900 - Build out of (3) offices in an existing tenant space with new lighting and…43-65 State St · 910 ft NE · ElectricalAug 10$25,000
-
Interior Fit out - Selective Demolition33-59 Congress St · 610 ft NE · Alteration or repairAug 10$2,877,659
-
Install 480 volt transformer 200 amp panel 2 tesla chargers28 State St · 990 ft N · ElectricalAug 7$8,000
-
Install new low voltage in 70 units12 Post Office Sq · 640 ft NE · ElectricalAug 6$5,000
-
Reinstall meter on existing meter socket44 Kilby St · 940 ft NE · ElectricalAug 6$1,000
-
S26-737/738 - Electrician to connect modular workstation wiring to existing office circuitry115 Federal St · 770 ft SE · ElectricalAug 6$800
-
Audio Visual work in Boardroom1 Federal St · 310 ft SE · ElectricalAug 5$35,000
-
Wire 3rd floor tenant space to plans provided to ISD10 Post Office Sq · 630 ft NE · ElectricalAug 5$32,000
-
Correction to Amendment A1828597 should be Amending ALT1772393 for Boston Globe -2 &43-65 State St · 910 ft NE · Alteration or repairAug 5not listed
-
Supply and install new waste, water10 Post Office Sq · 630 ft NE · PlumbingAug 4$12,000
-
BEACON BANK SIGNAGE REBRAND: Install (1) D/F illuminated blade sign1 Post Office Sq · 820 ft E · SignAug 4$22,000
-
401 Washington, 5th Fl: Demo in conjunction with ALT1878958 to include misc391-405 Washington St · 610 ft W · Alteration or repairAug 3$90,775
-
The work includes repair to concrete slab227-275 Washington St · 530 ft N · Alteration or repairAug 3$676,315
-
New lighting, glass, paint, ACT and flooring43-65 State St · 910 ft NE · Alteration or repairAug 3$150,000
-
Commercial Kitchen for restaurant - Bathroom75-79 Summer St · 910 ft S · PlumbingJul 31$10,000
-
Temp generator power for film production15 Court Sq · 670 ft N · ElectricalJul 31$500
-
Schneider Project #21780 - AV System Install115 Federal St · 770 ft SE · ElectricalJul 31$60,900
-
Installation of Fire Alarm Tenant Fit out33-59 Congress St · 610 ft NE · Fire systemsJul 31$22,315
-
Updating exisiting fire alarm system on the 3rd floor voice evac system high rise building10 Post Office Sq · 630 ft NE · Fire systemsJul 31$15,000
-
Interior office space renovation on the 18th floor of One Federal Street1 Federal St · 310 ft SE · Alteration or repairJul 30$510,927
-
Installation of Fire Alarm System Tenant Fitout33-59 Congress St · 610 ft NE · ElectricalJul 29$22,315
-
Electrical Work Associated with Tenant Fitout43-65 State St · 910 ft NE · ElectricalJul 29$75,000
-
Installation of AFCI receptacles in select guest rooms56-72 School St · 750 ft NW · ElectricalJul 29$5,000
-
Install 200amp panel for stage power23-29 School St · 530 ft NW · ElectricalJul 28$40,000
-
Installation of structured cabling system on the 1st Fl and mezzanine33-59 Congress St · 610 ft NE · ElectricalJul 27$40,000
-
240 Devonshire St. Work being done in unit 5908(System would not accept the correct building address) Add 4115 Federal St · 770 ft SE · ElectricalJul 27$1,200
-
Restore power45 Province St · 600 ft NW · ElectricalJul 27$300
-
Remove existing iron straight and spiral fire escape and replace with new stainless steel fire escape in kind86-104 Franklin St · 330 ft S · Alteration or repairJul 27$48,789
-
Low voltage cabling install at Community Care 75 Federal Street75-101 Federal St · 530 ft SE · ElectricalJul 24$23,000
-
OPOS - Project 20664 - New tenant fit out with (5) new 100amp meter sockets Eversource WO 28042570- Base…1 Post Office Sq · 820 ft E · ElectricalJul 23$5,000
-
Installation of 2 new outlets for furniture75-101 Federal St · 530 ft SE · ElectricalJul 23$4,000
-
Installation of BPDA approved freestanding sign for Wilmer Hale outside of building entrance100 Federal St · 800 ft SE · SignJul 23$28,250
-
Replacement of (1) AHU system48-50 Summer St · 710 ft SW · ElectricalJul 22$2,500
-
Rep[lacing a total of 8 lavatories23-29 School St · 530 ft NW · PlumbingJul 21$4,000
-
Low Voltage cabling for 75 Federal Street 9th floor DCAMM75-101 Federal St · 530 ft SE · ElectricalJul 20$7,000
-
Updated proposed drawing set for the Fire Pump Replacement project dated 5/15/2026 from Vanderweil Engineers276-278 Washington St · 380 ft N · Fire systemsJul 20$474,500
-
Installing approximately 50 Cat6 data cable runs10 Post Office Sq · 630 ft NE · ElectricalJul 17$60,000
-
Pull 4 composite and 4 CAT 6 cables to 4 access-controlled doors and 4 security cameras10 Post Office Sq · 630 ft NE · ElectricalJul 17$30,000
-
Upgrades to tenant space on 5th floor43-65 State St · 910 ft NE · Alteration or repairJul 16$175,000
-
Install fixtures along with all necessary piping to make the job operational and conform with 248CMR Plumbing…227-275 Washington St · 530 ft N · PlumbingJul 16$15,000
-
Install fixtures as contracted along with all necessary piping required to make the job operational in…227-275 Washington St · 530 ft N · PlumbingJul 16not listed
-
77 – TD Locations 10 – Wireless Access Points @ 53 State Street – Floors 17 & 1843-65 State St · 910 ft NE · ElectricalJul 16$20,000
-
Installation of CCTV and Access security devices at Bank of America 100 Federal St FL 8 Boston MA 02110…100 Federal St · 800 ft SE · ElectricalJul 16$8,225
-
Installation of Access and CCTV security devices at Bank of America 100 Federal St FL 11 Boston MA 02110…100 Federal St · 800 ft SE · ElectricalJul 16$8,202
-
Reliance Standard Life Insurance - 6th floor - Replacement of finishes including non load-bearing GWB…77 Franklin St · 480 ft S · Fire systemsJul 15$86,455
-
Schneider Project # 21181 - Installation of security cabling for the 10th and 11th floor115 Federal St · 770 ft SE · ElectricalJul 14$30,000
-
Connecting 15 furniture feeds at 1 Federal st on 21st floor for Verrill1 Federal St · 310 ft SE · ElectricalJul 14$472
-
Low voltage wiring for HVAC system1 Post Office Sq · 820 ft E · ElectricalJul 13$7,500
-
Install/relocate data/network wiring and install low voltage wiring for LED227-275 Washington St · 530 ft N · ElectricalJul 13$6,000
-
Fidleity 4th Floor Low Voltage 26-0048-10276-278 Washington St · 380 ft N · ElectricalJul 13$20,000
-
Renovation of 9th floor with new fire alarm for new architectural layouts201 Washington St · 790 ft N · Fire systemsJul 13$35,000
-
Replace 10 lights, install 9 new lights227-275 Washington St · 530 ft N · ElectricalJul 13$25,000
-
Install low voltage cable and system components associated with an AV system upgrade at 101 TREMONT STREET…53-55 Bromfield St · 750 ft W · ElectricalJul 10$14,322
-
Installing 18 new fire alarm device for a new Spec Suite space at 1 PO Sq. on the 10th Fl1 Post Office Sq · 820 ft E · Fire systemsJul 10$24,000
-
OME Job#26-078 - 77 Franklin Street - RSLI 6th Floor - Furnish and installation of electrical power and…77 Franklin St · 480 ft S · ElectricalJul 10$15,060
-
Fire Alarm work associated with the cooling tower replacement permitted under building permit SF1812340276-278 Washington St · 380 ft N · Fire systemsJul 9$100,000
-
Work is to be done on the 9th floor and consist of architectural upgrades including new flooring75-101 Federal St · 530 ft SE · Alteration or repairJul 8$57,010
-
Construct two office mockups for design development115 Federal St · 770 ft SE · Alteration or repairJul 8$129,195
-
Plumbing connections (water line) to support an office fitout75-101 Federal St · 530 ft SE · PlumbingJul 8$3,200
Within a quarter mile1,000 ft to ¼ mi · 142 permits in 141 projects
-
Brattle Group - Project #22301 - Tel-data install1 Beacon St · 0.20 mi NW · ElectricalOct 2$16,595
-
White & Case - 23rd & 24th - demo existing controls & rework existing network on 2375 State St · 0.20 mi NE · ElectricalOct 2$4,695
-
Electrical for Gym/workout area new lighting172-180 Federal St · 0.23 mi SE · ElectricalOct 2$198,000
-
Replace existing fire pump with new, in-kind fire pump and controller75 State St · 0.20 mi NE · Fire systemsOct 2$275,000
-
Replacement of a same in kind electric fire pump28-38 Winter St · 0.19 mi W · Fire systemsOct 1$124,275
-
Interior office demolition across two existing offices on floors 23 & 2475 State St · 0.20 mi NE · Alteration or repairOct 1$400,000
-
3 security devices on the 6th floor of 100 Summer St for tenant JellyFish DC-705101100 Summer St · 0.20 mi S · ElectricalSep 30$1,000
-
Installing 1 new fire alarm device and relocating 4 existing for tenant fit out - Market Ready Suite99 High St · 0.22 mi SE · Fire systemsSep 30$19,000
-
Addition of 9 strobe, 2 horn strobes31-33 Kingston St · 0.21 mi S · Fire systemsSep 30$3,500
-
Electrical work associated with partial renovation on the 20th floor125 Summer St · 0.23 mi S · ElectricalSep 30$18,000
-
Sidney Austin 36th floor Renovation of existing interior office space work to add conference rooms60 State St · 0.20 mi NE · Alteration or repairSep 30$1,000,000
-
6th Floor: Demo and remove nonstructural office walls265 Franklin St · 0.24 mi E · Alteration or repairSep 29$42,750
-
Office densification - adding new cubicles to add more open office layout seating on the 21st Floor99 High St · 0.22 mi SE · Alteration or repairSep 29$127,279
-
Partial 21st floor interior occupied renovation60 State St · 0.20 mi NE · Alteration or repairSep 29$858,404
-
Minor work and interior upgrades to existing restaurant space99 High St · 0.22 mi SE · Alteration or repairSep 28$375,000
-
Electrical Fire Alarm Work Associated with Tenant Fitout on the 16th Floor125 Summer St · 0.23 mi S · Fire systemsSep 28$5,800
-
Electrical Work Associated with Tenant fitout on the 16th Floor125 Summer St · 0.23 mi S · ElectricalSep 28$25,000
-
Minor modification to existing tenant1 Beacon St · 0.20 mi NW · ElectricalSep 25$18,520
-
Electrical Demo Work Associated With New Demo Scope For Future Tenant on the 23rd & 24th Floor75 State St · 0.20 mi NE · ElectricalSep 25$75,000
-
66 telecom drops on the 8th floor of 36-44 Broad St (40 Broad St) for tenant Addison Group Boston RS-26746536-44 Broad St · 0.25 mi NE · ElectricalSep 24$25,772
-
Addition of 11 fire alarm devices31-33 Kingston St · 0.21 mi S · ElectricalSep 24$3,500
-
Install low voltage cable and system components associated with an AV system upgrade at 225 Franklin Street…225 Franklin St · 0.20 mi E · ElectricalSep 24$284,859
-
New initiation device on the 1st floor lobby level for Spec Cafe at 75 State Street75 State St · 0.20 mi NE · Fire systemsSep 24$5,600
-
Repair unsound concrete at slab located at the entrance to the loading dock225 Franklin St · 0.20 mi E · Alteration or repairSep 21$1,986,208
-
F&I cat 6A (data & WAPs) cabling system100 Summer St · 0.20 mi S · ElectricalSep 21$15,000
-
Renovations to existing office space on the 26th & 27th floors for new offices1 Beacon St · 0.20 mi NW · Alteration or repairSep 21$1,500,000
-
Main Lobby - Renovation to correct leak from pipe in Main Lobby work includes removing and replacing effected…225 Franklin St · 0.20 mi E · Alteration or repairSep 18$68,000
-
Install waste, vent and water piping for new plumbing fixtures in basement of 176 Federal ST. Amenity unit172-180 Federal St · 0.23 mi SE · PlumbingSep 17$198,000
-
Masonry facade repairs, stone patching6-6b Beacon St · 0.21 mi NW · Alteration or repairSep 16$381,894
-
Replace Stone Panels, selective repointing of facade12-14a Beacon St · 0.25 mi NW · Alteration or repairSep 16$1,088,400
-
Installation of low voltage building automation @ 40 Broad St 8th Fl Addison Fitout36-44 Broad St · 0.25 mi NE · ElectricalSep 15$23,019
-
Electrical work associated with providing circuitry to new work stations225 Franklin St · 0.20 mi E · ElectricalSep 15$4,500
-
Removal of 1 wall to create larger room125 Summer St · 0.23 mi S · Fire systemsSep 15$77,839
-
Re-pointing of stone, parging of stone101-103 Summer St · 0.20 mi S · Alteration or repairSep 14$326,600
-
Two Kitchenette sinks with point of use water heaters100 Summer St · 0.20 mi S · PlumbingSep 14$15,000
-
Add 2 Low frequency horns to new bed rooms21-27 Temple Pl · 0.24 mi W · Fire systemsSep 10$3,800
-
Installing 6 sinks and 1 water heater25-55 Court St · 0.19 mi N · PlumbingSep 9$41,000
-
Modify existing fire alarm for 2nd floor right side change of use from barber shop to 2 bedroom condo21-27 Temple Pl · 0.24 mi W · Fire systemsSep 9$3,800
-
Interior renovation on 1st floor to create whitebox for future tenant172-180 Federal St · 0.23 mi SE · Alteration or repairSep 8$80,000
-
100 Summer Street - Jellyfish100 Summer St · 0.20 mi S · ElectricalSep 8$42,328
-
100 Summer Street - DCAMM100 Summer St · 0.20 mi S · ElectricalSep 8$139,810
-
Network wiring for Morgan and Morgan on the 11th floor155 Federal St · 0.19 mi S · ElectricalSep 4$8,500
-
Pull 58 new speaker wires, and 65 new data drops99 High St · 0.22 mi SE · ElectricalSep 4$25,000
-
Install ejector pump, waste piping36-44 Broad St · 0.25 mi NE · PlumbingSep 3$6,500
-
Basement Level: (2) Low voltage Thermostats for fan coils (2) Low Voltage Control Valves89-103 Bedford St · 0.23 mi S · ElectricalSep 3$1,784
-
Level 4 Low Voltage wiring to: 8 Thermostats89-103 Bedford St · 0.23 mi S · ElectricalSep 3$4,460
-
Renovation to the 6th Floor of 100 Summer for Simplisafe Engineering100 Summer St · 0.20 mi S · Fire systemsSep 3$41,000
-
Renovation to the 6th Floor of 100 Summer for Simplisafe Engineering100 Summer St · 0.20 mi S · ElectricalSep 3$150,000
-
Install new led sign 20 inches x233.5 inches lenth131-134 Tremont St · 0.22 mi W · SignSep 3$5,200
-
DraftKings - 2nd floor work includes relocation of sprinkler line & up to 9 heads for work being done under…225 Franklin St · 0.20 mi E · Fire systemsSep 1$15,000
-
26-094 OME is renovating theLobby Cafe' at 75 State Street which includes some new lighting / receptacles…75 State St · 0.20 mi NE · ElectricalSep 1$90,000
-
Unit 58 Existing bread house, new name 's Agann's Flatbread48-50 Winter St · 0.21 mi W · Alteration or repairAug 27$20,000
-
Extend existing walls to ceilings, paint and flooring31-33 Kingston St · 0.21 mi S · Alteration or repairAug 27$60,000
-
Redo Drain in 3 bay sink6-6b Beacon St · 0.21 mi NW · PlumbingAug 27$1,000
-
Install plumbing for bathroom, laundry sink,washer machine connection and floor drains31-33 Kingston St · 0.21 mi S · PlumbingAug 27$8,000
-
Sam Adams - Project #22060 - Install receptacle near patio door60 State St · 0.20 mi NE · ElectricalAug 27$1,550
-
Add the name '15 Broad' to an entrance canopy and the initials '15B' on the side of the building15-19 Broad St · 0.23 mi NE · SignAug 26$10,000
-
Install low voltage lighting controls with 20 switches89-103 Bedford St · 0.23 mi S · ElectricalAug 25$10,000
-
Install sinks, toilets, showers for new dorm rooms17 Court St · 0.19 mi N · PlumbingAug 24$63,300
-
Electrical scope associated with partial tenant renovations on the 8th floor of 40 Broad Street36-44 Broad St · 0.25 mi NE · ElectricalAug 24$110,000
-
Fire alarm scope associated with partial tenant renovations on the 8th floor36-44 Broad St · 0.25 mi NE · Fire systemsAug 21$12,000
-
Electrical and fire alarm renovation of corridors and rest rooms on 15th Floor125 Summer St · 0.23 mi S · Fire systemsAug 21$139,100
-
2nd floor renovation, addition of 4 offices31-33 Kingston St · 0.21 mi S · ElectricalAug 21$14,000
-
Electrical Fire Alarm work associated with tenant fitout on the 11th100 Summer St · 0.20 mi S · Fire systemsAug 20$95,000
-
Galaxy to relocate 3 card readers then fully commission doors of access control260 Franklin St · 0.21 mi E · ElectricalAug 19$8,000
-
Electrical work associated with tenant fitout on the 11th100 Summer St · 0.20 mi S · ElectricalAug 19$835,000
-
25 Court st, short form scope, change of occupancy from a25-55 Court St · 0.19 mi N · Alteration or repairAug 18$172,976
-
S26-834 - Data Dog - Connect modular workstation wiring to existing office circuitry225 Franklin St · 0.20 mi E · ElectricalAug 17$1,200
-
Scope of work is for the first floor fit out of a lobby cafe75 State St · 0.20 mi NE · Alteration or repairAug 17$458,586
-
Install rough & finish plumbing for 3 kitchen sinks & 2 water heaters89-103 Bedford St · 0.23 mi S · PlumbingAug 14$20,000
-
Installation of low voltage building automation @ 99 High St Fl 27 Planet Fitness99 High St · 0.22 mi SE · ElectricalAug 12$18,900
-
Furnish and install 5 cameras, 3 card readers, and 1 video intercom120-130 Water St · 0.22 mi NE · ElectricalAug 12$58,776
-
Removal of a conference room and adding four private offices with new lights155 Federal St · 0.19 mi S · ElectricalAug 12$46,000
-
Install new lighting fixtures, new receptacles and office furniture and wire 3 new air handlers89-103 Bedford St · 0.23 mi S · ElectricalAug 12$225,000
-
To make scope of work 3 phases and floors to be phased on ALT1823487 Phase 1 – 22nd floor Phase 2 – 23rd…225 Franklin St · 0.20 mi E · Alteration or repairAug 12$100
-
Disconnect and reconnect fire alarm from Kitchen Hood, microswitch100 City Hall Pz · 0.21 mi N · Fire systemsAug 11$850
-
Removed and replace existing fire suppression system in kind at the existing restaurant100 City Hall Pz · 0.21 mi N · Fire systemsAug 11$6,500
-
Reroof the main section of the roof in fully adhered EPDM89-103 Bedford St · 0.23 mi S · RoofingAug 10$249,760
-
Temporarily relocate existing generator to allow utility work for the Boston water and sewer improvements…52-58 Chauncy St · 0.22 mi SW · ElectricalAug 10$10,000
-
Interior space renovation on the 13th floor of One Beacon St. The scope includes selective demo1 Beacon St · 0.20 mi NW · Alteration or repairAug 10$3,687,217
-
Remove proviso 'Take out use granted to this petitioner only for this use only' BOA-436729/ALT42959241-45 Broad St · 0.22 mi NE · Alteration or repairAug 10not listed
-
234 Congress Street: Replace existing windows with new windows on floors 2218-230 Congress St · 0.24 mi SE · Alteration or repairAug 7$400,000
-
Adding a canopy to the new entrance doors per ALT1735101 & A178559715-19 Broad St · 0.23 mi NE · Alteration or repairAug 7$20,000
-
Removal of a conference room and the addition of (4) private offices in an existing office space on the 11th…155 Federal St · 0.19 mi S · Alteration or repairAug 6$144,938
-
Repair deteriorated masonry, including selective granite and natural stone repairs89-103 Bedford St · 0.23 mi S · Alteration or repairAug 6$391,910
-
To install 2 sinks and 1 water heater on the 8th Flr36-44 Broad St · 0.25 mi NE · PlumbingAug 6$20,000
-
8th Floor Office Tenant Space Renovation36-44 Broad St · 0.25 mi NE · Alteration or repairAug 6$899,740
-
Demolition of 1st floor tenant space to prepare for new tenant fitout121 High St · 0.22 mi SE · Alteration or repairAug 5$7,500
-
Installation of low voltage building automation @ 125 Summer St. Fl 15 Oxford125 Summer St · 0.23 mi S · ElectricalAug 5$4,700
-
Install new lighting fixtures, new receptacles89-103 Bedford St · 0.23 mi S · ElectricalAug 4$125,000
-
Security and Telecom installation 14th Floor260 Franklin St · 0.21 mi E · ElectricalAug 3$18,000
-
Network wiring for Acadian260 Franklin St · 0.21 mi E · ElectricalJul 31$8,000
-
CDM Smith Project #21799 - AV Upgrades75 State St · 0.20 mi NE · ElectricalJul 31$27,410
-
Fire Alarm Fit Out99 High St · 0.22 mi SE · Fire systemsJul 31$13,980
-
Fire Alarm Fit Out99 High St · 0.22 mi SE · ElectricalJul 31$13,980
-
Interior reno of existing restrooms and common area on 3rd floor172-180 Federal St · 0.23 mi SE · Alteration or repairJul 30$205,000
-
To install 1 sink, 1 WH, and 1 Floor drain on the 6th Flr100 Summer St · 0.20 mi S · PlumbingJul 30$41,000
-
Tenant Fit-Out for commercial offices15-19 Broad St · 0.23 mi NE · Alteration or repairJul 30$150,000
-
7.22.25 MODIFICATION TO PHASED APPROVAL TO: Build out of an existing restaurant100 City Hall Pz · 0.21 mi N · Alteration or repairJul 30$25,000
-
Installation of structured cabling system on 6th floor100 Summer St · 0.20 mi S · ElectricalJul 29$15,000
-
Demo and make safe of existing plumbing to pantry225 Franklin St · 0.20 mi E · PlumbingJul 28$2,200
-
Small renovations to an existing space at 99 Summer St 16th flr99 Summer St · 0.19 mi S · ElectricalJul 28$13,895
-
Fire escape repairs6-6b Beacon St · 0.21 mi NW · Alteration or repairJul 27$16,500
-
Renovation to existing plumbing to replace pantry sinks for CDM Smith75 State St · 0.20 mi NE · PlumbingJul 27$10,000
-
Oxford - 16th floor - demolition125 Summer St · 0.23 mi S · Fire systemsJul 27$200,000
-
Renovations to the common space corridor and restrooms on the 15th floor of 125 Summer St. Work includes…125 Summer St · 0.23 mi S · Alteration or repairJul 25$554,000
-
Renovation to the 27th floor for new tenant99 High St · 0.22 mi SE · Fire systemsJul 24$25,000
-
Renovation for new tenant space on the 14th floor260 Franklin St · 0.21 mi E · Fire systemsJul 24$25,000
-
Installation of 2 omni antennas one TTA45 High St · 0.23 mi SE · Alteration or repairJul 23$20,000
-
103 telecom drops on the 13th & 14th floors of 75 State Street for tenant White & Case - Swing Space CZ-26737075 State St · 0.20 mi NE · ElectricalJul 23$15,925
-
Repair main electrical feed to basement electrical panels at 6 Beacon Street6-6b Beacon St · 0.21 mi NW · ElectricalJul 23$12,000
-
Renovation for new tenant on the 27th floor99 High St · 0.22 mi SE · ElectricalJul 23$375,000
-
Renovation for new tenant on the 14th floor260 Franklin St · 0.21 mi E · ElectricalJul 23$330,000
-
Interior office renovation on the 6th floor of 99 Summer Street99 Summer St · 0.19 mi S · Alteration or repairJul 21$317,025
-
Fitout of Planet Fitness Exercise Space99 High St · 0.22 mi SE · PlumbingJul 21$77,000
-
Supply and install plumbing for office remodel99 High St · 0.22 mi SE · PlumbingJul 21$17,000
-
S26-710 - Electrician to connect modular furniture wiring to existing office circuitry99 High St · 0.22 mi SE · ElectricalJul 21$850
-
Supply and install plumbing for 7th floor office renovation consisting of kitchen sink and water heater99 High St · 0.22 mi SE · PlumbingJul 20$12,000
-
Low Voltage Wiring for Howard Stein 40 Broad Street36-44 Broad St · 0.25 mi NE · ElectricalJul 20$30,000
-
In vacant space on the 27th floor build out office for tenant99 High St · 0.22 mi SE · Alteration or repairJul 20$3,000,000
-
14th Floor remodel of existing office space260 Franklin St · 0.21 mi E · Alteration or repairJul 20$1,089,795
-
To provide temp power and distro for a watch party on July 19th 202630-42 Temple Pl · 0.21 mi W · ElectricalJul 17$3,500
-
Misc. Power Renovations to White and Case Swing space at 75 State 13th & 14th Floors75 State St · 0.20 mi NE · ElectricalJul 17$46,000
-
Demo and make safe electrical at furniture225 Franklin St · 0.20 mi E · ElectricalJul 17$1,500
-
Renovation to KP Law's existing plumbing to accommodate install new breakroom area260 Franklin St · 0.21 mi E · PlumbingJul 16$20,000
-
Installation of Access security devices at Broder Management LLC 15 Broad St Boston MA 02109 (100862042-10)15-19 Broad St · 0.23 mi NE · ElectricalJul 16$3,297
-
Installing fire alarm system at 21 Merchants Row AKA 45-47 Chatham Street45-47 Chatham St · 0.24 mi NE · Fire systemsJul 16$57,000
-
Bank of america signage rebrand: install (1) exterior grade temporary banner60 State St · 0.20 mi NE · SignJul 16$850
-
Plumbing connections to support an office fit out36-44 Broad St · 0.25 mi NE · PlumbingJul 15$32,000
-
Renovation of the 6th Floor of 100 Summer for Simplisafe / Jellyfish100 Summer St · 0.20 mi S · Fire systemsJul 14$90,000
-
Replace existing EST3 with a new model EST4 Level 1 Upgrade260 Franklin St · 0.21 mi E · Fire systemsJul 14$80,000
-
Spec. Suite - 29th floor work includes removal of existing partitions and ceiling construct new offices99 High St · 0.22 mi SE · Alteration or repairJul 14$676,000
-
Install (2) access control doors100 City Hall Pz · 0.21 mi N · ElectricalJul 13$8,000
-
Renovation to the 6th Floor of 100 Summer for Simplisafe / Jellyfish100 Summer St · 0.20 mi S · ElectricalJul 13$712,000
-
Partial 16th floor interior renovation to an existing office space99 Summer St · 0.19 mi S · Alteration or repairJul 10$54,007
-
Installation of low voltage building automation @ 99 High St., Floor 799 High St · 0.22 mi SE · ElectricalJul 10$7,400
-
Installation of low voltage building automation @ 99 High St.99 High St · 0.22 mi SE · ElectricalJul 10$8,700
-
Electrical Work Associated with Tenant Fitout on the 2nd Floor36-44 Broad St · 0.25 mi NE · ElectricalJul 9$5,000
-
Jul 9$105,000
-
40 Broad Street: Add new drywall partitions in basement fire pump room36-44 Broad St · 0.25 mi NE · Alteration or repairJul 9$160,000
-
Rough in a kitchen net on the 9th floor15-19 Broad St · 0.23 mi NE · PlumbingJul 8$3,500
This list shows the newest 300 of 551 permits. Pick a smaller circle or a later date to see the rest.
More on this streetArch St · 3 other addresses with permits
- 33 Arch St newest permit Sep 23, 2026
- 90-114 Arch St newest permit May 28, 2025
- 93-101 Arch St newest permit Sep 29, 2026
Boston Inspectional Services Department updated its data Oct 5, 2026. We checked it Oct 6, 12:55 UTC. See the city's official records.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near