Nearby Permits
Map of 122 permits within a quarter mile of 7-9 Thomas PkAlteration or repair, 415 W Fourth St, Oct 1, 2026Plumbing, 506 E Fourth St, Sep 30, 2026Plumbing, 342 W Third St, Sep 29, 2026Plumbing, 21 Thomas Pk, Sep 25, 2026Alteration or repair, 13 Gates St, Sep 25, 2026Alteration or repair, 284 Bowen St, Sep 24, 2026Plumbing, 368 E Eighth St, Sep 24, 2026Alteration or repair, 75 Old Harbor St, Sep 24, 2026Plumbing, 509-511 E Second St, Sep 23, 2026Alteration or repair, 9 Gates St, Sep 22, 2026Alteration or repair, 106 H St, Sep 22, 2026Alteration or repair, 13 Gates St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Plumbing, 430 E Eighth St, Sep 18, 2026Plumbing, 82 H St, Sep 18, 2026Electrical, 180 H St, Sep 18, 2026Alteration or repair, 541 E Fourth St, Sep 17, 2026Roofing, 6 G St, Sep 17, 2026Alteration or repair, 303 Bolton St, Sep 16, 2026Alteration or repair, 106 H St, Sep 10, 2026Electrical, 541 E Fourth St, Sep 10, 2026Alteration or repair, 449 E Fifth St, Sep 10, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Plumbing, 32a-32 Mercer St, Sep 8, 2026Electrical, 2 G St, Sep 8, 2026Other, 53 Thomas Pk, Sep 4, 2026Alteration or repair, 485 E Seventh St, Sep 3, 2026Electrical, 4 Springer St, Sep 3, 2026Alteration or repair, 2 G St, Aug 31, 2026Fence, wall or deck, 291 W Fifth St, Aug 31, 2026Roofing, 277 Silver St, Aug 28, 2026Alteration or repair, 507 E Fifth St, Aug 28, 2026Alteration or repair, 78 H St, Aug 27, 2026Alteration or repair, 13 Gates St, Aug 27, 2026Addition, 421 E Sixth St, Aug 27, 2026Electrical, 288 Bowen St, Aug 24, 2026Addition, 63 Telegraph St, Aug 24, 2026Alteration or repair, 32a-32 Mercer St, Aug 19, 2026Roofing, 498 E Sixth St, Aug 17, 2026Plumbing, 180 H St, Aug 17, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Plumbing, 180 H St, Aug 14, 2026Plumbing, 432-434 E Sixth St, Aug 14, 2026Alteration or repair, 75-77 Dorchester St, Aug 13, 2026Alteration or repair, 63 Telegraph St, Aug 7, 2026Electrical, 8 Atlantic St, Aug 5, 2026Electrical, 432-434 E Sixth St, Aug 4, 2026Plumbing, 58 Thomas Pk, Jul 31, 2026Electrical, 430 E Eighth St, Jul 31, 2026Alteration or repair, 503 E Fifth St, Jul 30, 2026Alteration or repair, 8 Atlantic St, Jul 30, 2026Alteration or repair, 61 Story St, Jul 30, 2026Plumbing, 58 Thomas Pk, Jul 29, 2026Alteration or repair, 32a-32 Mercer St, Jul 28, 2026Alteration or repair, 104 Old Harbor St, Jul 28, 2026Alteration or repair, 32a-32 Mercer St, Jul 27, 2026Roofing, 460 E Eighth St, Jul 27, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 39-43 Dorchester St, Jul 22, 2026Plumbing, 4 Springer St, Jul 21, 2026Plumbing, 30 Mercer St, Jul 17, 2026Plumbing, 135 I St, Jul 17, 2026Alteration or repair, 432-434 E Sixth St, Jul 16, 2026Roofing, 19 Mercer St, Jul 15, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 4 Jason Te, Jul 14, 2026Electrical, 470 E Sixth St, Jul 14, 2026Plumbing, 135 I St, Jul 13, 2026Electrical, 449 E Fifth St, Jul 13, 2026Electrical, 59 Gates St, Jul 9, 2026Alteration or repair, 21 Atlantic St, Jul 8, 2026Plumbing, 21 Atlantic St, Jul 8, 2026Plumbing, 34 Emerson St, Jul 7, 2026Plumbing, 260-262 Gold St, Jul 6, 2026Alteration or repair, 458-460 E Sixth St, Jun 26, 2026Plumbing, 59 Gates St, Jun 26, 2026Alteration or repair, 21 Thomas Pk, Jun 24, 2026Alteration or repair, 462 E Seventh St, Jun 23, 2026Plumbing, 477 E Fourth St, Jun 23, 2026Electrical, 477 E Fourth St, Jun 22, 2026Alteration or repair, 112 H St, Jun 22, 2026Alteration or repair, 43 Telegraph St, Jun 22, 2026Alteration or repair, 75 Old Harbor St, Jun 17, 2026Alteration or repair, 509r E Fifth St, Jun 16, 2026Alteration or repair, 380-380h E Eighth St, Jun 15, 2026Plumbing, 500 E Eighth St, Jun 12, 2026Plumbing, 500 E Eighth St, Jun 12, 2026Demolition, 75-77 Dorchester St, Jun 9, 2026Alteration or repair, 43 Telegraph St, Jun 8, 2026Alteration or repair, 59 Gates St, Jun 5, 2026Roofing, 70 G St, Jun 4, 2026Alteration or repair, 455 E Seventh St, Jun 4, 2026Alteration or repair, 5 Colebrook St, Jun 3, 2026Alteration or repair, 500 E Eighth St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Plumbing, 43 G St, Jun 1, 2026Electrical, 260-262 Gold St, Jun 1, 2026Electrical, 187 Dorchester St, Jun 1, 2026Alteration or repair, 490 E Seventh St, May 29, 2026Mechanical (HVAC), 9 Gates St, May 28, 2026Plumbing, 454-456 E Sixth St, May 28, 2026Plumbing, 187 Dorchester St, May 28, 2026Plumbing, 27 G St, May 26, 2026Alteration or repair, 416 E Seventh St, May 22, 2026Alteration or repair, 496 E Seventh St, May 22, 2026Plumbing, 72 G St, May 22, 2026Electrical, 66-68 Gates St, May 21, 2026Roofing, 69 Old Harbor St, May 18, 2026Plumbing, 449 E Fifth St, May 12, 2026Plumbing, 449 E Fifth St, May 12, 2026Electrical, 490 E Seventh St, May 11, 2026Alteration or repair, 25 Colebrook St, May 8, 2026Plumbing, 260-262 Gold St, May 6, 2026Plumbing, 260-262 Gold St, May 5, 2026Alteration or repair, 70 G St, May 4, 2026Alteration or repair, 260-262 Gold St, May 4, 2026Fire systems, 500 E Eighth St, May 4, 2026Electrical, 500 E Eighth St, May 4, 2026Alteration or repair, 469 E Sixth St, May 1, 2026Plumbing, 469 E Sixth St, May 1, 2026New building, 4 Springer St, Aug 10, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

7-9 Thomas Pk

Boston, MA 02127

The biggest project within a quarter mile since May 1: an $8.4M alteration or repair at 75-77 Dorchester St, permitted Aug 13.

Five permits on record here. The newest, Oct 31, 2024: Replace all rotted stair treads. Within a quarter mile, the city has issued 122 more permits (119 projects) since May 1. One is a new building, 0.24 mi away.

MayJunJulAugSepOct
Here5 permits · 7-9 Thomas Pk
  1. Oct 31, 2024$13,685
  2. Nov 2, 2023$70,150
  3. Apr 10, 2019$800
  4. Combi boiler install × 2 permits
    Plumbing
    Dec 1, 2014$3,000
Next doorunder 250 ft · 3 permits
  1. Strip and reroof
    70 G St · 200 ft E · Roofing
    Jun 4$8,900
  2. May 22$60,000
  3. May 4$15,012
This block250 to 1,000 ft · 63 permits in 62 projects
  1. Sep 30$500
  2. Remodeling
    21 Thomas Pk · 350 ft W · Plumbing
    Sep 25$4,000
  3. Gut renovation of existing building
    13 Gates St · 990 ft W · Alteration or repair
    Sep 25$625,000
  4. Shower pan
    368 E Eighth St · 940 ft SW · Plumbing
    Sep 24$3,000
  5. Amendment to ALT1856561
    75 Old Harbor St · 920 ft SW · Alteration or repair
    Sep 24$85,902
  6. Sep 22$9,500
  7. Clarify Occupancy as a Single Family Residence
    106 H St · 940 ft E · Alteration or repair
    Sep 22not listed
  8. Sep 18$2,000
  9. Sep 18$1,500
  10. Gas Boiler
    430 E Eighth St · 850 ft S · Plumbing
    Sep 18$1,000
  11. Sep 17$57,000
  12. Sep 17$19,000
  13. Sep 10$15,000
  14. Sep 10$5,100
  15. Confirm living space in basement
    449 E Fifth St · 610 ft E · Alteration or repair
    Sep 10$15,000
  16. Sep 8$1,200
  17. Sep 4$7,500
  18. 5 double hung replacement windows
    2 G St · 970 ft N · Alteration or repair
    Aug 31$7,800
  19. Aug 27not listed
  20. Aug 27not listed
  21. Aug 24$153,400
  22. Aug 14$5,500
  23. Aug 14$750
  24. Aug 13$8,406,316
  25. Aug 7$5,000
  26. Aug 5$1,400
  27. Aug 4$18,000
  28. Jul 31$500
  29. Jul 31$5,000
  30. Building a Partition Wall with Misc
    8 Atlantic St · 420 ft NW · Alteration or repair
    Jul 30$35,555
  31. Jul 30$12,000
  32. Jul 29$8,000
  33. Strip and re-roof
    460 E Eighth St · 960 ft SE · Roofing
    Jul 27$18,500
  34. Jul 16$169,848
  35. Installing Bryant 24K BTU Outdoor Unit × 2 permits
    4 Jason Te · 740 ft S · Electrical
    Jul 14$26,922
  36. Jul 14$1,000
  37. Jul 13$20,000
  38. Jul 8$16,121
  39. Jul 8$4,959
  40. Replace deck beam and hardware
    458-460 E Sixth St · 720 ft E · Alteration or repair
    Jun 26$11,946
  41. Jun 24$77,430
  42. Jun 23$10,000
  43. Jun 23$1,000
  44. 2 counter outlets
    477 E Fourth St · 420 ft NW · Electrical
    Jun 22$400
  45. Confirm occupancy of existing 3 family
    112 H St · 930 ft E · Alteration or repair
    Jun 22not listed
  46. Jun 17$85,902
  47. Jun 15$150,000
  48. Jun 9$50,000
  49. Replaced the siding, Lap Cement siding
    455 E Seventh St · 1,000 ft SE · Alteration or repair
    Jun 4$15,000
  50. Back deck replacement
    5 Colebrook St · 870 ft SE · Alteration or repair
    Jun 3$100,000
  51. Water heater @ 45
    43 G St · 320 ft N · Plumbing
    Jun 1$650
  52. Water heater replacement @ 45
    43 G St · 320 ft N · Plumbing
    Jun 1$650
  53. May 28$42,427
  54. May 28$9,500
  55. May 26$1,800
  56. May 22$5,500
  57. May 18$50,000
  58. May 12$12,000
  59. May 12$4,000
  60. May 8$300,000
  61. May 1$17,640
  62. May 1$2,500
Within a quarter mile1,000 ft to ¼ mi · 56 permits in 54 projects · 1 new building, $454,638
  1. Oct 1$39,000
  2. Sep 29$8,000
  3. Insulation &
    284 Bowen St · 0.21 mi W · Alteration or repair
    Sep 24$3,887
  4. Sep 23$2,500
  5. Sep 18$1,500
  6. Sep 18$30,000
  7. Gut remodel bathroom - existing layout
    303 Bolton St · 0.21 mi N · Alteration or repair
    Sep 16$27,000
  8. Sep 8$18,500
  9. 2 HVAC, 2 stove
    32a-32 Mercer St · 0.22 mi W · Plumbing
    Sep 8$4,000
  10. Remove and replace 9 windows, as existing
    485 E Seventh St · 0.22 mi SE · Alteration or repair
    Sep 3$97,340
  11. 100 amp temp service
    4 Springer St · 0.24 mi SE · Electrical
    Sep 3$2,000
  12. Remove and replace 1 window
    291 W Fifth St · 0.20 mi W · Fence, wall or deck
    Aug 31$10,612
  13. Aug 28$12,000
  14. Aug 28not listed
  15. Aug 27$4,000
  16. Aug 24$2,500
  17. Aug 19$450,000
  18. Aug 17$10,000
  19. New plumbing for (3) condos
    180 H St · 0.22 mi SE · Plumbing
    Aug 17$30,000
  20. Gas piping for (3) stoves
    180 H St · 0.22 mi SE · Plumbing
    Aug 14$5,000
  21. Aug 10$454,638
  22. Jul 30$9,500
  23. Confirm occupancy of existing 2 family.
    32a-32 Mercer St · 0.22 mi W · Alteration or repair
    Jul 28not listed
  24. Jul 28$300,000
  25. Jul 27$32,000
  26. Jul 22$2,500
  27. Jul 21$30,000
  28. Emergency permit
    30 Mercer St · 0.22 mi W · Plumbing
    Jul 17$9,500
  29. Supply gas to Navien Combi
    135 I St · 0.24 mi E · Plumbing
    Jul 17$1,000
  30. Jul 15$46,100
  31. Install navien combi
    135 I St · 0.24 mi E · Plumbing
    Jul 13$5,000
  32. Install mini-split
    59 Gates St · 0.22 mi SW · Electrical
    Jul 9$10,000
  33. Gas furnace replacement
    34 Emerson St · 0.23 mi NE · Plumbing
    Jul 7$10,000
  34. Jul 6$2,500
  35. Kitchen and laundry remodel
    59 Gates St · 0.22 mi SW · Plumbing
    Jun 26$4,500
  36. Jun 22$13,000
  37. Jun 16$110,000
  38. Jun 12$12,000
  39. Gas range
    500 E Eighth St · 0.22 mi SE · Plumbing
    Jun 12$1,500
  40. Jun 8$44,988
  41. Remodel kitchen
    59 Gates St · 0.22 mi SW · Alteration or repair
    Jun 5$27,000
  42. Cosmetic renovations of apartment 1
    500 E Eighth St · 0.22 mi SE · Alteration or repair
    Jun 1$86,000
  43. Jun 1$30,000
  44. Bathroom reno
    187 Dorchester St · 0.24 mi W · Electrical
    Jun 1$1,500
  45. May 29$14,488
  46. May 28$3,000
  47. May 22$52,000
  48. May 21$900
  49. May 11$4,829
  50. Disconnect stove
    260-262 Gold St · 0.22 mi NW · Plumbing
    May 6not listed
  51. May 5$5,000
  52. Light renovation of interior of unit 301
    260-262 Gold St · 0.22 mi NW · Alteration or repair
    May 4$500,000
  53. May 4$1,500
  54. May 4$8,000

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 15:29 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near