- Searched address
- New building
- Addition or alteration
- Electrical, plumbing, HVAC
- Roof, fence, sign, facade
- Demolition
- Paperwork or other
- Zoning request
81-85a L St
Boston, MA 02127
- Zoning hearing
- Nov 5, for 748 to 750 E Broadway, 450 ft north. Zoning requests nearby
- At this address
- 15 permits on record. Newest issued Sep 15: Rough water waste and vent for a small bath and a half bath
- Within ¼ mile
- 137 more permits (134 projects) issued since May 1. 2 are for new buildings, the nearest 920 ft away.
- Teardown, rebuild
- 595 E Seventh St: demolition permitted Jul 30, a new building Sep 14.
-
Sep 15$25,000
-
Change occupancy from restaurantAlteration or repairSep 15$500,000
-
Existing restaurant expansion - extend initiating and notification circuits into new spaceFire systemsSep 10$14,500
-
Exploratory demo to review structure and removal of trashAlteration or repairSep 8$7,500
-
Aug 25 to 27$10,000
-
Aug 11$20,000
-
Repairing the structural beam inside new H&R Block space - ALT1755521Alteration or repairFeb 12$28,000
-
Tenant fit up of existing spaceElectricalOct 27, 2025$22,000
-
Oct 16, 2025$5,000
-
Oct 7, 2025$22,000
-
Interior tenant fit out for a new H&;R Block tax officeAlteration or repairAug 26, 2025$150,000
-
Aug 25, 2025$6,252
-
Install (1) dishwasher circuit 120v 20aElectricalJun 20, 2011$3,600
-
Application sf64458 issued 2/16/11 for partial demo and refit for existing restaurant($31,500)Alteration or repairJun 9, 2011not listed
-
1. Remove existing roof down to wooden substrate245-247 Emerson St · 230 ft W · RoofingSep 8$26,500
-
Reconnect small cell electrical service at 7 L street for crown castle69-71 L St · 250 ft N · ElectricalAug 18$3,000
-
Rewire two bedrooms apartment one kitchen one bathroom289-291 Emerson St · 220 ft E · ElectricalAug 11$8,800
-
Residential weatherization/air sealing620 E Fifth St · 180 ft S · Alteration or repairJul 8$8,000
-
Renovate kitchen and bath in each unit, carpentry and paint throughout289-291 Emerson St · 220 ft E · Alteration or repairJun 9$60,000
-
Confirm occupancy as an existing 2 family dwelling289-291 Emerson St · 220 ft E · Alteration or repairJun 4not listed
-
Replace water heater in basement723 E Fourth St · 45 ft NW · PlumbingMay 4$1,800
-
Remove the old deck on the first and second floors630 E Third St · 830 ft N · Alteration or repairOct 8$27,700
-
Residential weatherization/air sealing45 M St · 930 ft NE · Alteration or repairOct 8$4,000
-
Demo finishes to existing bath685-685g E Fifth St · 880 ft E · Alteration or repairOct 1$49,157
-
National Grid shut off meter - replace pipe where it's leaking328 K St · 860 ft SW · PlumbingSep 30$500
-
Install 1 replacement entry door - no structural work Work to be done at 183 L Street185 L St · 890 ft S · Alteration or repairSep 28$2,816
-
Service upgrade to 400 AMP service - Kitchen remodel 1st floor unit & 2nd floor unit3 Beckler Av · 540 ft SW · ElectricalSep 25$27,500
-
Replace decking and railings on front stairs w/ new pvc decking and composite railings535 E Fifth St · 970 ft W · Alteration or repairSep 17$8,040
-
Construct new 3-story, 5-unit residential building with elevator595 E Seventh St · 920 ft S · New buildingSep 14$2,484,000
-
Kitchen/bath plumbing647 E Third St · 780 ft NE · PlumbingSep 10$3,000
-
Gas piping for stove647 E Third St · 780 ft NE · PlumbingSep 10$500
-
Confirm occupancy of existing 2 Family660 E Fifth St · 450 ft E · Alteration or repairSep 9not listed
-
Installation of fire alarm system throught 3 units and basement656 E Fifth St · 400 ft SE · Fire systemsSep 8$3,000
-
Complete renovation upgrade electrical service and receptacles and lighting658 E Fifth St · 430 ft SE · ElectricalSep 4$20,000
-
2 electric water heaters in basement 1st floor - plumbing work - kitchen sink3 Beckler Av · 540 ft SW · PlumbingSep 3$13,800
-
Kitchen Remodel Relocate existing Half Bath647 E Third St · 780 ft NE · ElectricalSep 2$9,800
-
Remove and install new kitchen cabinets and counters3 Beckler Av · 540 ft SW · Alteration or repairAug 27$25,000
-
Remodel kitchen sink, half bathroom and full bathroom13 Beckler Av · 490 ft SW · PlumbingAug 27$8,000
-
Install gas stove13 Beckler Av · 490 ft SW · PlumbingAug 27$1,000
-
Renovate kitchen and powder room647 E Third St · 780 ft NE · Alteration or repairAug 19$35,000
-
Furnace replacement at 659 as 657 does not appear in the address tab657 E Seventh St · 970 ft SE · PlumbingAug 19$8,000
-
10 Replacement Windows282 K St · 510 ft SW · Alteration or repairAug 17$17,700
-
Power feed to existing DAS node location (streetlight)34-38 L St · 950 ft N · ElectricalAug 17$15,000
-
Install hardwood flooring, R&R staircase risers13 Beckler Av · 490 ft SW · Alteration or repairAug 13$88,900
-
Change of occupancy to 6 (reduced to 4 unit);dwelling562 E Fifth St · 640 ft W · Alteration or repairAug 13$1,500,000
-
Installation of code-required receptacles582 E Seventh St · 860 ft SW · ElectricalAug 11$5,800
-
Grill fire pit144 M St · 880 ft SE · PlumbingAug 10$2,000
-
Chimney repair660 E Fifth St · 450 ft E · Alteration or repairAug 7$29,000
-
Remove all plaster, lathes, doors590 E Seventh St · 830 ft S · Alteration or repairAug 5$40,000
-
Confirm Occupancy of existing single family home122 M St · 720 ft SE · Alteration or repairAug 3not listed
-
Install plumbing for 6 bath three kitchen550 E Fifth St · 810 ft W · PlumbingJul 31$40,000
-
Demolition of existing 2 family structure595 E Seventh St · 920 ft S · DemolitionJul 30$20,000
-
Pending;ALT1875646 Occupancy Committee.Requesting SF permit for select interior demo122 M St · 720 ft SE · Alteration or repairJul 28$10,000
-
Light renovation582 E Seventh St · 860 ft SW · Alteration or repairJul 17$30,000
-
Remove and replace roofing, doors & windows782 E Fourth St · 970 ft E · RoofingJul 16$294,500
-
Non-structural interior demolition of existing structure562 E Fifth St · 640 ft W · Alteration or repairJul 16$25,000
-
Jul 16$7,000
-
Jul 16$7,500
-
Remove & replace 1 patio door: like for like size703 E Fifth St · 1,000 ft E · Alteration or repairJul 14$7,515
-
Install new 30 inch free standing gas stove309-311 Emerson St · 400 ft E · PlumbingJul 14$500
-
Swapping out 2 panels and redoing a bathroom13 Beckler Av · 490 ft SW · ElectricalJul 14$5,000
-
1.; Extend living space to basement w/ no structural change (see plans).2.550 E Fifth St · 810 ft W · Alteration or repairJul 13$35,000
-
Correct to verbiage on original Long form658 E Fifth St · 430 ft SE · Alteration or repairJul 13$5,000
-
Siding and dec repairs5 Viking St · 990 ft S · Alteration or repairJul 7$46,333
-
Remodel / 25 recessed lights / changing outlets / adding outlets & switches / hanging fixtures309-311 Emerson St · 400 ft E · ElectricalJul 7$3,000
-
Roof deck gfci receptacle146h-146 M St · 900 ft SE · ElectricalJul 6$1,500
-
Confirm occupancy as Single-Family Dwelling671 E Sixth St · 790 ft SE · Alteration or repairJul 2$500,000
-
Disconnect old gas range and connect new range49 L St · 790 ft N · PlumbingJul 1$500
-
Remodel bathroom, remodel half-bath309-311 Emerson St · 400 ft E · PlumbingJun 30$10,000
-
Gas stove593 E Fifth St · 390 ft SW · PlumbingJun 18$250
-
New gas piping to the following items597 E Sixth St · 630 ft SW · PlumbingJun 16$5,000
-
Remodel master and guest bathrooms99-101 M St · 550 ft E · PlumbingJun 9$3,900
-
Remove and dispose of existing wood decking and railing685-687 E Sixth St · 930 ft SE · Alteration or repairJun 8$10,000
-
Chimney Repointing & Repair Loose Brick VIOLATION# V892837325 K St · 890 ft SW · Alteration or repairJun 4$3,400
-
Change of Occupancy from 1-FAM to 2-FAM658 E Fifth St · 430 ft SE · Alteration or repairJun 1$828,300
-
Relocate piping to outside meter bars for relocation of gas meters and tes591 E Sixth St · 670 ft SW · PlumbingMay 27$1,500
-
Install State 40 Gallon Gas Hot Water Heater in the Basement137 M St · 730 ft SE · PlumbingMay 26$1,500
-
Install State, 40 Gallon, Gas Hot Water Heater in the Basement137 M St · 730 ft SE · PlumbingMay 26$1,500
-
Replace rotted trim on the exterior and paint the street facing sides of the building191 K St · 940 ft NW · Alteration or repairMay 20$49,500
-
Install low voltage alarm system consisting of only burglary devices in Units 1 and 2611 E Seventh St · 880 ft S · ElectricalMay 20$2,200
-
Re wire ofn2 family including new service550 E Fifth St · 810 ft W · ElectricalMay 20$20,000
-
# 6 Master & Guest Bathroom remodels - to include demo99-101 M St · 550 ft E · Alteration or repairMay 19$66,710
-
Finish only 3rd floor bathroom267 K St · 540 ft W · PlumbingMay 15$2,000
-
Install one backflow preventer in Unit 1 for boiler replacement191 L St · 990 ft S · PlumbingMay 12$500
-
Re-venting water tanks what were backdrafting596 E Sixth St · 560 ft SW · PlumbingMay 12$1,000
-
Replace boiler serving Unit 1191 L St · 990 ft S · PlumbingMay 11$13,000
-
60 amp service to feed monitoring cabinet for natural gas760 E Fourth St · 490 ft E · ElectricalMay 8$10,000
-
Disconnect and reconnect outside electrical meter for siding work645 E Sixth St · 650 ft SE · Alteration or repairMay 8$800
-
Replace 4 windows620 E Seventh St · 770 ft S · Alteration or repairMay 5$6,757
-
Bathroom remodel on 2nd floor663 E Seventh St · 990 ft SE · PlumbingMay 4$5,000
-
Kitchen reno593 E Fifth St · 390 ft SW · ElectricalMay 4$5,500
-
Replace water heater in basement156 K St · 0.22 mi NW · PlumbingOct 7$1,800
-
Reconnect gas to water heater in basement156 K St · 0.22 mi NW · PlumbingOct 7$400
-
713 east 6th fixture change703-705 E Sixth St · 0.21 mi SE · PlumbingOct 5$3,000
-
Test gas pipe to make sure there is no leak.167 K St · 0.21 mi NW · PlumbingSep 23$3,000
-
Sep 15 to 21$1,637
-
Right side of the building - repoint bricks and rebuild bowing part518 E Sixth St · 0.23 mi SW · Alteration or repairSep 15$16,500
-
Replace gas boiler with same style Hot water, single zone natural gas528 E Third St · 0.21 mi NW · PlumbingSep 13$2,600
-
Install chimney liner plus partial chimney patching and pointing167 K St · 0.21 mi NW · RoofingSep 10$10,560
-
Rewire first floor apartment add public meter158 I St · 0.25 mi SW · ElectricalSep 4$18,000
-
Renovate 2 baths, kitchen and laundry158 I St · 0.25 mi SW · PlumbingSep 1$15,000
-
3rd floor kitchen renovation adding laundry to kitchen and adding sink and toilet to bathroom132-134 Emerson St · 0.24 mi W · PlumbingSep 1$6,000
-
Amendment to ALT1782055 Change cellar stair run to accommodate new kitchen layout569 E Seventh St · 0.20 mi SW · Alteration or repairSep 1$40,000
-
Replace electrical meter socket and install 2 baseboard heaters190 L St · 0.20 mi S · ElectricalAug 31$6,000
-
Panel Upgrade, bathroom fan swap132-134 Emerson St · 0.24 mi W · ElectricalAug 28$5,000
-
Install wiring for AC system Install new light fixtures Remove as much old AC cable517-519 E Third St · 0.21 mi NW · ElectricalAug 27$10,000
-
Replace existing shower valve and drain with new shower valve and drain525 E Sixth St · 0.23 mi SW · PlumbingAug 26$1,895
-
Remove and replace the existing windows703-705 E Sixth St · 0.21 mi SE · Alteration or repairAug 19$11,500
-
Replace tub to shower132-134 Emerson St · 0.24 mi W · PlumbingAug 17$1,500
-
Install new addressable fire alarm system for 4 residential units190 L St · 0.20 mi S · Fire systemsAug 17$10,000
-
Install 55 sf of insulation and drywall for bathroom ceiling722 E Second St · 0.21 mi N · Alteration or repairAug 14$2,700
-
New Gas work for renovation on single family530 E Seventh St · 0.24 mi SW · PlumbingJul 31$15,000
-
Plumbing for renovation on single family530 E Seventh St · 0.24 mi SW · PlumbingJul 29$15,000
-
Replacement of top-most roof system and removal of entire chimney617 E Eighth St · 0.23 mi S · RoofingJul 28$28,688
-
The purpose of this application is to confirm occupancy as existing single family residence530 E Seventh St · 0.24 mi SW · Alteration or repairJul 21not listed
-
Supply gas to Navien Combi135 I St · 0.24 mi W · PlumbingJul 17$1,000
-
Change of occupancy from a 3 family dwelling to a 4 family dwelling by way of legalizing the existing…190 L St · 0.20 mi S · Alteration or repairJul 15$45,000
-
Pending;ALT1865386 Occupancy Committee.Gut existing single family to studs530 E Seventh St · 0.24 mi SW · Alteration or repairJul 14$300,000
-
New roof, siding, and windows522 E Fifth St · 0.20 mi W · RoofingJul 13$40,000
-
Install navien combi135 I St · 0.24 mi W · PlumbingJul 13$5,000
-
Tub to shower conversion132-134 Emerson St · 0.24 mi W · OtherJul 8$18,000
-
Install new shower valve & drain618 E Second St · 0.25 mi NW · PlumbingJul 8$3,000
-
Remodel 2 bathrooms, laundry closet and kitchen815 E Fourth St · 0.23 mi E · PlumbingJul 8$5,000
-
Service upgrade 200 to 400517-519 E Third St · 0.21 mi NW · ElectricalJul 7$10,000
-
Scope of work &158 I St · 0.25 mi SW · Alteration or repairJul 1$95,000
-
On vacant lot, erect new 4-story526 E Third St · 0.21 mi NW · New buildingJul 1not listed
-
Remove existing tiles, and retile around shower618 E Second St · 0.25 mi NW · Alteration or repairJun 29$39,150
-
Replace wiring through area of unit that experienced water damage722 E Second St · 0.21 mi N · ElectricalJun 22$800
-
Install Rinnai Combination Gas Boiler in a Second Floor616 E Fourth St · 0.23 mi W · PlumbingJun 18$3,500
-
Install Rinnai Combination Gas Boiler in a Second Floor Mechanical Room616 E Fourth St · 0.23 mi W · PlumbingJun 18$3,500
-
In their 1st floor bathroom we are replacing their bath vent fan combo & installing a vanity light bar132-134 N St · 0.24 mi E · ElectricalJun 9$3,350
-
I.E Install 4 double hung windows690 E Eighth St · 0.22 mi SE · Alteration or repairJun 8$5,259
-
Installation of a Custom Comfort 18,000 BTU Xtreme Heat Pump Unit9-11 Linley Te · 0.22 mi NW · Mechanical (HVAC)Jun 8$12,273
-
Gas furnace replacement211 L St · 0.23 mi S · PlumbingJun 5$6,500
-
New GFCI - New dedicated circuit9-11 Linley Te · 0.22 mi NW · ElectricalJun 5$1,050
-
Drain line repair725 E Sixth St · 0.23 mi SE · PlumbingJun 4$1,500
-
D strip old siding and install new trim and siding526-526r E Fifth St · 0.19 mi W · Alteration or repairJun 1$11,500
-
Disconnect wiring of existing house and complete new wiring for the new single family house569 E Seventh St · 0.20 mi SW · ElectricalMay 26$27,000
-
Installing a 50 point addressable fire alarm system, Installing Fire517-519 E Third St · 0.21 mi NW · Fire systemsMay 23$68,915
-
Remodeling670 E Eighth St · 0.21 mi S · PlumbingMay 15$3,000
-
Change occupancy of ground floor850-852 Summer St · 0.21 mi N · Alteration or repairMay 15$20,000
-
Re wire unit 1/2517-519 E Third St · 0.21 mi NW · ElectricalMay 14$36,000
-
Repair front stairs & railings, demo 8x12 shed from rear yard210 L St · 0.25 mi S · Alteration or repairMay 8$5,000
-
Bathroom update, new fan, 3 4" wafers, whirlpool circuit720 E Eighth St · 0.25 mi SE · ElectricalMay 7$1,500
-
Install new low voltage fire alarm system based on fire alarm plans submitted670 E Eighth St · 0.21 mi S · Fire systemsMay 6$15,000
-
Adding exterior wall packs on the side of the building571-573 E First St · 0.24 mi N · ElectricalMay 6$13,550
-
EPDM roof replacement - strip existing roof to decking - inspect decking and replace as need -install…5 Emmet St · 0.22 mi NW · RoofingMay 4$16,700
-
Wire entire 3 units670 E Eighth St · 0.21 mi S · ElectricalMay 4$45,000
Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.
Boston's decision codes, from its data dictionary: AppProv, "approved with conditions".
-
Zoning appeal: "Int. fitout of ground floor shell comm space: framing elec HVAC plum FA FP"
Hearing Nov 5 at the Zoning Board of Appeal; details on the city's appeal tracker.
Hearing Nov 5filed Jul 15 -
Zoning appeal: "Updated scope of work by applicant 3.3.26: "demolish existing 1-story garage on separate…"
Hearing Nov 10 at the Zoning Board of Appeal; details on the city's appeal tracker.
Hearing Nov 10filed Aug 11 -
Filed Sep 29
-
Filed Sep 27
-
Filed Sep 21
-
Filed Aug 7
-
Hearing date Dec 4, 2025filed Aug 14, 2025
-
Filed Apr 9, 2025
-
Decided Sep 18hearing Sep 8
-
Zoning appeal: "CHANGE OF USE AND OCCUPANCY OF EXISTING DETACHED TWO STORY…"722r E Eighth St · 0.24 mi SE · Approved · city: "Appeal Closed", decision "Approved" · case BOA1820617Decided Sep 18hearing Sep 8
-
Decided Aug 21hearing Aug 11
-
Decided Aug 7hearing Jul 28
-
To change the occupancy from two family to single family590 E Eighth St · 0.24 mi SW · Approved · city: "Appeal Closed", decision "Approved" · case BOA1838243Decided Jul 24hearing Jul 14
-
To change occupancy from single-family and store, to a two-family…682 to 684 E Fifth St · 730 ft E · Approved · city: "Appeal Closed", decision "Approved" · case BOA1823198Decided Jul 17hearing Jun 11
-
Zoning appeal; the city gives no description.744 E Fourth St · 310 ft NE · Approved · city: "Appeal Closed", decision "Approved" · case BOA1850007Decided Jun 26hearing Jun 16
-
Zoning appeal; the city gives no description.595 E Seventh St · 920 ft S · Approved · city: "Appeal Closed", decision "Approved" · case BOA1850006Decided Jun 26hearing Jun 16
-
To raze existing 4 Unit Dwelling and replace with new 4 Story, 6-Unit Building with Garage parking…744 E Fourth St · 310 ft NE · Approved · city: "Appeal Closed", decision "AppProv" · case BOA1774632Decided May 15hearing Apr 28
Boston Inspectional Services Department updated its data Oct 9, 2026. We checked it Oct 11, 22:16 UTC. See the city's official records.
Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 11, 17:17 UTC.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning