Nearby Permits
Map of 171 permits within a quarter mile of 63 E Lake StAlteration or repair, 150 N Michigan Ave, Oct 2, 2026Alteration or repair, 307 N Michigan Ave, Oct 2, 2026Electrical, 25 N Michigan Ave, Oct 1, 2026Electrical, 201 E Randolph St, Oct 1, 2026Scaffold or sidewalk shed, 111 N Dearborn St, Oct 1, 2026Alteration or repair, 1 E Wacker Dr, Sep 29, 2026Electrical, 201 E Randolph St, Sep 28, 2026Alteration or repair, 130 E Randolph St, Sep 28, 2026Electrical, 1 E Wacker Dr, Sep 25, 2026Electrical, 205 N Michigan Ave, Sep 22, 2026Fire systems, 1 E Wacker Dr, Sep 22, 2026Alteration or repair, 200 E Randolph St, Sep 22, 2026Alteration or repair, 200 E Randolph St, Sep 21, 2026Alteration or repair, 190 N State St, Sep 17, 2026Scaffold or sidewalk shed, 203 N Wabash Ave, Sep 16, 2026Alteration or repair, 203 N Wabash Ave, Sep 16, 2026Fire systems, 307 N Michigan Ave, Sep 15, 2026Alteration or repair, 180 N Stetson Ave, Sep 15, 2026Electrical, 1 E Wacker Dr, Sep 14, 2026Electrical, 150 N Michigan Ave, Sep 9, 2026Alteration or repair, 300 N State St, Sep 9, 2026Alteration or repair, 130 E Randolph St, Sep 9, 2026Sign, 304 N Michigan Ave, Sep 4, 2026Fire systems, 150 N Michigan Ave, Sep 3, 2026Electrical, 35 W Wacker Dr, Sep 2, 2026Electrical, 35 W Wacker Dr, Sep 2, 2026Alteration or repair, 1 E Wacker Dr, Sep 2, 2026Alteration or repair, 1 E Wacker Dr, Sep 2, 2026Electrical, 25 N Michigan Ave, Sep 1, 2026Electrical, 201 E Randolph St, Sep 1, 2026Electrical, 150 N Michigan Ave, Aug 31, 2026Sign, 304 N Michigan Ave, Aug 31, 2026Sign, 304 N Michigan Ave, Aug 31, 2026Sign, 304 N Michigan Ave, Aug 31, 2026Sign, 304 N Michigan Ave, Aug 31, 2026Sign, 304 N Michigan Ave, Aug 31, 2026Fence, wall or deck, 201 E Randolph St, Aug 28, 2026Alteration or repair, 1 E Wacker Dr, Aug 28, 2026Electrical, 150 N Michigan Ave, Aug 27, 2026Electrical, 130 E Randolph St, Aug 27, 2026Electrical, 225 N Michigan Ave, Aug 26, 2026Alteration or repair, 66 E Washington St, Aug 26, 2026Electrical, 130 E Randolph St, Aug 25, 2026Scaffold or sidewalk shed, 8 E Randolph St, Aug 25, 2026Electrical, 200 E Randolph St, Aug 25, 2026Alteration or repair, 1 E Wacker Dr, Aug 25, 2026Alteration or repair, 333 N Michigan Ave, Aug 25, 2026Electrical, 200 E Randolph St, Aug 24, 2026Electrical, 150 N Michigan Ave, Aug 24, 2026Electrical, 55 E Washington St, Aug 24, 2026Other, 130 E Randolph St, Aug 20, 2026Other, 54 E Randolph St, Aug 20, 2026Electrical, 201 E Randolph St, Aug 19, 2026Electrical, 333 N Michigan Ave, Aug 19, 2026Elevator, 130 E Randolph St, Aug 19, 2026Electrical, 111 N State St, Aug 18, 2026Sign, 173 N Michigan Ave, Aug 14, 2026Plumbing, 333 N Michigan Ave, Aug 13, 2026Other, 333 N Michigan Ave, Aug 13, 2026Fire systems, 35 E Wacker Dr, Aug 13, 2026Alteration or repair, 1 E Wacker Dr, Aug 13, 2026Alteration or repair, 330 N Wabash Ave, Aug 11, 2026Fire systems, 225 N Michigan Ave, Aug 8, 2026Fire systems, 1 E Wacker Dr, Aug 6, 2026Elevator, 22 W Washington St, Aug 5, 2026Alteration or repair, 35 E Wacker Dr, Aug 5, 2026Fire systems, 130 E Randolph St, Aug 4, 2026Fire systems, 180 N Stetson Ave, Aug 4, 2026Electrical, 225 N Michigan Ave, Aug 3, 2026Sign, 304 N Michigan Ave, Aug 3, 2026Sign, 304 N Michigan Ave, Aug 3, 2026Electrical, 1 E Wacker Dr, Jul 31, 2026Alteration or repair, 360 N Michigan Ave, Jul 31, 2026Electrical, 25 N Michigan Ave, Jul 28, 2026Electrical, 201 E Randolph St, Jul 28, 2026Fire systems, 88 E Wacker Dr, Jul 27, 2026Fire systems, 360 N Michigan Ave, Jul 27, 2026Electrical, 201 E Randolph St, Jul 23, 2026Fire systems, 1 E Wacker Dr, Jul 22, 2026Alteration or repair, 1 E Wacker Dr, Jul 21, 2026Mechanical (HVAC), 35 N State St, Jul 20, 2026Alteration or repair, 180 N Stetson Ave, Jul 20, 2026Alteration or repair, 300 N Michigan Ave, Jul 20, 2026Electrical, 130 E Randolph St, Jul 16, 2026Electrical, 300 N Michigan Ave, Jul 15, 2026Alteration or repair, 30 N Michigan Ave, Jul 15, 2026Electrical, 130 E Randolph St, Jul 14, 2026Fire systems, 150 N Michigan Ave, Jul 14, 2026Alteration or repair, 205 N Michigan Ave, Jul 14, 2026Scaffold or sidewalk shed, 175 N State St, Jul 13, 2026Alteration or repair, 225 N Wabash Ave, Jul 13, 2026Fire systems, 225 N Michigan Ave, Jul 10, 2026Electrical, 25 E Washington St, Jul 9, 2026Fire systems, 130 E Randolph St, Jul 9, 2026Alteration or repair, 333 N Michigan Ave, Jul 9, 2026Electrical, 225 N Michigan Ave, Jul 8, 2026Elevator, 201 N State St, Jul 8, 2026Alteration or repair, 150 N Michigan Ave, Jul 7, 2026Fire systems, 130 E Randolph St, Jul 6, 2026Fire systems, 150 N Michigan Ave, Jul 1, 2026Elevator, 360 N Michigan Ave, Jul 1, 2026Alteration or repair, 73 E Lake St, Jun 30, 2026Alteration or repair, 73 E Lake St, Jun 30, 2026Electrical, 201 E Randolph St, Jun 29, 2026Electrical, 25 N Michigan Ave, Jun 29, 2026Alteration or repair, 73 E Lake St, Jun 29, 2026Sign, 145 N Michigan Ave, Jun 29, 2026Fire systems, 130 E Randolph St, Jun 26, 2026Electrical, 150 N Michigan Ave, Jun 24, 2026Alteration or repair, 130 E Randolph St, Jun 24, 2026Alteration or repair, 35 E Wacker Dr, Jun 24, 2026Electrical, 201 E Randolph St, Jun 23, 2026Fire systems, 225 N Michigan Ave, Jun 23, 2026Elevator, 230 N Michigan Ave, Jun 22, 2026Fire systems, 130 E Randolph St, Jun 18, 2026Sign, 205 N Michigan Ave, Jun 16, 2026Sign, 205 N Michigan Ave, Jun 16, 2026Sign, 205 N Michigan Ave, Jun 16, 2026Mechanical (HVAC), 58 E Lake St, Jun 15, 2026Fire systems, 25 E Washington St, Jun 15, 2026Fire systems, 35 E Wacker Dr, Jun 15, 2026Fire systems, 35 E Wacker Dr, Jun 15, 2026Fire systems, 35 E Wacker Dr, Jun 11, 2026Fire systems, 150 N State St, Jun 10, 2026Fire systems, 150 N Michigan Ave, Jun 10, 2026Elevator, 111 N State St, Jun 10, 2026Electrical, 111 N State St, Jun 9, 2026Alteration or repair, 35 W Wacker Dr, Jun 9, 2026Alteration or repair, 1 E Wacker Dr, Jun 9, 2026Electrical, 55 E Washington St, Jun 8, 2026Fence, wall or deck, 201 E Randolph St, Jun 7, 2026Electrical, 150 N State St, Jun 4, 2026Elevator, 128 N State St, Jun 4, 2026Elevator, 20 E Randolph St, Jun 4, 2026Elevator, 111 N State St, Jun 3, 2026Electrical, 300 N State St, Jun 2, 2026Electrical, 25 N Michigan Ave, Jun 1, 2026Electrical, 201 E Randolph St, Jun 1, 2026Electrical, 225 N Michigan Ave, May 28, 2026Electrical, 111 N State St, May 28, 2026Alteration or repair, 225 N Michigan Ave, May 28, 2026Scaffold or sidewalk shed, 180 N Michigan Ave, May 27, 2026Elevator, 1 W Wacker Dr, May 27, 2026Electrical, 175 N State St, May 26, 2026Electrical, 201 E Randolph St, May 26, 2026Electrical, 201 E Randolph St, May 22, 2026Roofing, 130 N Garland Ct, May 22, 2026Electrical, 145 N Michigan Ave, May 20, 2026Fire systems, 307 N Michigan Ave, May 20, 2026Fire systems, 1 E Wacker Dr, May 19, 2026Fire systems, 150 N Michigan Ave, May 18, 2026Elevator, 360 N Michigan Ave, May 18, 2026Alteration or repair, 1 E Wacker Dr, May 18, 2026Alteration or repair, 60 E Randolph St, May 14, 2026Fire systems, 205 N Michigan Ave, May 12, 2026Alteration or repair, 200 E Randolph St, May 12, 2026Alteration or repair, 150 N Michigan Ave, May 11, 2026Electrical, 35 E Wacker Dr, May 7, 2026Other, 130 E Randolph St, May 7, 2026Fire systems, 180 N Stetson Ave, May 7, 2026Alteration or repair, 35 E Wacker Dr, May 7, 2026Other, 130 E Randolph St, May 6, 2026Fire systems, 1 E Wacker Dr, May 5, 2026Grading, 181 N Dearborn St, May 4, 2026Alteration or repair, 54 E Randolph St, May 4, 2026Elevator, 111 E Wacker Dr, May 1, 2026New building, 35 E Randolph St, Oct 1, 2026New building, 201 E Randolph St, Aug 19, 2026New building, 307 N Michigan Ave, Jul 22, 2026New building, 11 N Michigan Ave, May 27, 2026New building, 201 E Randolph St, May 13, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • New building
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

63 E Lake St

Chicago, IL 60601

New buildings permitted at three addresses within a quarter mile since May 1, the largest $100,000.

28 permits on record here. The newest, Aug 26: Temporary scaffolding: qty: 3, max. Within a quarter mile, the city has issued 171 more permits (139 projects) since May 1. The nearest new building is 510 ft away.

MayJunJulAugSepOct
Here28 permits · 63 E Lake St
  1. Temporary scaffolding: qty: 3, max
    Scaffold or sidewalk shed
    Aug 26not listed
  2. Temporary scaffolding: qty: 2, max
    Scaffold or sidewalk shed
    Jun 25not listed
  3. Dec 23, 2025$2,140,000
  4. Nov 4, 2025$100,000
  5. Temporary scaffolding: qty: 3, max
    Scaffold or sidewalk shed
    May 8, 2025not listed
  6. May 8, 2025$273,275
  7. May 10, 2021$12,000
  8. Apr 21, 2021$12,000
  9. Feb 23, 2021$2,200
  10. Dec 16, 2020$150,000
  11. Dec 3, 2020$3,000
  12. Feb 6, 2020$15,000
  13. Dec 4, 2019$3,500
  14. May 22, 2019$9,000
  15. Mar 11, 2019$49,000
  16. Sep 4, 2018$15,000
  17. Aug 26, 2013$515,850
  18. Jun 26, 2013not listed
  19. Dec 27, 2012$500
  20. Mar 3, 2011$4,500
  21. Mar 2, 2010$10,000
  22. Nov 19, 2008not listed
  23. Jul 7, 2007not listed
  24. Build out of res
    Alteration or repair
    Dec 1, 2006$200,000
  25. Nov 16, 2006$50,000
  26. Aug 14, 2006$650,000
  27. Apr 26, 2006not listed
  28. Apr 25, 2006$10,000
Next doorunder 250 ft · 6 permits
  1. Temporary scaffolding: qty: 2, max
    203 N Wabash Ave · 130 ft NW · Scaffold or sidewalk shed
    Sep 16not listed
  2. Sep 16$1,630,000
  3. Jun 30$65,000
  4. Jun 30$50,000
  5. Jun 29$125,000
  6. Jun 15$42,000
This block250 to 1,000 ft · 130 permits in 109 projects · 2 new buildings, $953,000
  1. Oct 2$1,200
  2. Oct 2$414,000
  3. Oct 1$3,000
  4. Sep 29$3,500,000
  5. Sep 28$710,581
  6. Sep 25$1,000
  7. Sep 22$5,000
  8. Fire alarm: modification of existing system × 2 permits
    1 E Wacker Dr · 700 ft NW · Fire systems
    Aug 6 to Sep 22not listed
  9. Sep 17$1,362,000
  10. Sep 15not listed
  11. Sep 15$1,005,398
  12. Replacement electrical contractor × 2 permits
    1 E Wacker Dr · 700 ft NW · Electrical
    Jul 31 to Sep 14not listed
  13. Low voltage/communication electrical work × 3 permits
    150 N Michigan Ave · 510 ft SE · Electrical
    Aug 27 to Sep 9$46,411
  14. Repair replace 313 divider panels
    300 N State St · 960 ft NW · Alteration or repair
    Sep 9$100,000
  15. Self-cert 2019 CBRC
    130 E Randolph St · 770 ft SE · Alteration or repair
    Sep 9$87,500
  16. Sep 4$1,000
  17. Sep 3not listed
  18. Self cert 2019 CBC, dx-16, A-2
    1 E Wacker Dr · 700 ft NW · Alteration or repair
    Sep 2$750,000
  19. Sep 2$450,000
  20. Aug 31$1,000
  21. Aug 31$1,000
  22. Aug 31$1,000
  23. Aug 31$1,000
  24. Aug 31$2,750
  25. Aug 28$1,400,000
  26. Low voltage/communication electrical work × 2 permits
    130 E Randolph St · 770 ft SE · Electrical
    Aug 25 to 27$65,000
  27. Low voltage/communication electrical work × 2 permits
    225 N Michigan Ave · 470 ft NE · Electrical
    Aug 3 to 26$275,728
  28. Aug 26$7,000
  29. Temporary scaffolding: qty: 1, max
    8 E Randolph St · 630 ft SW · Scaffold or sidewalk shed
    Aug 25not listed
  30. Aug 25$140,000
  31. Aug 25$300,000
  32. Aug 24not listed
  33. Aug 24$2,200
  34. Replacement general contractor
    130 E Randolph St · 770 ft SE · Contractor change
    Aug 20not listed
  35. Replacement general contractor
    54 E Randolph St · 370 ft S · Contractor change
    Aug 20not listed
  36. Aug 19not listed
  37. Aug 19not listed
  38. Aug 18not listed
  39. Aug 14$13,500
  40. Aug 13not listed
  41. Replacement general contractor
    333 N Michigan Ave · 790 ft NE · Contractor change
    Aug 13not listed
  42. Fire alarm: modification of existing system × 3 permits
    35 E Wacker Dr · 490 ft NW · Fire systems
    Jun 15 to Aug 13not listed
  43. Aug 13$900,000
  44. Aug 11$919,952
  45. Fire alarm: modification of existing system × 2 permits
    225 N Michigan Ave · 470 ft NE · Fire systems
    Jul 10 to Aug 8not listed
  46. Aug 5$52,709
  47. Fire alarm: modification of existing system × 5 permits
    130 E Randolph St · 770 ft SE · Fire systems
    Jun 18 to Aug 4not listed
  48. Aug 4not listed
  49. Aug 3$12,500
  50. Jul 31$10,000
  51. Jul 27not listed
  52. Jul 22not listed
  53. Jul 22$950,000
  54. Jul 21$70,000
  55. Jul 20$375,000
  56. Jul 20$1,800,000
  57. Jul 16$15,250
  58. Jul 15$85,000
  59. Jul 14not listed
  60. Fire alarm: modification of existing system × 4 permits
    150 N Michigan Ave · 510 ft SE · Fire systems
    May 18 to Jul 14not listed
  61. Jul 14$101,040
  62. Temporary scaffolding: qty: 1, max
    175 N State St · 570 ft W · Scaffold or sidewalk shed
    Jul 13not listed
  63. Jul 13$124,500
  64. Jul 9$1,868,000
  65. Jul 9$90,000
  66. Jul 8not listed
  67. Jul 8$35,000
  68. Jul 7$1,100,000
  69. Jul 1not listed
  70. Jun 29$8,000
  71. Jun 24not listed
  72. Jun 24$5,000,000
  73. Jun 24$550,000
  74. Fire alarm: new system
    225 N Michigan Ave · 470 ft NE · Fire systems
    Jun 23not listed
  75. Jun 22$1,533,200
  76. Jun 16$1,800
  77. Jun 15not listed
  78. Jun 11not listed
  79. Jun 10not listed
  80. Jun 10not listed
  81. Electrical maintenance permit × 2 permits
    111 N State St · 950 ft SW · Electrical
    May 28 to Jun 9not listed
  82. Jun 9$1,200,000
  83. Jun 8$1,000
  84. Jun 4$10,000
  85. Jun 4$70,000
  86. Jun 4$1,390,201
  87. Jun 3$774,644
  88. Jun 2$4,418
  89. May 28$27,813
  90. May 28$4,334,877
  91. Temporary scaffolding: qty: 1, max
    180 N Michigan Ave · 330 ft SE · Scaffold or sidewalk shed
    May 27not listed
  92. May 27not listed
  93. May 26not listed
  94. May 22$482,000
  95. May 20$19,000
  96. May 20not listed
  97. May 19not listed
  98. May 18not listed
  99. May 18$500,000
  100. May 14$185,000
  101. May 12not listed
  102. May 11$5,000,000
  103. May 7$150,000
  104. Replacement general contractor × 2 permits
    130 E Randolph St · 770 ft SE · Contractor change
    May 6 to 7not listed
  105. May 7not listed
  106. May 7$200,000
  107. May 5not listed
  108. May 4$100,000
  109. May 4$600,000
Within a quarter mile1,000 ft to ¼ mi · 35 permits in 24 projects · 3 new buildings, $105,000
  1. Electrical maintenance permit × 2 permits
    25 N Michigan Ave · 0.22 mi S · Electrical
    Sep 1 to Oct 1not listed
  2. Electrical maintenance permit × 4 permits
    201 E Randolph St · 0.21 mi SE · Electrical
    Aug 19 to Oct 1not listed
  3. Temporary scaffolding: qty: 1, max
    111 N Dearborn St · 0.23 mi SW · Scaffold or sidewalk shed
    Oct 1not listed
  4. Nonstructural interior demolition
    200 E Randolph St · 0.19 mi E · Alteration or repair
    Sep 22$500,000
  5. Sep 21$100,000
  6. Line voltage electrical work × 2 permits
    35 W Wacker Dr · 0.20 mi W · Electrical
    Sep 2$7,550
  7. Temporary structure: new installation
    201 E Randolph St · 0.21 mi SE · Fence, wall or deck
    Aug 28not listed
  8. Aug 25$10,200
  9. Aug 24not listed
  10. Aug 19$2,000
  11. Aug 5$15,000
  12. Electrical maintenance permit × 3 permits
    25 N Michigan Ave · 0.22 mi S · Electrical
    Jun 1 to Jul 28not listed
  13. Electrical maintenance permit × 5 permits
    201 E Randolph St · 0.21 mi SE · Electrical
    Jun 1 to Jul 28not listed
  14. Jul 27not listed
  15. Jul 20$29,000
  16. Jul 15$195,000
  17. Jun 9$1,000,000
  18. Temporary structure: new installation
    201 E Randolph St · 0.21 mi SE · Fence, wall or deck
    Jun 7not listed
  19. May 27$100,000
  20. May 26$10,000
  21. May 22not listed
  22. May 13$3,000
  23. May 12$10,885
  24. May 1not listed

Chicago Department of Buildings updated its data Oct 3, 2026. We checked it Oct 4, 04:45 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near