11202 E Germann Rd, Mesa has 154 building permits on record. The most recent, opened Mar 16, 2026, is for other: Zf afp annual facilities permit for zf passive safety systems US inc for year 2026
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Other | Zf afp annual facilities permit for zf passive safety systems US inc for year 2026 | – | |
| Plumbing | The proposed improvements include approximately 3,531 linear feet of new 12-inch sanitary sewer and 40 linear feet of 8-inch sanitary sewer pipe. These improvements will connect… | – | |
| Other | Annual facilities permit (mother permit) for trw for year 2018 | – | |
| Electrical | AFP - B15 / Areas K & Q Equipment Relocation project, TRW Site II The scope of work is as follows: Area 'Q'. Remove existing x-ray machine and steel guardrail system. Relocate… | – | |
| Electrical | AFP- Bldg. 2 Warehouse tenant improvements project for TRW / Site II. The scope of work is as follows: Remove and replace an exist. chiller unit w/ modifications to the exist… | – | |
| Electrical | AFP: Bldg. 16 / ESF Relocation project for TRW / Site II. The project scope involves relocating existing environmental services operations from Bldg. 15-8 (previously permitted… | – | |
| Alteration or repair | Pbi - permit to install new "ignition unit pre assembly line" with h-2/iib blast chimeny and 20 paf lexan shielding. No modification to the fire protection systems. | – | |
| Fire systems | Addenda to bld2017-00977 - adding some addtional fire alarm devices to the original scope of work for m-bay. 3 Heat detectors, 1 pull station, 1 horn strobe and 1 relay module. | – | |
| Fire systems | Refbld2016-08163 furnish & install 2 uv/ir flame detectors onto existing early warning control panel connected to existing fire alarm system. | – | |
| Fire systems | Addenda (ref bld2016-06884) to replace existing fire alarm panel with a new notifier nfs2-640 fire alarm panel. Also replacing the existing monitoring modules with new monitor… | – | |
| Alteration or repair | Permit to repair and replace existing laser welder with newer model. Connect to existing exhaust, modify as needed | – | |
| Mechanical (HVAC) | No new square footage or utilities. Installation of di-10 inflator line-exist mechanical, electric services and hazardous material. Quantities to be modified as required. Deferred… | – | |
| Fire systems | Deferred fire sprinklers. In-rack sprinklers. Ref bld2016-02216. Fees paid on main. | – | |
| Fire systems | Replace existing fire alarm panel with a new notifier nfs2-640 fire alarm panel. Also replacing the existing monitoring modules with new monitor modules. Demoing devices in… | – | |
| Electrical | AFP...B15/A Dust Collector Installation project for TRW Site II. The scope of work is as follows: Removal of the existing exterior vacuum pump with concrete pad. and shade cover… | – | |
| Fire systems | AFP -Remove an existing hollow metal door and install a new double hollow metal door Bldg. 15 / Area "P2" - Existing structural cross-bracing will be modified to accommodate the… | – | |
| Alteration or repair | Removal of the existing shi-2 inflator assembly line, existing steel equipment platform and assoc. Support equipment. Installation of new "sp12-evo" inflator assembly line #301 &… | – | |
| Fire systems | AFP: Building 15 "B" Igniter #307. Installation ignition unit pre-assembly install #307. Modify existing mechanical and electrical systems. Fire supression and fire alarm to… | – | |
| Alteration or repair | Scope of work includes demo of existing office space; reconfiguration of existing assembly equipment; installation of roi assembly equipment previously installed in b15/q (com#… | – | |
| Alteration or repair | Combine an existing training room and conference room to make one large office area, redesignation of areas within b2 warehouse to facilitate the relocation of shipping/receiving… | – | |
| Electrical | AFP: Removal of Existing "Finish Lines 'A' & 'C'" and existing "ROI Lines 3 & 4" with assoc. support equipment. Relocate Existing Helium Leak Check Lines 197/198 with assoc… | – | |
| Roofing | AFP/ Building 15/ area "M" Load room improvements. Add to existing Lexan barrier. Install new 3 hour door Install new 3/4 hour exit door. Add 3 hour fire shutters. Install roof… | – | |
| Electrical | AFP/ Building 15 area 'B" installation ignition unit pre-assembly install with blast chimney. Install 20 PSF rated Lexan shielding. Relocation of existing igniter sub-assembly… | – | |
| Addition | Expansion of the exist. Compressor shed and install additional compressor - modify exist. Mech., elect., and piping systems. The expansion of the existing building 15/area "p" hp… | – | |
| Electrical | AFP-Relocate existing CT scanner from B15/G to B15/I. Minor modification of existing electrical systems required | – | |
| Electrical | AFP-Demoltion of existing conference room. Installation of 3 new modular ststems cubicles. Minor modifications of electrical system required | – | |
| Electrical | AFP- Installation of 3 rows of 10' high storage racks to match existing. No modifications to electrical, mechanical, or plumbing systems. | – | |
| Demolition | Demolish small building and cell tower located in the southeast portion of parcel; east of parking lot. | – | |
| Fire systems | Replacement of fire panel in building 15-8 | – | |
| Alteration or repair | Relocate existing environmental services operations to buildings 15-8. 16/N.s.e., dunnage bay & storage of 1.4q materials in bldg 16. F-2/h-3 occupancy / IIB construction | – | |
| Other | AFP: Permit to close out 49 expited permits issued to the TRW plant. Bld2003-01840, bld2003-02309, bld2003-03886, bld2004-03065, bld2005-07972, bld2005-11397, bld2005-12171… | – | |
| Other | AFP: Create permit for closing out multiple exprired permits | – | |
| Fire systems | Modify existing fire alarm system. Adding (2) pull stations, (1) monitor modules, (3) exp-proof heat detectors, (2) relay modules and (3) horn strobes | – | |
| Electrical | TRW / AFP bld2007-01878-g0103 Project scope consists of the relocation of an existing "E-test" Station and the installation of a new Arc Stud Welder within the existing B15/G… | – | |
| Alteration or repair | Installation of "ingiter sub-assy"line & inflator final assy" line b15/a and installatin of ingnition unit pre-assy" in b15/b2. No changes to fire sprinkler system. | – | |
| Addition | AFP/TRW Addition of interior walls and ceiling assembly to create an equipment rooms for a CT Scanner in Building 15 Area G at TRW. Electrical and Mechanical systems to be… | – | |
| Alteration or repair | Install new sp1-2 inflator welding stn. W/ exhaust, compressed air & elect. Power mods. And a manual load stn. Both in area b1 of bldg B ( h3/iib ) at trw site II. To include… | – | |
| Electrical | AFP / TRW bld2007-01878-g0101 Bldg. 15 / Area `I? ? Environmental Testing Chambers Installation. 10 new environmental testing chambers to conduct thermal testing of inflators in… | – | |
| Demolition | Repair of existing cmu wall by demolition and reconstruction. All new cmu to match existing. | – | |
| Fire systems | Deferred fire alarm modifications in p-bay of bldg15 at trw site II. Ref bld2012-06100. To include: new chimney heat detectors and connection to existing fire alarm system. | – | |
| Alteration or repair | Relocate existing igniter sub assembly line (195) from b15/p2 to b15/q. To include:modification of elect.power and lighting. W/ reduced hazardous mat'l quantities. To include… | – | |
| Alteration or repair | Remodel bldg 15 - area c at trw site II ( h-2/b /iib ) relocating existing flexcell from bldg b14. Modify assembly line 3. To include: demo existing chiller units, pumps, piping… | – | |
| Mechanical (HVAC) | AFP / TRW BLD2007-01878-0100 B15/I - Water Jet Installation" project for TRW / Site II; Installation of a new "Water Jet" machine w/ support equipment in existing room "I35" for… | – | |
| Alteration or repair | Remodel 8,828 SQ FT of pre-final assembly area p1 for the installation of shi-2 final inflator assembly line#56 ( h3 IIB ) of bldg#15 at trw site II. To include: roof mtd exhaust… | – | |
| Fire systems | Afp - trw / afp bld2007-01878-0099 bldg. 15 / Areas 'g', 'h' & 'm' interior improvements. AREA G - Interior improvements to accommodate a records room within the existing… | – | |
| Alteration or repair | Remodel a portion of the 19,391 SQ FT of existing r.o.i. Inflator assembly/gas pad for 2 new lines , the igniiter assembly line#196 and the helium leak check line#197 in area q (… | – | |
| Roofing | AFP - TRW # bld2007-01878-00 "Bldg. 15 / Area "D" - Inflator Assy. Room Ventilation Modifications" project for TRW / Site II. Permit includes the installation of a new… | – | |
| Alteration or repair | 2,460 SQ FT Remodel of area d2 ( h2 / IIB ) of bldg 15 at trw for igniter assembly use. Increasing 1.3q propellant quanities by 11.1 lbs. To include: install 1 new wet ruwac dust… | – | |
| Mechanical (HVAC) | Remove existing smoke detectors from bldg. 15 Spine and replace with addressable beam smoke detectors detectors ( fsb-200s a ) single ended , reflector type at trw. | – | |
| Mechanical (HVAC) | Modify fire alarm adding ( frm-1a & fcm-1 rel a ) ) control/relay and release modules and connect to fire shutters for new processes in m bay bldg 15 at trw. To include: wiring | – | |
| Demolition | AFP - "Bldg. 15 Areas G & O 2007-01878-g0097 project for TRW / Site II Remodel existing men's and women's restrooms, including the installation of new plumbing fixtures, permit… | – | |
| Alteration or repair | Code modification to use blast pressure resistant construction in place of separate bldg where quantites of hazardous materials exceed the maximum allowable quantities. | – | |
| Alteration or repair | Code modification to allow div 1.3 materials stored of used in bldg in quantities exceeding the maximum allowable quantity per control area as indicated in table 307.7(1) 2006 ibc | – | |
| Alteration or repair | 13,451 SQ FT Remodel and change of occupancy of 15m for install di-10 propellant transfer/load and inflator assembly operations and associated supt equipment in bldg 15 ( h2 IIB )… | – | |
| Mechanical (HVAC) | Code modification for bld2012-00054 to add indoor and mobile day boxes area p2 bldg-15 at trw site II | – | |
| Mechanical (HVAC) | Add new compartmentalized fixed daybox & new mobile daybox in area p2 at trw bldg. 15 At site II. To include: new wall mtd. Barometric relief louver. See approved code… | – | |
| Electrical | AFP - TRW / AFP bld2007-01878-g0096 Bldg.15 / Area 'Q' - SHI-2 Gas Fill Line Installation . Relocation of existing inflator body Assembly lines / equipment to south end of… | – | |
| Alteration or repair | Relocate exist. Magazine 15p-1 to a new conc. Pedestal/foundation north of bldg. 15/M1 & 15/p adjacent to mag 15m-1 at trw site II. Ref permit bld2010-02323 and addenda 2 code… | – | |
| Addition | AFP - TRW / AFP bld2007-01878-0093 (2of 2).1) The addition of a new 10'-0"w x 40'-0" conc. pad for storing inert items. 2) Remove & replace existing high piled storage racks in… | – | |
| Demolition | Afp - trw / afp bld2007-01878-0092 bldg. 15 / Area 'Q. Demolition of existing assembly equipment, associated support equipment, associated mechanical and electrical services… | – | |
| Alteration or repair | Transfer storing/staging operations at trw site II bldg 15, from mag 15/d 10 & 11 to mag 15/d 20 increasing div 1.3 quantities by 50 lbs for a new combined total of 76.4 lbs at… | – | |
| Electrical | AFP - Bldg. 15 / Area 'I' - Module and Chemistry Lab Expansion" Project" for TRW / Site II.The scope of this submittal is meant to document field changes / modifications made… | – | |
| Alteration or repair | Remodel area 15/d ( h2/h3 / IIB ) at trw/vssi site II. To include: demo of existing sub. Assembly line, and istallation of relocated flekcell lines from 15/a and install… | – | |
| Electrical | Afp - trw / afp bld2007-01878-0091. Project scope consists of the installation of a new x-ray machine and assoc. support equipment to support existing production operations in the… | – | |
| Demolition | Afp - trw / afp bld2007-01878-0092. Project consists of the demolition of all exist. process and assembly equipment, associated support equipment, associated mechanical and… | – | |
| Fire systems | AFP bld2007-01878-0090 - Project scope consists of removing the existing high-speed deluge nozzle and infrared fire detection (IFD) sensor located inside the existing SHI blast… | – | |
| Addition | Install 10 FT high workstation protection lexan enclosures around 2 existing ( guni 75 ) propellant dosing/loading stations 592 SQ FT & install 2 new separation valves on the… | – | |
| Alteration or repair | Code mod. To install a protective enclosure ( indoor vent chamber )to isolate div. 1.3 Propellant in open use and increase quanties of propellant in bay "a" of bldg 15 in lieu of… | – | |
| Alteration or repair | Expedited: 11,266 SQ FT remodel of bldg. 15 "A" site II ( h3/h4 IIB ) to modify the existing assembly line for vpa ignition canister/ cell 2 bowl feeder for the ppi-3 inflator. To… | – | |
| Addition | Addenda to bld2010-o2323. Change construction of new compressor shed from site built to pre-engineered metal building. No change in building area or MP&E. | – | |
| Alteration or repair | Remodel and expand existing production test lab facility. Work includes removing existing waste tank from open underground concrete pit under existing building roof line, filling… | – | |
| Fire systems | AFP - "Bldg.15 / Area 'K' - Shipping / Receiving Relocation" project for TRW / Site II. 1. Relocation of the existing Flange Weld lines and assoc. support equipment from Bldg… | – | |
| Addition | Code mod #3, ref. BLD2010-02323 - TRW AM&M A15P.O3 - APPROVED - Code Modification is to use a specially designed mobile daybox to bring explosive material into the final assembly… | – | |
| Addition | Code mod #2, ref. BLD2010-02323 - TRW AM&M A15P.O2 - APPROVED - Code Modification is to use "INTERCEPTOR-QR" indoor explosion venting system to comply with the explosion control… | – | |
| Addition | Code mod #1, ref. BLD2010-02323 - TRW AM&M A15P.O1 - APPROVED - Code Modification is to use blast/pressure resistant construction in place of a separate building as required per… | – | |
| Addition | Code study; including 3 code modifications (see below), remodel and addition to existing building for installation of shi-2 inflator assembly line. Remodel existing 13,391 sq. ft… | – | |
| New building | New acoustical enclosure around existing technician's cubicles inside existing Bldg. 16 / 'C1'.Existing Mechanical and Electrical services already in place will be modified to… | – | |
| Electrical | Project scope consists of the construction of a new acoustical enclosure around existing technician's cubicles inside existing Bldg. 16 / 'C1'.Existing Mechanical and Electrical… | – | |
| Other | AFP - Relocate cubes from the production floor to the mezzanine to free up some space in the bay. | – | |
| Alteration or repair | AFP / TRW bld2007-01878-0087- Relocation of the existing manual "Diffuser Load Station" and installation of an automated "Diffuser Load Station" on Lines #2 & #3 of the DI-9… | – | |
| Electrical | TRW / AFP bld2007-01878-0086 - Relocation and installation of existing assembly equipment used for inert inflator assembly operations from Bldg. 50 into "Bldg. 15 / Area 'B'… | – | |
| Mechanical (HVAC) | Modification of exist fire alarm system and devices. Ref bld2009-04399 | – | |
| Alteration or repair | Addenda (delta 3 )to orig. Permit 2009-04399 & code study to substitute a prefabricated 60 x 72 gravity relief ventilator unit w/ backdraft damper for the exhaust penthouse… | – | |
| Alteration or repair | Code study & relocation of ppi-3 assembly line w/ assoc support equipment from bldg to 17 to bldg 15c for filter & inflator assembly / guni-65/75 propellant staging/load /transfer… | – | |
| Alteration or repair | Code mode ref. BLD2009-03828. Modify indoor magazine use of mobile daybox and quanities per sms report #0653-r1 | – | |
| Alteration or repair | Code mod ref. BLD2009-03828. To use exisitng 20lbs per SQ FT wall and roof construction per sms report #2028-r1 | – | |
| Alteration or repair | Relocate service & prototype propellant loading operations to bay 1 & 3 and protype teardown operations to bay 2 in bldg 15-l a seperate bldg. At trw site II per consolidation. (… | – | |
| Alteration or repair | Afp - trw/afp2007-0187-0085. Interior improvements to accomodate an office area within an existing mfg space. Existing process equipment will be relocated from around the site to… | – | |
| Alteration or repair | 12,324 SQ FT Remodel/relocation of exist. Di-9 igniter sub-assembly line #2 & associated supt equipment from bld 38 to bld 15d ( areas d2 & d3) at trw site II. ( H2/h3 IIB )… | – | |
| Alteration or repair | AFP - Questions contact Terri Wood @ 480-644-4542. Trw/afp bld2007-01878-g0084. Remodel of plant managers area. | – | |
| Alteration or repair | Install 125 gal vertical above ground propane tank & provide connection to relocated 30k btu burner in cherokee bay 6 at bldg. 15 ( I ) at trw site II. Burner to be installed per… | – | |
| Electrical | AFP -Questions contact Terri Wood @ 480-644-4542.TRW / AFP2007-01878-g0083 (2 of 2) Modifications to existing assembly lines #3 & #4 in Bldg. 17.Existing Mechanical and Electrical… | – | |
| Electrical | AFP -Questions contact Terri Wood @ 480-644-4542.TRW / AFP2007-01878-g0083 (1 of 2) Modifications to existing assembly lines #3 & #4 in Bldg. 17.Existing Mechanical and Electrical… | – | |
| Electrical | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-g0082 2 of 2. Relocating existing lab and manufacturing equipment from Bld 50 to Bld 15 / Area I… | – | |
| Electrical | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-g0082 1 of 2. Relocating existing lab and manufacturing equipment from Bld 50 to Bld 15 / Area I… | – | |
| Fire systems | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-00080. Relocation of existing admin operations from bld 2 to the newly redesignated office area of Bld… | – | |
| Alteration or repair | Annual Facilities Permit - Questions contact Terri Wood 6444542 TRW / AFP bld2007-01878-00080 Relocation of existing open & hard wall office space & conference room from Bldg. 2… | – | |
| Other | Annual Facilities Permit TRW /AFP bld2007-01878-0079 Relocation of an exist. egress stair, an exist. fill port welder and an exist. compressed air filter rack; and the… | – | |
| Alteration or repair | 1.Removing the existing assembly lines in Bldg. 15/K. 2.Relocation of the existing Flange Weld Lines and assoc. support equip. from Bldg. 15/D to Bldg. 15/K. 3.Relocating the… | – | |
| Alteration or repair | Relocate the d1-9 inflator line & support equipment from bldg 38 to bldg 15/d, includes 4 code modifications, see attached in documents. | – | |
| Electrical | Annual Facilities Permit Questions contact Carl White (6443588)TRW / AFP No. bldg2007-01878-g0077 Project scope consists of modifying the existing DI-9 / Line #3 assembly line in… | – | |
| Other | Assembly operations for flexcell lines utilizing energetic materials. Increasing hazardous material division 1.4 explosives. Equipment installed under permit 2008-09659 | – | |
| Alteration or repair | Annual Facilities Permit -- Question contact Carl White 6443588.The project scope consists of relocating Flexcell lines 1 & 2 from Bldg .17, and Flexcell lines 3 & 4 from Bldg. 15… | – | |
| Other | Annual Facilities Permit -- Questions contact Carl White 6443588. Bldg 15 / Area B2 Service Bay | – | |
| Other | Install of stud welder in warehouse area of bld # 50/fees based on # of inspections | – | |
| Mechanical (HVAC) | Afp- scope includes interior improvements to existing admin blding to include demo of extisting walls and ceilings to accomodate newc training rms, computer lab, and health… | – | |
| Alteration or repair | Afp- bld # 15/ area 1/ scope is remodel of existing process equipment rm to mro rm/ fees based on # of inspections/ contact carl white @ 3588 with questions | – | |
| Other | Work order # 2086 /friction welder installation/fees based on # of inspections | – | |
| Other | Service reconfiguration /scope of phase 1 is the reinstallation of laser weld equipment/fees based on # of inspections | – | |
| Addition | REF: BLD2008-04723 -- Approved Code Modification to allow the amount of 1.3 explosives in Building 15 Area C load room exceed the maximum permitted per IBC TABLE 307.1(1) and to… | – | |
| Addition | Remodel with new construction of an existing building for the installation of PPI3 production line. Includes Code Study and Code Modification (REF BLD2008-05102). See Case Notes… | – | |
| Electrical | this project scope consists of installing a new concrete pad for a new elect ses, transformer and switch; terminating the existing elect service to blds 15-5 and 15-8 and… | – | |
| Electrical | Bldg. 15 AREA D The project scope consists of: Reorienting the existing Flexcell Assembly Line. Installing a new Flexcell Assembly Line just south of the exist Flexcell inside the… | – | |
| Alteration or repair | The project consist of the installation of automated propellant loading equipment to replace the existing manual propellant loading operation in BLDG. 15/ Area A and the expansion… | – | |
| Electrical | The project scope consist of the installation of 2 new automated "shorting clip" bowl feeder stations to replace an existing manual-feed operation on the existing assembly line… | – | |
| Alteration or repair | This is a combination of two projects G0062 area B and G0063 area C The project consists of the demo of all existing process and assembly equipment associated support equipment… | – | |
| Grading | The project scope entails providing independent on-site grading and drainage and retention resulting from previously approved lot split and conditional uses permit (Zoning case… | – | |
| Other | Afp - any questions regarding this permit contact chris hester x4506 or patrick ott x5093. Generator installation for building #4 | – | |
| Roofing | Bldg. 50 Glamtronics Welder Installation- The project scope entails the installation a glamtronics welder in the main assembly bay of Bldg. 50, and an exsiting roof-mounted… | – | |
| Electrical | Bldg. 15/ Area J- Compressor Exchange. The project scope entails the removal and replacement of an existing air compressor with a new compressor in the "Existing Room" of bldg… | – | |
| Electrical | Bldg. 2 Area Chiller Replacement. The project scope entails the installation of a new HVAC chiller unit in the north mechanical yard of Bldg. 2. Exsitng mechanical and electrical… | – | |
| Electrical | Bldg. 50 Stud Welder Installation. The project scope entails the installation of a new stud welder on the main assembly floor of Bldg 50. The existing electrical system will be… | – | |
| Electrical | Bldg. 15 Area "I" - "Liebert A/C Installation". The project scope entails the installation of a portable a/c unit in the office/ support area of Bldg. 15/Area "I". The existing… | – | |
| Demolition | Bldg. 17 - GMF "16 Lane Cutter Demolition". The scope of work consist of the demolition of the existing "16 Lane Cutter" in the exit cutter room", high-pressure pump in the… | – | |
| Alteration or repair | Bldg. 2 / Admin Executive Office Remodle. The work entials remodel of the existing office area of bldg. 2 that includes reconfiguration of partions, power and diffuser loacations… | – | |
| Electrical | Bldg. 15 Area "M" - "Friction Welder". The project scope entails the installation of a friction welder previously permitted under permit bld2004-08424 but never installed in the… | – | |
| Roofing | BLDG 15/ Area "Q" Burst Disk Welder Installation. The project scope entails the installation of a new Burst Disk Welder" with associated support equipment (control panel, chiller… | – | |
| Alteration or repair | Bldg. 15 AREA "C" LOAD ROOM RECONFIGURATION The project consists of removal of 2 existing weld lines and associated support equipment and the installation of a new igniter… | – | |
| Alteration or repair | BLDG.17 -GMF PPI-3 LINE MODIFICATION The project consist of the modification of existing #3 filter tube sub-assembly line in the existing assembly room of bldg. 17 to support the… | – | |
| Demolition | Bldg. 51 Storage Rack Demolition. The project entails the removal of the existing high-piled storage racks in the existing warehouse area of Bldg. 51. The exisiting high piled… | – | |
| Electrical | Bldg. 15 / Area "Q" Helium Booster Pump. The project scope entails the installation of 2 helium booster pumps with a chainlink shade structure on the existing concrete mechanical… | – | |
| Other | Code study lot split code summary. Verification of new allowable quantity distance for explosive storage based on new east property line resulting from lot split. | – | |
| Other | BLDG 15 / Area M Equipment Installation. The work order for the project is 2086. The AFP project # is AFP- 00038 and the expiration date is 12/6/07 | – | |
| Roofing | Production line changes. Remove existing module assembly line and install ROI Inflator line #7. Disconnect existing utilities and reuse for new line. Install new fume exhaust… | – | |
| Other | Bldg. 15 - Area "Q" Pencil tank Installation. The work order # for this project is 2086. The AFP project # is AFP-00038 and the expiration 12/6/07. | – | |
| Addition | Assembly line change out only, no change in use, occupancy or occupant load. Remove three obsolete inflator assembly lines and replace with one new inflator assembly line (ROI… | – | |
| Other | Annual facilities permit-above address is main site. Remote site located at 4051 N higley rd. Effective 11/4/05-11/4/06 | – | |
| Other | Annual facilities permit-above address is main site. Remote site located at 4051 N higley rd. Effective 11/04/2004-11/04/2005. | – | |
| Other | After hours inspection | – | |
| Addition | Relocate welding equipment from bldg 15 area m to a. Increase 1.4 explosives in a area by 28.6 lbs for a total of 62.71 lbs. Relocate lova loading to existing operating bay #4 in… | – | |
| Alteration or repair | Code study for the use of guni azm 327 propellant in production within existing bays and equipment. | – | |
| Addition | C tucker - remove existing module assembly lines to make room in north end of area "n" to install "roi" assembly line. Work includes modifying/relocating electrical. Plumbing and… | – | |
| Other | Trw vssi mesa - code study for using guni azm-327 in bldg 15 area d. Amount in use outside of chimneys is below the maximum allowable quantities. | – | |
| Addition | Install additional laser chiller and revise allowable area calcs. Install 3rd chiller and tie into existing laser chilled water loop. Install new breakes in dsp and install… | – | |
| Alteration or repair | Code study to increase existing amounts of hazardous materials in dayboxes for production. Dayboxes(magazines) are associated with building 38. | – | |
| Alteration or repair | Referance prj2003-00071 - code study for bld2003-01840: installation of hybrid gas inflator assembly line in bays 4 and 5 of existing building 50. | – | |
| Other | Code study for bld2003-03886, ref prj2003-00070 | – | |
| Addition | Prj2003-00070 - relocation of drivers side canister igniter loading di-1/di-2 operation sqft. From site 1 to bldg.15 "b" generate load room, 2,348 sqft. For trw vehicle safety.to… | – | |
| Other | Annual facilities permit - main site | – | |
| Alteration or repair | Install pole mtd, light fixture near mag. 17A. Connect to existing light circuit | – | |
| Demolition | Selective equipment demolition/removal -- demo permit only -- note: existing fire alarm and fire protection systems to be protected and remain operational during work. -- Work… | – | |
| Addition | Referance prj2003-00071 & code study bld2003-04457 - project includes the installation of hybrid gas inflator assembly line in bays 4 and 5 of existing building 50. Work includes… | – | |
| Alteration or repair | Relocate ball mill, oven, glove box and scale for propellant test preperation from building 16-h (test lab) to room 147 building 55-1 | – | |
| Alteration or repair | Relocate stud welder from area "g" to area "a" with all associated utilities. existing div.1.4 hazardous material quantities previously permitted #233287 will be increased by… | – |