Nearby Permits
Map of 200 permits within a quarter mile of 14-40 Beach StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 98-106 Boylston St, Sep 10, 2026Fire systems, 21-27 Temple Pl, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Fire systems, 21-27 Temple Pl, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Fire systems, 151 Tremont St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Plumbing, 151 Tremont St, Aug 12, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Fire systems, 41 West St, Jul 23, 2026Electrical, 48-50 Summer St, Jul 22, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Electrical, 100 Stuart St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 151 Tremont St, Jul 1, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Fire systems, 43-45 West St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Fire systems, 151 Tremont St, Jun 23, 2026Electrical, 41 West St, Jun 19, 2026Plumbing, 151 Tremont St, Jun 18, 2026Fire systems, 151 Tremont St, Jun 18, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Other, 821-831 Washington St, Jun 8, 2026Electrical, 60-70 Temple Pl, Jun 8, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 4 Boylston Pl, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Stuart St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Alteration or repair, 151 Tremont St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Plumbing, 821-831 Washington St, May 15, 2026Fire systems, 109-119 Beach St, May 15, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 26-30 West St, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 151 Tremont St, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Alteration or repair, 151 Tremont St, May 7, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

14-40 Beach St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $6M alteration or repair at 2-16 Avery St, permitted Jul 14.

41 permits on record here. The newest, Jul 13: Install single face non-illuminated wall sign 4.5' tall 2.5' wide 2" deep 11.25sf. Within a quarter mile, the city has issued 200 more permits (195 projects) since May 1.

MayJunJulAugSepOct
Here41 permits · 14-40 Beach St
  1. Jul 13$1,000
  2. Jun 3$7,978
  3. Jun 1$11,626
  4. Apr 22$593,690
  5. May 8, 2025$70,000
  6. Oct 30, 2023$100
  7. Jun 9, 2023$2,730,903
  8. Jun 8, 2023$2,000
  9. Concrete repairs
    Alteration or repair
    Oct 13, 2022$288,420
  10. Aug 18, 2022$2,500
  11. May 4, 2022$100
  12. Mar 17, 2022$2,500
  13. Jan 10, 2022$5,000
  14. Dec 6, 2021$47,500
  15. Dec 3, 2021$5,000
  16. Dec 28, 2020$700
  17. Aug 1, 2019$336,600
  18. Jul 22, 2019$100,000
  19. Jul 22, 2019$20,000
  20. Jun 26, 2019$394,000
  21. Jul 27, 2018$100,000
  22. Jan 11, 2018$6,000
  23. Aug 31, 2017$3,800,000
  24. Mar 10, 2017$12,500
  25. Jan 4, 2017$2,000
  26. Dec 22, 2016$54,000
  27. Dec 6, 2016$4,857
  28. Apr 22, 2014$329
  29. Apr 4, 2014$800
  30. Apr 4, 2014$780
  31. Feb 27, 2014$4,000
  32. Feb 26, 2014$2,900
  33. Jan 13, 2014$900
  34. Dec 20, 2013$4,000
  35. Nov 27, 2013$9,000
  36. Oct 1, 2013$68,000
  37. May 31, 2013$1,000
  38. Apr 16, 2013$6,000
  39. Apr 9, 2013$80,000
  40. Mar 22, 2013$3,000
  41. Feb 4, 2013$2,000
Next doorunder 250 ft · 8 permits
  1. Sep 24$90,000
  2. Data wiring for office
    68-74 Harrison Av · 240 ft SE · Electrical
    Aug 27$3,000
  3. Aug 27$10,000
  4. Aug 3$69,500
  5. Work done in 5th floor office
    68-74 Harrison Av · 240 ft SE · Alteration or repair
    Jul 28$62,300
  6. Jun 16$22,236
  7. May 21$1,000
  8. May 13$1,000
This block250 to 1,000 ft · 113 permits in 110 projects
  1. Oct 2$65,000
  2. Oct 2$20,000
  3. Oct 2$196,500
  4. Oct 1$89,172
  5. Access Control and CCTV
    55-57 Hudson St · 740 ft S · Electrical
    Oct 1$160,000
  6. Oct 1$450,000
  7. Oct 1$600,000
  8. Oct 1$3,000,000
  9. Sep 30$3,500
  10. Sep 30$725,000
  11. Sep 29$396,999
  12. Sep 29$5,113,779
  13. Sep 24$3,500
  14. Remodel masterbathroom
    558-580 Washington St · 640 ft N · Alteration or repair
    Sep 14$10,400
  15. Sep 14$74,290
  16. Sep 11$29,324
  17. Sep 11$10,000
  18. Sep 11$2,300
  19. Sep 9$2,700
  20. Sep 9$18,000
  21. Sep 9$4,200
  22. Sep 8$12,585
  23. Sep 8$7,000
  24. Equinox Boston Gym
    2-16 Avery St · 670 ft NW · Electrical
    Sep 3$5,000
  25. Sep 2$20,000
  26. Sep 2$52,000
  27. Aug 27$60,000
  28. Aug 27$8,000
  29. Including Retail.in the restaurant
    60-62 Beach St · 400 ft E · Alteration or repair
    Aug 27$7,500
  30. Aug 21$14,000
  31. 8th floor interior demolition
    136-146 Harrison Av · 670 ft S · Alteration or repair
    Aug 19$15,000
  32. Aug 18$55,000
  33. Aug 18$2,500
  34. Aug 17$74,000
  35. Aug 17$300,000
  36. Aug 13$3,000
  37. Aug 10$10,000
  38. Aug 7$45,672
  39. HVAC Controls
    2-16 Avery St · 670 ft NW · Electrical
    Aug 6$45,000
  40. Aug 5$667,993
  41. Aug 5$1,000
  42. Aug 4$8,135
  43. Aug 3$2,500
  44. Jul 30$93,000
  45. Jul 30$1,810
  46. Jul 30$14,738
  47. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 870 ft S · Alteration or repair
    Jul 29$27,500
  48. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 830 ft S · Alteration or repair
    Jul 29$27,500
  49. Jul 29$27,500
  50. Jul 29$27,500
  51. Jul 29$75,000
  52. Jul 29$300,000
  53. Jul 28$400,000
  54. Jul 27$7,500
  55. Jul 23$267,785
  56. Jul 23$45,987
  57. Jul 23$8,500
  58. Jul 21$190,000
  59. Jul 20$66,817
  60. Jul 16$152,409
  61. Jul 14$20,000
  62. Jul 14$6,010,000
  63. Jul 2$1,000
  64. Jun 29$350,000
  65. Jun 28$10,000
  66. Jun 26$11,875
  67. Jun 26$60,000
  68. Jun 26$55,000
  69. Jun 26$121,914
  70. Jun 25$160,057
  71. Jun 25$3,600
  72. Equinox Boston Gym
    2-16 Avery St · 670 ft NW · Electrical
    Jun 17$70,300
  73. Jun 16$4,000
  74. Jun 15$50,000
  75. Interior demolition of partitions
    1 Lincoln St · 900 ft NE · Alteration or repair
    Jun 15$500,000
  76. Jun 15$19,090
  77. Jun 12$20,000
  78. Jun 10$18,900
  79. Jun 10$2,500
  80. Jun 10$75,000
  81. Jun 10$651,673
  82. Jun 9$22,000
  83. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 900 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  84. Jun 9$362,682
  85. Jun 8$17,000
  86. Jun 8$4,000
  87. Jun 8$4,000
  88. Change Occupancy/no work has to be done
    6-6a Tyler St · 370 ft SE · Alteration or repair
    Jun 5$500
  89. Renovations to 5th and 6th floor suites
    1 Lincoln St · 900 ft NE · Alteration or repair
    Jun 4$337,125
  90. Jun 3$3,500
  91. May 27$6,000
  92. May 27$2,000
  93. May 27$1,500
  94. May 26$12,000
  95. May 22$9,000
  96. May 22$3,800
  97. May 20$11,440
  98. May 18$4,915
  99. May 13$10,000
  100. May 13$35,000
  101. Refresh of existing int
    183-186 Tremont St · 770 ft NW · Alteration or repair
    May 12$171,574
  102. May 12$4,000
  103. May 11$488,050
  104. May 11$615,100
  105. May 8$6,000
  106. May 7$200,000
  107. May 7$20,000
  108. Interior Replacement of insulation
    13-17 Oxford St · 290 ft E · Alteration or repair
    May 6$38,763
  109. May 6$1,200
  110. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 79 permits in 77 projects
  1. Oct 2$6,000
  2. Oct 1$10,000
  3. Sep 30$18,000
  4. Sep 29$110,000
  5. Sep 28$5,800
  6. Sep 28$25,000
  7. Sep 23$14,500
  8. Sep 16$100,000
  9. Sep 15$77,839
  10. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.22 mi NE · Alteration or repair
    Sep 14$326,600
  11. Sep 11$14,000
  12. Sep 10$150,000
  13. Sep 10$3,800
  14. Sep 9$3,800
  15. Sep 8$23,341
  16. Sep 3$1,784
  17. Sep 3$4,460
  18. Aug 31$11,000
  19. Aug 25$10,000
  20. Aug 21$139,100
  21. Aug 19$3,000
  22. Aug 19$19,800
  23. Aug 17$5,000
  24. Aug 14$20,000
  25. Aug 12$10,000
  26. Aug 12$225,000
  27. Aug 11$1,500
  28. Aug 10$249,760
  29. Aug 6$391,910
  30. Aug 6$4,500
  31. Aug 5$4,700
  32. Aug 4$125,000
  33. Jul 31$10,000
  34. Jul 28$13,895
  35. Oxford - 16th floor - demolition
    125 Summer St · 0.24 mi NE · Fire systems
    Jul 27$200,000
  36. Jul 25$554,000
  37. Jul 23$14,000
  38. Jul 22$2,500
  39. Jul 21$317,025
  40. Renovation 2 bathroom
    66-86 Lincoln St · 0.19 mi E · Plumbing
    Jul 21not listed
  41. Jul 21$6,000
  42. Jul 10$54,007
  43. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 0.20 mi NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  44. Remove and replace roof
    99 Summer St · 0.22 mi NE · Roofing
    Jul 7$92,700
  45. Jul 2$139,100
  46. Jul 1$28,000
  47. Remove old suspended ceiling
    90 Tyler St · 0.19 mi S · Alteration or repair
    Jun 30$176,600
  48. Jun 29$16,000
  49. Jun 26$52,500
  50. Jun 26$10,437
  51. Jun 23$68,000
  52. Jun 19$25,000
  53. Jun 18$24,600
  54. Jun 18$23,000
  55. Project Address: 112-6 Beach Street
    106-112 Beach St · 0.19 mi E · Alteration or repair
    Jun 11$80,858
  56. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.22 mi NE · Alteration or repair
    Jun 9$117,625
  57. Jun 8$10,700
  58. Jun 8$2,115
  59. Jun 5$20,000
  60. Jun 5$9,800
  61. Jun 3$41,268
  62. Jun 1$41,922
  63. May 26$2,000
  64. Replacement condenser
    106-112 Beach St · 0.19 mi E · Electrical
    May 22$1,800
  65. May 21$369,000
  66. May 20$5,000
  67. May 20$538,946
  68. May 15$3,000
  69. May 15$16,200
  70. May 12$22,000
  71. May 11$5,000
  72. May 11$40,000
  73. Demo, temp lights
    151 Tremont St · 0.21 mi NW · Electrical
    May 8$38,000
  74. May 8$3,554,969
  75. Removal of interior walls, sheet rock
    151 Tremont St · 0.21 mi NW · Alteration or repair
    May 7$500
  76. May 7$3,037
  77. Plumbing to restaurant
    75-79 Summer St · 0.22 mi NE · Plumbing
    May 6$35,000

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 15:49 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near