Nearby Permits
Map of 132 permits within a quarter mile of 35 Tyler StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 1 Lincoln St, Sep 30, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 882-892 Washington St, Sep 25, 2026Electrical, 17-23 Beach St, Sep 24, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Electrical, 2-16 Avery St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Electrical, 100 Stuart St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 3 Johnny Ct, Jun 16, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Other, 821-831 Washington St, Jun 8, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Alteration or repair, 100 Stuart St, Jun 1, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Plumbing, 821-831 Washington St, May 15, 2026Fire systems, 109-119 Beach St, May 15, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

35 Tyler St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $6M alteration or repair at 2-16 Avery St, permitted Jul 14.

Three permits on record here. The newest, Sep 11: De-energized maintenance/troubleshooting of customer generator. Within a quarter mile, the city has issued 132 more permits (128 projects) since May 1.

MayJunJulAugSepOct
Here3 permits · 35 Tyler St
  1. Sep 11$10,000
  2. Mar 19$4,500
  3. Apr 23, 2012$2,200
Next doorunder 250 ft · 10 permits
  1. Access Control and CCTV
    55-57 Hudson St · 170 ft SE · Electrical
    Oct 1$160,000
  2. Oct 1$450,000
  3. 8th floor interior demolition
    136-146 Harrison Av · 120 ft SW · Alteration or repair
    Aug 19$15,000
  4. Aug 13$3,000
  5. Aug 5$1,000
  6. Jul 23$45,987
  7. Jun 26$11,875
  8. Jun 26$60,000
  9. May 11$615,100
  10. May 7$20,000
This block250 to 1,000 ft · 66 permits in 64 projects
  1. Oct 2$6,000
  2. Oct 1$10,000
  3. Sep 29$396,999
  4. Sep 24$90,000
  5. Sep 11$29,324
  6. Sep 9$2,700
  7. Sep 8$23,341
  8. Sep 2$20,000
  9. Sep 2$52,000
  10. Data wiring for office
    68-74 Harrison Av · 370 ft N · Electrical
    Aug 27$3,000
  11. Aug 27$10,000
  12. Including Retail.in the restaurant
    60-62 Beach St · 570 ft NE · Alteration or repair
    Aug 27$7,500
  13. Aug 19$3,000
  14. Aug 17$300,000
  15. Aug 17$5,000
  16. Aug 11$1,500
  17. Aug 6$4,500
  18. Aug 3$69,500
  19. Aug 3$2,500
  20. Jul 30$1,810
  21. Jul 30$14,738
  22. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 290 ft S · Alteration or repair
    Jul 29$27,500
  23. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 260 ft S · Alteration or repair
    Jul 29$27,500
  24. Jul 29$27,500
  25. Jul 29$27,500
  26. Work done in 5th floor office
    68-74 Harrison Av · 370 ft N · Alteration or repair
    Jul 28$62,300
  27. Jul 28$400,000
  28. Remove and replace broken bricks, repoint
    64-68 Beach St · 590 ft NE · Alteration or repair
    Jul 23$267,785
  29. Jul 20$66,817
  30. Jul 16$152,409
  31. Jul 13$1,000
  32. Jul 2$1,000
  33. Remove old suspended ceiling
    90 Tyler St · 440 ft S · Alteration or repair
    Jun 30$176,600
  34. Jun 26$121,914
  35. Jun 16$15,366
  36. Jun 16$22,236
  37. Jun 16$4,000
  38. Jun 15$19,090
  39. Project Address: 112-6 Beach Street
    106-112 Beach St · 960 ft E · Alteration or repair
    Jun 11$80,858
  40. Jun 9$22,000
  41. Jun 9$362,682
  42. Jun 8$10,700
  43. Jun 8$17,000
  44. Jun 8$4,000
  45. Jun 8$4,000
  46. Change Occupancy/no work has to be done
    6-6a Tyler St · 430 ft NE · Alteration or repair
    Jun 5$500
  47. Jun 3$7,978
  48. Jun 1$11,626
  49. May 27$6,000
  50. May 27$2,000
  51. May 26$2,000
  52. May 26$12,000
  53. May 22$9,000
  54. Replacement condenser
    106-112 Beach St · 960 ft E · Electrical
    May 22$1,800
  55. May 21$1,000
  56. May 20$5,000
  57. May 18$4,915
  58. May 15$3,000
  59. May 15$16,200
  60. May 13$1,000
  61. May 12$4,000
  62. May 11$488,050
  63. May 8$6,000
  64. Interior Replacement of insulation
    13-17 Oxford St · 700 ft N · Alteration or repair
    May 6$38,763
Within a quarter mile1,000 ft to ¼ mi · 56 permits in 54 projects
  1. Oct 2$65,000
  2. Oct 2$20,000
  3. Oct 2$196,500
  4. Oct 1$89,172
  5. Oct 1$600,000
  6. Oct 1$3,000,000
  7. Sep 30$725,000
  8. Sep 29$5,113,779
  9. Sep 25$20,475
  10. Sep 16$100,000
  11. Remodel masterbathroom
    558-580 Washington St · 0.23 mi N · Alteration or repair
    Sep 14$10,400
  12. Sep 14$74,290
  13. Sep 11$14,000
  14. Sep 11$2,300
  15. Sep 10$1,000
  16. Sep 9$18,000
  17. Sep 9$4,200
  18. Sep 8$12,585
  19. Equinox Boston Gym
    2-16 Avery St · 0.22 mi NW · Electrical
    Sep 3$5,000
  20. Aug 31$11,000
  21. Aug 18$55,000
  22. Aug 18$2,500
  23. Aug 7$45,672
  24. HVAC Controls
    2-16 Avery St · 0.22 mi NW · Electrical
    Aug 6$45,000
  25. Aug 5$667,993
  26. Aug 4$8,135
  27. Jul 30$93,000
  28. Jul 29$75,000
  29. Jul 29$300,000
  30. Jul 23$8,500
  31. Jul 21$190,000
  32. Renovation 2 bathroom
    66-86 Lincoln St · 0.22 mi NE · Plumbing
    Jul 21not listed
  33. Jul 21$6,000
  34. Jul 14$6,010,000
  35. Jun 26$55,000
  36. Jun 25$160,057
  37. Jun 25$3,600
  38. Equinox Boston Gym
    2-16 Avery St · 0.22 mi NW · Electrical
    Jun 17$70,300
  39. Jun 15$50,000
  40. Interior demolition of partitions
    1 Lincoln St · 0.23 mi NE · Alteration or repair
    Jun 15$500,000
  41. Jun 12$20,000
  42. Jun 10$651,673
  43. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 0.23 mi NE · Alteration or repair
    May 26 to Jun 9$133,000
  44. Jun 5$20,000
  45. Renovations to 5th and 6th floor suites
    1 Lincoln St · 0.23 mi NE · Alteration or repair
    Jun 4$337,125
  46. Jun 3$3,500
  47. Jun 1$41,922
  48. May 20$11,440
  49. May 13$10,000
  50. May 13$35,000
  51. Refresh of existing int
    183-186 Tremont St · 0.23 mi NW · Alteration or repair
    May 12$171,574
  52. May 7$200,000
  53. May 6$1,200
  54. May 5$13,200

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 19:22 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near