Nearby Permits
Map of 241 permits and 1 zoning request within a quarter mile of 57-59 Beach StElectrical, 89-103 Bedford St, Oct 8, 2026Electrical, 21-53 Summer St, Oct 8, 2026Fire systems, 89-103 Bedford St, Oct 7, 2026Fire systems, 89-103 Bedford St, Oct 7, 2026Roofing, 228 Tremont St, Oct 6, 2026Plumbing, 1 Lincoln St, Oct 6, 2026Plumbing, 177 Tremont St, Oct 6, 2026Electrical, 25-43 Kneeland St, Oct 6, 2026Fire systems, 100 Summer St, Oct 6, 2026Alteration or repair, 99 Chauncy St, Oct 5, 2026Electrical, 1 Lincoln St, Oct 5, 2026Alteration or repair, 104-114 Lincoln St, Oct 5, 2026Plumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 100 Summer St, Sep 30, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Electrical, 640-750 Atlantic Av, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Fire systems, 640-750 Atlantic Av, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 640-750 Atlantic Av, Sep 28, 2026Alteration or repair, 640-750 Atlantic Av, Sep 24, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Plumbing, 640-750 Atlantic Av, Sep 21, 2026Electrical, 100 Summer St, Sep 21, 2026Other, 640-750 Atlantic Av, Sep 21, 2026Alteration or repair, 640-750 Atlantic Av, Sep 17, 2026Alteration or repair, 640-750 Atlantic Av, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Plumbing, 100 Summer St, Sep 14, 2026Electrical, 640-750 Atlantic Av, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Fire systems, 640-750 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Plumbing, 640-750 Atlantic Av, Sep 4, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Fire systems, 695 Atlantic Av, Sep 3, 2026Fire systems, 100 Summer St, Sep 3, 2026Electrical, 695 Atlantic Av, Sep 3, 2026Electrical, 100 Summer St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 695 Atlantic Av, Aug 28, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 640-750 Atlantic Av, Aug 25, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Fire systems, 100 Summer St, Aug 20, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Electrical, 100 Summer St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Alteration or repair, 640-750 Atlantic Av, Aug 14, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Alteration or repair, 669-671 Atlantic Av, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Alteration or repair, 695 Atlantic Av, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Plumbing, 100 Summer St, Jul 30, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Electrical, 100 Summer St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 640-750 Atlantic Av, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Electrical, 640-750 Atlantic Av, Jul 23, 2026Electrical, 48-50 Summer St, Jul 22, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Fire systems, 100 Summer St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Electrical, 100 Summer St, Jul 13, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 100 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 640-750 Atlantic Av, Jun 23, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Plumbing, 640-750 Atlantic Av, Jun 12, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 100 Summer St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 640-750 Atlantic Av, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 100 Summer St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Summer St, Jun 3, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Fire systems, 109-119 Beach St, May 15, 2026Sign, 640-750 Atlantic Av, May 14, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 640-750 Atlantic Av, May 12, 2026Electrical, 640-750 Atlantic Av, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 640-750 Atlantic Av, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026Electrical, 640-750 Atlantic Av, May 4, 2026Electrical, 640-750 Atlantic Av, May 1, 2026Zoning request · Filed May 14 · 51 to 59 Stuart St · to change existing static off premise sign to include digital format per Article 11-7 within the Theatre…660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other
  • Zoning request

57-59 Beach St

Boston, MA 02111

At this address
5 permits on record. Newest issued Jun 8: Installation of a fire alarm addressable system which consist of horn…
Within ¼ mile
241 more permits (236 projects) issued since May 1.
Biggest nearby
A $108M project at 640-750 Atlantic Av, permitted Sep 21, within ¼ mile since May 1.
MayJunJulAugSepOct
Here5 permits · 57-59 Beach St
  1. Jun 8$17,000
  2. Nov 6, 2025$50,000
  3. Jun 16, 2025$1,000
  4. Jun 5, 2025$500
  5. Jul 5, 2016$9,000
Next doorunder 250 ft · 8 permits
  1. Data wiring for office
    68-74 Harrison Av · 200 ft W · Electrical
    Aug 27$3,000
  2. Aug 27$10,000
  3. Including Retail.in the restaurant
    60-62 Beach St · 95 ft NE · Alteration or repair
    Aug 27$7,500
  4. Jul 30$1,810
  5. Work done in 5th floor office
    68-74 Harrison Av · 200 ft W · Alteration or repair
    Jul 28$62,300
  6. Remove and replace broken bricks, repoint
    64-68 Beach St · 120 ft NE · Alteration or repair
    Jul 23$267,785
  7. Jun 16$22,236
  8. Change Occupancy/no work has to be done
    6-6a Tyler St · 45 ft S · Alteration or repair
    Jun 5$500
This block250 to 1,000 ft · 111 permits in 106 projects
  1. Oct 8$2,000
  2. Oct 7$8,000
  3. Oct 7$12,000
  4. Oct 6$70,000
  5. Oct 6$22,000
  6. Oct 5$550,958
  7. Oct 5$600,000
  8. Oct 5not listed
  9. Oct 2$6,000
  10. Oct 2$65,000
  11. Oct 2$20,000
  12. Oct 2$196,500
  13. Oct 1$89,172
  14. Access Control and CCTV
    55-57 Hudson St · 580 ft S · Electrical
    Oct 1$160,000
  15. Oct 1$450,000
  16. Oct 1$10,000
  17. Oct 1$600,000
  18. Oct 1$3,000,000
  19. Sep 30$3,500
  20. Sep 30$725,000
  21. Sep 29$396,999
  22. Sep 29$5,113,779
  23. Sep 24$3,500
  24. Sep 24$90,000
  25. Sep 16$100,000
  26. Remodel masterbathroom
    558-580 Washington St · 900 ft NW · Alteration or repair
    Sep 14$10,400
  27. Sep 11$29,324
  28. Sep 11$14,000
  29. Sep 11$10,000
  30. Sep 10$1,000
  31. Sep 9$2,700
  32. Sep 9$18,000
  33. Sep 3$1,784
  34. Sep 3$4,460
  35. Aug 31$11,000
  36. Aug 27$60,000
  37. Aug 27$8,000
  38. Aug 25$10,000
  39. Aug 21$14,000
  40. 8th floor interior demolition
    136-146 Harrison Av · 600 ft SW · Alteration or repair
    Aug 19$15,000
  41. Aug 19$3,000
  42. Aug 18$55,000
  43. Aug 17$300,000
  44. Aug 17$5,000
  45. Aug 14$20,000
  46. Aug 13$3,000
  47. Aug 12$225,000
  48. Aug 10$249,760
  49. Aug 10$10,000
  50. Aug 6$391,910
  51. Aug 6$4,500
  52. Aug 5$1,000
  53. Aug 4$8,135
  54. Aug 4$125,000
  55. Aug 3$69,500
  56. Aug 3$2,500
  57. Jul 30$93,000
  58. Jul 30$14,738
  59. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 720 ft S · Alteration or repair
    Jul 29$27,500
  60. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 710 ft S · Alteration or repair
    Jul 29$27,500
  61. Jul 29$27,500
  62. Jul 29$27,500
  63. Jul 23$45,987
  64. Jul 21$190,000
  65. Renovation 2 bathroom
    66-86 Lincoln St · 720 ft NE · Plumbing
    Jul 21not listed
  66. Jul 16$152,409
  67. Jul 13$1,000
  68. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 890 ft NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  69. Jul 2$1,000
  70. Remove old suspended ceiling
    90 Tyler St · 890 ft S · Alteration or repair
    Jun 30$176,600
  71. Jun 26$11,875
  72. Jun 26$60,000
  73. Jun 26$121,914
  74. Jun 16$4,000
  75. Jun 15$50,000
  76. Interior demolition of partitions
    1 Lincoln St · 760 ft NE · Alteration or repair
    Jun 15$500,000
  77. Jun 12$20,000
  78. Project Address: 112-6 Beach Street
    106-112 Beach St · 670 ft E · Alteration or repair
    Jun 11$80,858
  79. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 760 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  80. Jun 9$362,682
  81. Jun 8$4,000
  82. Jun 8$4,000
  83. Jun 5$20,000
  84. Renovations to 5th and 6th floor suites
    1 Lincoln St · 760 ft NE · Alteration or repair
    Jun 4$337,125
  85. Jun 3$3,500
  86. Jun 3$7,978
  87. Jun 1$11,626
  88. May 27$6,000
  89. May 27$2,000
  90. May 26$2,000
  91. May 26$12,000
  92. May 22$9,000
  93. Replacement condenser
    106-112 Beach St · 670 ft E · Electrical
    May 22$1,800
  94. May 22$3,800
  95. May 21$1,000
  96. May 18$4,915
  97. May 15$16,200
  98. May 13$1,000
  99. May 12$4,000
  100. May 11$488,050
  101. May 11$615,100
  102. May 8$6,000
  103. May 7$3,037
  104. May 7$20,000
  105. Interior Replacement of insulation
    13-17 Oxford St · 270 ft N · Alteration or repair
    May 6$38,763
  106. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 122 permits
  1. Oct 8$815,000
  2. Oct 6$58,816
  3. Oct 6$2,500
  4. Oct 6$312,450
  5. Sep 30$1,000
  6. Sep 30$18,000
  7. Sep 29$110,000
  8. Sep 29$6,700,000
  9. Sep 28$5,800
  10. Sep 28$17,000
  11. Sep 28$25,000
  12. Sep 28$103,000
  13. Unit 4404 South Station Tower
    640-750 Atlantic Av · 0.24 mi E · Alteration or repair
    Sep 24$243,753
  14. Sep 23$14,500
  15. Sep 21$30,000
  16. Sep 21$15,000
  17. Sep 21$108,227,700
  18. Condo renovation on levels 50-51
    640-750 Atlantic Av · 0.24 mi E · Alteration or repair
    Sep 17$2,336,348
  19. Sep 16$730,000
  20. Sep 15$77,839
  21. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.20 mi NE · Alteration or repair
    Sep 14$326,600
  22. Sep 14$15,000
  23. Sep 14$855,000
  24. Sep 14$74,290
  25. Sep 11$42,000
  26. Sep 11$2,300
  27. Sep 9$4,200
  28. Sep 8$12,585
  29. Repairs to rotted steel sidewalk hatch
    185-191 Harrison Av · 0.19 mi SW · Alteration or repair
    Sep 8$23,341
  30. Sep 8$7,000
  31. 100 Summer Street - Jellyfish
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$42,328
  32. 100 Summer Street - DCAMM
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$139,810
  33. Sep 4$40,000
  34. Equinox Boston Gym
    2-16 Avery St · 0.19 mi NW · Electrical
    Sep 3$5,000
  35. Sep 3$44,000
  36. Sep 3$41,000
  37. Sep 3$250,000
  38. Sep 3$150,000
  39. Sep 2$20,000
  40. Sep 2$52,000
  41. Aug 28$380,000
  42. Aug 25$10,000
  43. Aug 21$139,100
  44. Aug 20$95,000
  45. Aug 19$835,000
  46. Aug 18$2,500
  47. Aug 17$74,000
  48. Aug 14$241,628
  49. Aug 14$1,399,886
  50. Aug 11$1,500
  51. Aug 10$906,016
  52. Aug 7$45,672
  53. HVAC Controls
    2-16 Avery St · 0.19 mi NW · Electrical
    Aug 6$45,000
  54. Aug 5$667,993
  55. Aug 5$4,700
  56. Jul 31$10,000
  57. Jul 30$41,000
  58. Jul 29$15,000
  59. Jul 29$75,000
  60. Jul 29$300,000
  61. Jul 28$400,000
  62. Jul 28$12,000
  63. Jul 28$13,895
  64. Jul 27$7,500
  65. Oxford - 16th floor - demolition
    125 Summer St · 0.20 mi NE · Fire systems
    Jul 27$200,000
  66. Jul 25$554,000
  67. Jul 23$8,500
  68. Jul 23$25,000
  69. Jul 22$2,500
  70. Jul 21$317,025
  71. Jul 20$66,817
  72. Jul 14$20,000
  73. Jul 14$90,000
  74. Jul 14$6,010,000
  75. Jul 13$712,000
  76. Jul 10$54,007
  77. Remove and replace roof
    99 Summer St · 0.20 mi NE · Roofing
    Jul 7$92,700
  78. Work is to be done on the 11th
    100 Summer St · 0.23 mi NE · Alteration or repair
    Jul 7$9,652,831
  79. Jul 2$139,100
  80. Jun 29$16,000
  81. Jun 29$350,000
  82. Jun 28$10,000
  83. Jun 26$55,000
  84. Jun 26$10,437
  85. Jun 25$160,057
  86. Jun 25$3,600
  87. Jun 23$3,296,604
  88. Equinox Boston Gym
    2-16 Avery St · 0.19 mi NW · Electrical
    Jun 17$70,300
  89. Jun 15$19,090
  90. Jun 12$7,000
  91. Jun 10$18,900
  92. Jun 10$2,500
  93. Jun 10$50,000
  94. Jun 10$75,000
  95. Jun 10$651,673
  96. Jun 9$22,000
  97. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.20 mi NE · Alteration or repair
    Jun 9$117,625
  98. Water damage in units 3710,3810,3910
    640-750 Atlantic Av · 0.24 mi E · Alteration or repair
    Jun 8$10,000
  99. Jun 5$106,500
  100. Jun 3$41,268
  101. Jun 3$444,280
  102. May 27$1,500
  103. May 21$35,000
  104. May 21$1,500
  105. May 21$369,000
  106. May 20$11,440
  107. May 20$5,000
  108. May 14$13,628
  109. May 13$10,000
  110. May 13$35,000
  111. Refresh of existing int
    183-186 Tremont St · 0.21 mi NW · Alteration or repair
    May 12$171,574
  112. May 12$22,000
  113. May 12$5,000
  114. May 11$16,000
  115. May 11$40,000
  116. May 8$2,000
  117. May 8$3,554,969
  118. May 7$200,000
  119. Plumbing to restaurant
    75-79 Summer St · 0.21 mi N · Plumbing
    May 6$35,000
  120. May 6$1,200
  121. May 4$18,000
  122. May 1$1,500
Zoning requests nearby1 request · as of Oct 10

Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.

  1. Filed May 14
More on this streetBeach St · 10 nearest addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits, zoning requests and hearing dates at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 9, 2026. We checked it Oct 10, 07:33 UTC. See the city's official records.

Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 10, 02:17 UTC.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning