Map of 229 permits within a quarter mile of 60-62 Beach StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 100 Summer St, Sep 30, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Electrical, 640-750 Atlantic Av, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Fire systems, 640-750 Atlantic Av, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 640-750 Atlantic Av, Sep 28, 2026Alteration or repair, 640-750 Atlantic Av, Sep 24, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Plumbing, 640-750 Atlantic Av, Sep 21, 2026Electrical, 100 Summer St, Sep 21, 2026Demolition, 640-750 Atlantic Av, Sep 21, 2026Alteration or repair, 640-750 Atlantic Av, Sep 17, 2026Alteration or repair, 640-750 Atlantic Av, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Plumbing, 100 Summer St, Sep 14, 2026Electrical, 640-750 Atlantic Av, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Fire systems, 640-750 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Plumbing, 640-750 Atlantic Av, Sep 4, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Fire systems, 695 Atlantic Av, Sep 3, 2026Fire systems, 100 Summer St, Sep 3, 2026Electrical, 695 Atlantic Av, Sep 3, 2026Electrical, 100 Summer St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 695 Atlantic Av, Aug 28, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 640-750 Atlantic Av, Aug 25, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Fire systems, 100 Summer St, Aug 20, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Electrical, 100 Summer St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Alteration or repair, 640-750 Atlantic Av, Aug 14, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Alteration or repair, 669-671 Atlantic Av, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Alteration or repair, 695 Atlantic Av, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Plumbing, 100 Summer St, Jul 30, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Electrical, 100 Summer St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 640-750 Atlantic Av, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Electrical, 640-750 Atlantic Av, Jul 23, 2026Electrical, 48-50 Summer St, Jul 22, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Fire systems, 100 Summer St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Electrical, 100 Summer St, Jul 13, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 100 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 640-750 Atlantic Av, Jun 23, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Plumbing, 640-750 Atlantic Av, Jun 12, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 100 Summer St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 640-750 Atlantic Av, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 100 Summer St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Summer St, Jun 3, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Fire systems, 109-119 Beach St, May 15, 2026Sign, 640-750 Atlantic Av, May 14, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 640-750 Atlantic Av, May 12, 2026Electrical, 640-750 Atlantic Av, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 640-750 Atlantic Av, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026Electrical, 640-750 Atlantic Av, May 4, 2026Electrical, 640-750 Atlantic Av, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

60-62 Beach St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $108M demolition at 640-750 Atlantic Av, permitted Sep 21.

14 permits on record here. The newest, Aug 27: Including Retail.in the restaurant. Within a quarter mile, the city has issued 229 more permits (224 projects) since May 1.

MayJunJulAugSepOct
Here14 permits · 60-62 Beach St
  1. Aug 27$7,500
  2. Mar 24, 2025not listed
  3. Jun 23, 2021$500
  4. May 8, 2014$5,000
  5. Mar 23, 2012$4,000
  6. Mar 22, 2012not listed
  7. Feb 29, 2012$5,000
  8. Feb 29, 2012$10,000
  9. Feb 14, 2012$40,800
  10. Feb 2, 2012$1,200
  11. Dec 16, 2011$5,000
  12. Nov 25, 2011not listed
  13. Sep 15, 2011not listed
  14. May 20, 2010$28,500
Next doorunder 250 ft · 10 permits
  1. Jul 23$267,785
  2. Jun 16$22,236
  3. Jun 8$17,000
  4. Jun 8$4,000
  5. Jun 8$4,000
  6. Change Occupancy/no work has to be done
    6-6a Tyler St · 140 ft SW · Alteration or repair
    Jun 5$500
  7. May 22$9,000
  8. May 12$4,000
  9. May 8$6,000
  10. Interior Replacement of insulation
    13-17 Oxford St · 230 ft NW · Alteration or repair
    May 6$38,763
This block250 to 1,000 ft · 118 permits in 113 projects
  1. Oct 2$6,000
  2. Oct 2$65,000
  3. Oct 2$20,000
  4. Oct 2$196,500
  5. Oct 1$89,172
  6. Access Control and CCTV
    55-57 Hudson St · 660 ft S · Electrical
    Oct 1$160,000
  7. Oct 1$450,000
  8. Oct 1$10,000
  9. Oct 1$600,000
  10. Oct 1$3,000,000
  11. Sep 30$3,500
  12. Sep 30$725,000
  13. Sep 30$18,000
  14. Sep 29$396,999
  15. Sep 29$5,113,779
  16. Sep 28$5,800
  17. Sep 28$25,000
  18. Sep 24$3,500
  19. Sep 24$90,000
  20. Sep 23$14,500
  21. Sep 16$100,000
  22. Sep 15$77,839
  23. Re-pointing of stone, parging of stone
    101-103 Summer St · 950 ft NE · Alteration or repair
    Sep 14$326,600
  24. Remodel masterbathroom
    558-580 Washington St · 870 ft NW · Alteration or repair
    Sep 14$10,400
  25. Sep 11$29,324
  26. Sep 11$14,000
  27. Sep 11$10,000
  28. Sep 10$1,000
  29. Sep 9$2,700
  30. Sep 9$18,000
  31. Sep 3$1,784
  32. Sep 3$4,460
  33. Aug 31$11,000
  34. Aug 27$60,000
  35. Aug 27$8,000
  36. Data wiring for office
    68-74 Harrison Av · 280 ft SW · Electrical
    Aug 27$3,000
  37. Aug 27$10,000
  38. Aug 25$10,000
  39. Aug 21$139,100
  40. Aug 21$14,000
  41. 8th floor interior demolition
    136-146 Harrison Av · 690 ft SW · Alteration or repair
    Aug 19$15,000
  42. Aug 19$3,000
  43. Aug 18$55,000
  44. Aug 17$300,000
  45. Aug 17$5,000
  46. Aug 14$20,000
  47. Aug 13$3,000
  48. Aug 12$225,000
  49. Aug 10$249,760
  50. Aug 10$10,000
  51. Aug 6$391,910
  52. Aug 6$4,500
  53. Aug 5$4,700
  54. Aug 5$1,000
  55. Aug 4$8,135
  56. Aug 4$125,000
  57. Aug 3$69,500
  58. Aug 3$2,500
  59. Jul 30$93,000
  60. Jul 30$1,810
  61. Jul 30$14,738
  62. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 810 ft S · Alteration or repair
    Jul 29$27,500
  63. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 800 ft S · Alteration or repair
    Jul 29$27,500
  64. Jul 29$27,500
  65. Jul 29$27,500
  66. Work done in 5th floor office
    68-74 Harrison Av · 280 ft SW · Alteration or repair
    Jul 28$62,300
  67. Jul 28$13,895
  68. Jul 27$200,000
  69. Jul 25$554,000
  70. Jul 23$45,987
  71. Jul 21$317,025
  72. Jul 21$190,000
  73. Jul 21not listed
  74. Jul 16$152,409
  75. Jul 13$1,000
  76. Jul 10$54,007
  77. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 790 ft NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  78. Remove and replace roof
    99 Summer St · 960 ft NE · Roofing
    Jul 7$92,700
  79. Jul 2$139,100
  80. Jul 2$1,000
  81. Remove old suspended ceiling
    90 Tyler St · 980 ft S · Alteration or repair
    Jun 30$176,600
  82. Jun 29$16,000
  83. Jun 26$11,875
  84. Jun 26$60,000
  85. Jun 26$121,914
  86. Jun 16$4,000
  87. Jun 15$50,000
  88. Interior demolition of partitions
    1 Lincoln St · 660 ft NE · Alteration or repair
    Jun 15$500,000
  89. Jun 12$20,000
  90. Project Address: 112-6 Beach Street
    106-112 Beach St · 620 ft E · Alteration or repair
    Jun 11$80,858
  91. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 660 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  92. Interior Lobby ADA lift replacement
    101-103 Summer St · 950 ft NE · Alteration or repair
    Jun 9$117,625
  93. Jun 9$362,682
  94. Jun 5$20,000
  95. Renovations to 5th and 6th floor suites
    1 Lincoln St · 660 ft NE · Alteration or repair
    Jun 4$337,125
  96. Jun 3$7,978
  97. Jun 3$41,268
  98. Jun 1$11,626
  99. May 27$6,000
  100. May 27$2,000
  101. May 26$2,000
  102. May 26$12,000
  103. Replacement condenser
    106-112 Beach St · 620 ft E · Electrical
    May 22$1,800
  104. May 22$3,800
  105. May 21$1,000
  106. May 18$4,915
  107. May 15$16,200
  108. May 13$1,000
  109. May 11$488,050
  110. May 11$615,100
  111. May 7$3,037
  112. May 7$20,000
  113. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 101 permits
  1. Sep 30$1,000
  2. Sep 29$110,000
  3. Sep 29$6,700,000
  4. Sep 28$17,000
  5. Sep 28$103,000
  6. Unit 4404 South Station Tower
    640-750 Atlantic Av · 0.23 mi E · Alteration or repair
    Sep 24$243,753
  7. Sep 21$30,000
  8. Sep 21$15,000
  9. Sep 21$108,227,700
  10. Condo renovation on levels 50-51
    640-750 Atlantic Av · 0.23 mi E · Alteration or repair
    Sep 17$2,336,348
  11. Sep 16$730,000
  12. Sep 14$15,000
  13. Sep 14$855,000
  14. Sep 14$74,290
  15. Sep 11$42,000
  16. Sep 11$2,300
  17. Sep 9$4,200
  18. Sep 8$12,585
  19. Repairs to rotted steel sidewalk hatch
    185-191 Harrison Av · 0.21 mi SW · Alteration or repair
    Sep 8$23,341
  20. Sep 8$7,000
  21. 100 Summer Street - Jellyfish
    100 Summer St · 0.21 mi NE · Electrical
    Sep 8$42,328
  22. 100 Summer Street - DCAMM
    100 Summer St · 0.21 mi NE · Electrical
    Sep 8$139,810
  23. Sep 4$40,000
  24. Equinox Boston Gym
    2-16 Avery St · 0.20 mi NW · Electrical
    Sep 3$5,000
  25. Sep 3$44,000
  26. Sep 3$41,000
  27. Sep 3$250,000
  28. Sep 3$150,000
  29. Sep 2$20,000
  30. Sep 2$52,000
  31. Aug 28$380,000
  32. Aug 25$10,000
  33. Aug 20$95,000
  34. Aug 19$835,000
  35. Aug 18$2,500
  36. Aug 17$74,000
  37. Aug 14$241,628
  38. Aug 14$1,399,886
  39. Aug 11$1,500
  40. Aug 10$906,016
  41. Aug 7$45,672
  42. HVAC Controls
    2-16 Avery St · 0.20 mi NW · Electrical
    Aug 6$45,000
  43. Aug 5$667,993
  44. Jul 31$10,000
  45. Jul 30$41,000
  46. Jul 29$15,000
  47. Jul 29$75,000
  48. Jul 29$300,000
  49. Jul 28$400,000
  50. Jul 28$12,000
  51. Jul 27$7,500
  52. Jul 23$8,500
  53. Jul 23$25,000
  54. Jul 22$2,500
  55. Jul 20$66,817
  56. Jul 14$20,000
  57. Jul 14$90,000
  58. Jul 14$6,010,000
  59. Jul 13$712,000
  60. Work is to be done on the 11th
    100 Summer St · 0.21 mi NE · Alteration or repair
    Jul 7$9,652,831
  61. Jun 29$350,000
  62. Jun 28$10,000
  63. Jun 26$55,000
  64. Jun 26$10,437
  65. Jun 25$160,057
  66. Jun 25$3,600
  67. Jun 23$3,296,604
  68. Equinox Boston Gym
    2-16 Avery St · 0.20 mi NW · Electrical
    Jun 17$70,300
  69. Jun 15$19,090
  70. Jun 12$7,000
  71. Jun 10$18,900
  72. Jun 10$2,500
  73. Jun 10$50,000
  74. Jun 10$75,000
  75. Jun 10$651,673
  76. Jun 9$22,000
  77. Water damage in units 3710,3810,3910
    640-750 Atlantic Av · 0.23 mi E · Alteration or repair
    Jun 8$10,000
  78. Jun 5$106,500
  79. Jun 3$3,500
  80. Jun 3$444,280
  81. May 27$1,500
  82. May 21$35,000
  83. May 21$1,500
  84. May 21$369,000
  85. May 20$11,440
  86. May 20$5,000
  87. May 14$13,628
  88. May 13$10,000
  89. May 13$35,000
  90. Refresh of existing int
    183-186 Tremont St · 0.22 mi W · Alteration or repair
    May 12$171,574
  91. May 12$22,000
  92. May 12$5,000
  93. May 11$16,000
  94. May 11$40,000
  95. May 8$2,000
  96. May 8$3,554,969
  97. May 7$200,000
  98. Plumbing to restaurant
    75-79 Summer St · 0.19 mi N · Plumbing
    May 6$35,000
  99. May 6$1,200
  100. May 4$18,000
  101. May 1$1,500

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 11:39 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near