Nearby Permits
Map of 217 permits within a quarter mile of 41-55 Beach StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 100 Summer St, Sep 30, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Electrical, 100 Summer St, Sep 21, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Plumbing, 100 Summer St, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Electrical, 98-106 Boylston St, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Fire systems, 695 Atlantic Av, Sep 3, 2026Fire systems, 100 Summer St, Sep 3, 2026Electrical, 695 Atlantic Av, Sep 3, 2026Electrical, 100 Summer St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 695 Atlantic Av, Aug 28, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Fire systems, 100 Summer St, Aug 20, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Electrical, 100 Summer St, Aug 19, 2026Fire systems, 151 Tremont St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Plumbing, 151 Tremont St, Aug 12, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Alteration or repair, 695 Atlantic Av, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Plumbing, 100 Summer St, Jul 30, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Electrical, 100 Summer St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Electrical, 100 Stuart St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Fire systems, 100 Summer St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Electrical, 100 Summer St, Jul 13, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 100 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 151 Tremont St, Jul 1, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Fire systems, 151 Tremont St, Jun 23, 2026Plumbing, 151 Tremont St, Jun 18, 2026Fire systems, 151 Tremont St, Jun 18, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 100 Summer St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Other, 821-831 Washington St, Jun 8, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 100 Summer St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Summer St, Jun 3, 2026Alteration or repair, 100 Stuart St, Jun 1, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Alteration or repair, 151 Tremont St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Plumbing, 821-831 Washington St, May 15, 2026Fire systems, 109-119 Beach St, May 15, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 26-30 West St, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 151 Tremont St, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Alteration or repair, 151 Tremont St, May 7, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

41-55 Beach St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $9.7M alteration or repair at 100 Summer St, permitted Jul 7.

40 permits on record here. The newest, Oct 17, 2024: Garage maintenance and repairs. Within a quarter mile, the city has issued 217 more permits (212 projects) since May 1.

MayJunJulAugSepOct
Here40 permits · 41-55 Beach St
  1. Garage maintenance and repairs
    Alteration or repair
    Oct 17, 2024$234,500
  2. Aug 23, 2023$3,500
  3. Aug 23, 2023$4,200
  4. Jul 28, 2023$8,000
  5. Apr 20, 2023$2,500
  6. Apr 20, 2023$25,000
  7. Apr 7, 2023$120,000
  8. Jan 5, 2023$25,000
  9. Dec 8, 2020$500
  10. Dec 4, 2020$5,000
  11. Feb 20, 2020$10,000
  12. Dec 18, 2019$4,800
  13. Nov 14, 2019$45,000
  14. Nov 27, 2018$4,000
  15. Jun 23, 2018$1,000
  16. Nov 3, 2017$6,500
  17. Oct 20, 2017$4,800
  18. Jun 5, 2017$8,000
  19. Feb 13, 2017$3,800
  20. Mar 10, 2016$15,000
  21. Jan 6, 2016$5,000
  22. Dec 30, 2015$7,000
  23. Dec 28, 2015$1,500
  24. Dec 28, 2015$750
  25. Oct 5, 2015$9,000
  26. Jul 14, 2015$5,000
  27. Jun 11, 2015$15,000
  28. Jun 11, 2015$10,000
  29. Apr 13, 2015$6,500
  30. Dec 2, 2014$20,000
  31. Oct 4, 2013$18,500
  32. Sep 12, 2013not listed
  33. Sep 9, 2013$37,000
  34. Jul 22, 2013$25,000
  35. Jul 22, 2013$25,000
  36. Apr 12, 2013$5,000
  37. Change Occupancy from
    Alteration or repair
    Mar 20, 2013$105,000
  38. Sep 13, 2010$350
  39. Aug 10, 2010$86,000
  40. Feb 26, 2010$500
Next doorunder 250 ft · 20 permits
  1. Data wiring for office
    68-74 Harrison Av · 85 ft SW · Electrical
    Aug 27$3,000
  2. Aug 27$10,000
  3. Including Retail.in the restaurant
    60-62 Beach St · 220 ft E · Alteration or repair
    Aug 27$7,500
  4. Aug 3$69,500
  5. Jul 30$1,810
  6. Work done in 5th floor office
    68-74 Harrison Av · 85 ft SW · Alteration or repair
    Jul 28$62,300
  7. Jul 13$1,000
  8. Jun 16$22,236
  9. Jun 8$17,000
  10. Jun 8$4,000
  11. Jun 8$4,000
  12. Change Occupancy/no work has to be done
    6-6a Tyler St · 160 ft SE · Alteration or repair
    Jun 5$500
  13. Jun 3$7,978
  14. Jun 1$11,626
  15. May 22$9,000
  16. May 21$1,000
  17. May 13$1,000
  18. May 12$4,000
  19. May 8$6,000
  20. Interior Replacement of insulation
    13-17 Oxford St · 240 ft N · Alteration or repair
    May 6$38,763
This block250 to 1,000 ft · 121 permits in 116 projects
  1. Oct 2$6,000
  2. Oct 2$65,000
  3. Oct 2$20,000
  4. Oct 2$196,500
  5. Oct 1$89,172
  6. Access Control and CCTV
    55-57 Hudson St · 590 ft S · Electrical
    Oct 1$160,000
  7. Oct 1$450,000
  8. Oct 1$10,000
  9. Oct 1$600,000
  10. Oct 1$3,000,000
  11. Sep 30$3,500
  12. Sep 30$725,000
  13. Sep 29$396,999
  14. Sep 29$5,113,779
  15. Sep 24$3,500
  16. Sep 24$90,000
  17. Sep 16$100,000
  18. Remodel masterbathroom
    558-580 Washington St · 810 ft N · Alteration or repair
    Sep 14$10,400
  19. Sep 14$74,290
  20. Sep 11$29,324
  21. Sep 11$10,000
  22. Sep 11$2,300
  23. Sep 9$2,700
  24. Sep 9$18,000
  25. Sep 9$4,200
  26. Sep 8$12,585
  27. Sep 8$23,341
  28. Sep 8$7,000
  29. Sep 3$1,784
  30. Equinox Boston Gym
    2-16 Avery St · 880 ft NW · Electrical
    Sep 3$5,000
  31. Sep 3$4,460
  32. Sep 2$20,000
  33. Sep 2$52,000
  34. Aug 31$11,000
  35. Aug 27$60,000
  36. Aug 27$8,000
  37. Aug 25$10,000
  38. Aug 21$14,000
  39. 8th floor interior demolition
    136-146 Harrison Av · 570 ft S · Alteration or repair
    Aug 19$15,000
  40. Aug 19$3,000
  41. Aug 18$55,000
  42. Aug 18$2,500
  43. Aug 17$74,000
  44. Aug 17$300,000
  45. Aug 17$5,000
  46. Aug 14$20,000
  47. Aug 13$3,000
  48. Aug 12$225,000
  49. Aug 10$249,760
  50. Aug 10$10,000
  51. Aug 7$45,672
  52. Aug 6$391,910
  53. Aug 6$4,500
  54. HVAC Controls
    2-16 Avery St · 880 ft NW · Electrical
    Aug 6$45,000
  55. Aug 5$667,993
  56. Aug 5$1,000
  57. Aug 4$8,135
  58. Aug 4$125,000
  59. Aug 3$2,500
  60. Jul 30$93,000
  61. Jul 30$14,738
  62. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 730 ft S · Alteration or repair
    Jul 29$27,500
  63. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 710 ft S · Alteration or repair
    Jul 29$27,500
  64. Jul 29$27,500
  65. Jul 29$27,500
  66. Jul 29$75,000
  67. Jul 29$300,000
  68. Jul 28$400,000
  69. Jul 27$7,500
  70. Jul 23$267,785
  71. Jul 23$45,987
  72. Jul 23$8,500
  73. Jul 21$190,000
  74. Jul 21not listed
  75. Jul 16$152,409
  76. Jul 14$20,000
  77. Jul 14$6,010,000
  78. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 980 ft NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  79. Jul 2$1,000
  80. Remove old suspended ceiling
    90 Tyler St · 890 ft S · Alteration or repair
    Jun 30$176,600
  81. Jun 28$10,000
  82. Jun 26$11,875
  83. Jun 26$60,000
  84. Jun 26$121,914
  85. Equinox Boston Gym
    2-16 Avery St · 880 ft NW · Electrical
    Jun 17$70,300
  86. Jun 16$4,000
  87. Jun 15$50,000
  88. Interior demolition of partitions
    1 Lincoln St · 840 ft NE · Alteration or repair
    Jun 15$500,000
  89. Jun 15$19,090
  90. Jun 12$20,000
  91. Project Address: 112-6 Beach Street
    106-112 Beach St · 830 ft E · Alteration or repair
    Jun 11$80,858
  92. Jun 10$651,673
  93. Jun 9$22,000
  94. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 840 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  95. Jun 9$362,682
  96. Jun 5$20,000
  97. Renovations to 5th and 6th floor suites
    1 Lincoln St · 840 ft NE · Alteration or repair
    Jun 4$337,125
  98. Jun 3$3,500
  99. May 27$6,000
  100. May 27$2,000
  101. May 27$1,500
  102. May 26$2,000
  103. May 26$12,000
  104. Replacement condenser
    106-112 Beach St · 830 ft E · Electrical
    May 22$1,800
  105. May 22$3,800
  106. May 18$4,915
  107. May 15$16,200
  108. May 13$10,000
  109. May 13$35,000
  110. Refresh of existing int
    183-186 Tremont St · 980 ft NW · Alteration or repair
    May 12$171,574
  111. May 11$488,050
  112. May 11$615,100
  113. May 7$3,037
  114. May 7$20,000
  115. May 6$1,200
  116. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 76 permits
  1. Sep 30$1,000
  2. Sep 30$18,000
  3. Sep 29$110,000
  4. Sep 28$5,800
  5. Sep 28$25,000
  6. Sep 23$14,500
  7. Sep 21$15,000
  8. Sep 15$77,839
  9. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.21 mi NE · Alteration or repair
    Sep 14$326,600
  10. Sep 14$15,000
  11. Sep 11$14,000
  12. Sep 10$1,000
  13. Sep 10$150,000
  14. 100 Summer Street - Jellyfish
    100 Summer St · 0.24 mi NE · Electrical
    Sep 8$42,328
  15. 100 Summer Street - DCAMM
    100 Summer St · 0.24 mi NE · Electrical
    Sep 8$139,810
  16. Sep 3$44,000
  17. Sep 3$41,000
  18. Sep 3$250,000
  19. Sep 3$150,000
  20. Aug 28$380,000
  21. Aug 21$139,100
  22. Aug 20$95,000
  23. Aug 19$835,000
  24. Aug 19$19,800
  25. Aug 12$10,000
  26. Aug 11$1,500
  27. Aug 10$906,016
  28. Aug 5$4,700
  29. Jul 31$10,000
  30. Jul 30$41,000
  31. Jul 29$15,000
  32. Jul 28$13,895
  33. Oxford - 16th floor - demolition
    125 Summer St · 0.22 mi NE · Fire systems
    Jul 27$200,000
  34. Jul 25$554,000
  35. Jul 21$317,025
  36. Jul 21$6,000
  37. Jul 20$66,817
  38. Jul 14$90,000
  39. Jul 13$712,000
  40. Jul 10$54,007
  41. Remove and replace roof
    99 Summer St · 0.21 mi NE · Roofing
    Jul 7$92,700
  42. Work is to be done on the 11th
    100 Summer St · 0.24 mi NE · Alteration or repair
    Jul 7$9,652,831
  43. Jul 2$139,100
  44. Jul 1$28,000
  45. Jun 29$16,000
  46. Jun 29$350,000
  47. Jun 26$55,000
  48. Jun 26$10,437
  49. Jun 25$160,057
  50. Jun 25$3,600
  51. Jun 23$68,000
  52. Jun 18$24,600
  53. Jun 18$23,000
  54. Jun 10$18,900
  55. Jun 10$2,500
  56. Jun 10$50,000
  57. Jun 10$75,000
  58. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.21 mi NE · Alteration or repair
    Jun 9$117,625
  59. Jun 8$10,700
  60. Jun 5$106,500
  61. Jun 3$41,268
  62. Jun 3$444,280
  63. Jun 1$41,922
  64. May 21$369,000
  65. May 20$11,440
  66. May 20$5,000
  67. May 20$538,946
  68. May 15$3,000
  69. May 12$22,000
  70. May 11$5,000
  71. May 11$40,000
  72. Demo, temp lights
    151 Tremont St · 0.25 mi NW · Electrical
    May 8$38,000
  73. May 8$3,554,969
  74. Removal of interior walls, sheet rock
    151 Tremont St · 0.25 mi NW · Alteration or repair
    May 7$500
  75. May 7$200,000
  76. Plumbing to restaurant
    75-79 Summer St · 0.22 mi NE · Plumbing
    May 6$35,000

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 11:32 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near