Nearby Permits
Map of 218 permits within a quarter mile of 48 Beach StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 100 Summer St, Sep 30, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Electrical, 100 Summer St, Sep 21, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Plumbing, 100 Summer St, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Electrical, 98-106 Boylston St, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Fire systems, 695 Atlantic Av, Sep 3, 2026Fire systems, 100 Summer St, Sep 3, 2026Electrical, 695 Atlantic Av, Sep 3, 2026Electrical, 100 Summer St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 695 Atlantic Av, Aug 28, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Fire systems, 100 Summer St, Aug 20, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Electrical, 100 Summer St, Aug 19, 2026Fire systems, 151 Tremont St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Alteration or repair, 669-671 Atlantic Av, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Plumbing, 151 Tremont St, Aug 12, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Alteration or repair, 695 Atlantic Av, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Plumbing, 100 Summer St, Jul 30, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Electrical, 100 Summer St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Electrical, 48-50 Summer St, Jul 22, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Electrical, 100 Stuart St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Fire systems, 100 Summer St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Electrical, 100 Summer St, Jul 13, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 100 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 151 Tremont St, Jul 1, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Fire systems, 151 Tremont St, Jun 23, 2026Plumbing, 151 Tremont St, Jun 18, 2026Fire systems, 151 Tremont St, Jun 18, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 100 Summer St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Electrical, 60-70 Temple Pl, Jun 8, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 100 Summer St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Summer St, Jun 3, 2026Alteration or repair, 100 Stuart St, Jun 1, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Alteration or repair, 151 Tremont St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Fire systems, 109-119 Beach St, May 15, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 26-30 West St, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 151 Tremont St, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Alteration or repair, 151 Tremont St, May 7, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other

48 Beach St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $9.7M alteration or repair at 100 Summer St, permitted Jul 7.

Five permits on record here. The newest, Jun 17, 2025: This permit is for FIVE SPICES RESTAURANT. Within a quarter mile, the city has issued 218 more permits (213 projects) since May 1.

MayJunJulAugSepOct
Here5 permits · 48 Beach St
  1. Jun 17, 2025$8,000
  2. Jun 10, 2025$2,000
  3. May 21, 2025$58,000
  4. Jul 21, 2017$21,645
  5. Feb 28, 2017$2,000
Next doorunder 250 ft · 17 permits
  1. Data wiring for office
    68-74 Harrison Av · 190 ft SW · Electrical
    Aug 27$3,000
  2. Aug 27$10,000
  3. Including Retail.in the restaurant
    60-62 Beach St · 190 ft E · Alteration or repair
    Aug 27$7,500
  4. Work done in 5th floor office
    68-74 Harrison Av · 190 ft SW · Alteration or repair
    Jul 28$62,300
  5. Jul 23$267,785
  6. Jul 13$1,000
  7. Jun 16$22,236
  8. Jun 8$17,000
  9. Jun 8$4,000
  10. Jun 8$4,000
  11. Change Occupancy/no work has to be done
    6-6a Tyler St · 200 ft SE · Alteration or repair
    Jun 5$500
  12. Jun 3$7,978
  13. Jun 1$11,626
  14. May 22$9,000
  15. May 12$4,000
  16. May 8$6,000
  17. Interior Replacement of insulation
    13-17 Oxford St · 150 ft N · Alteration or repair
    May 6$38,763
This block250 to 1,000 ft · 118 permits in 113 projects
  1. Oct 2$6,000
  2. Oct 2$65,000
  3. Oct 2$20,000
  4. Oct 2$196,500
  5. Oct 1$89,172
  6. Access Control and CCTV
    55-57 Hudson St · 680 ft S · Electrical
    Oct 1$160,000
  7. Oct 1$450,000
  8. Oct 1$10,000
  9. Oct 1$600,000
  10. Oct 1$3,000,000
  11. Sep 30$3,500
  12. Sep 30$725,000
  13. Sep 29$396,999
  14. Sep 29$5,113,779
  15. Sep 24$3,500
  16. Sep 24$90,000
  17. Sep 16$100,000
  18. Remodel masterbathroom
    558-580 Washington St · 740 ft NW · Alteration or repair
    Sep 14$10,400
  19. Sep 14$74,290
  20. Sep 11$29,324
  21. Sep 11$10,000
  22. Sep 11$2,300
  23. Sep 9$2,700
  24. Sep 9$18,000
  25. Sep 9$4,200
  26. Sep 8$12,585
  27. Sep 8$7,000
  28. Sep 3$1,784
  29. Equinox Boston Gym
    2-16 Avery St · 860 ft NW · Electrical
    Sep 3$5,000
  30. Sep 3$4,460
  31. Aug 31$11,000
  32. Aug 27$60,000
  33. Aug 27$8,000
  34. Aug 25$10,000
  35. Aug 21$14,000
  36. 8th floor interior demolition
    136-146 Harrison Av · 670 ft S · Alteration or repair
    Aug 19$15,000
  37. Aug 19$3,000
  38. Aug 18$55,000
  39. Aug 18$2,500
  40. Aug 17$74,000
  41. Aug 17$300,000
  42. Aug 17$5,000
  43. Aug 14$20,000
  44. Aug 13$3,000
  45. Aug 12$225,000
  46. Aug 10$249,760
  47. Aug 10$10,000
  48. Aug 7$45,672
  49. Aug 6$391,910
  50. Aug 6$4,500
  51. HVAC Controls
    2-16 Avery St · 860 ft NW · Electrical
    Aug 6$45,000
  52. Aug 5$667,993
  53. Aug 5$1,000
  54. Aug 4$8,135
  55. Aug 4$125,000
  56. Aug 3$69,500
  57. Aug 3$2,500
  58. Jul 30$93,000
  59. Jul 30$1,810
  60. Jul 30$14,738
  61. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 820 ft S · Alteration or repair
    Jul 29$27,500
  62. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 800 ft S · Alteration or repair
    Jul 29$27,500
  63. Jul 29$27,500
  64. Jul 29$27,500
  65. Jul 29$75,000
  66. Jul 29$300,000
  67. Jul 27$7,500
  68. Jul 23$45,987
  69. Jul 23$8,500
  70. Jul 21$190,000
  71. Jul 21not listed
  72. Jul 16$152,409
  73. Jul 14$20,000
  74. Jul 14$6,010,000
  75. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 890 ft NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  76. Jul 2$1,000
  77. Remove old suspended ceiling
    90 Tyler St · 990 ft S · Alteration or repair
    Jun 30$176,600
  78. Jun 28$10,000
  79. Jun 26$11,875
  80. Jun 26$60,000
  81. Jun 26$121,914
  82. Equinox Boston Gym
    2-16 Avery St · 860 ft NW · Electrical
    Jun 17$70,300
  83. Jun 16$4,000
  84. Jun 15$50,000
  85. Interior demolition of partitions
    1 Lincoln St · 750 ft NE · Alteration or repair
    Jun 15$500,000
  86. Jun 12$20,000
  87. Project Address: 112-6 Beach Street
    106-112 Beach St · 810 ft E · Alteration or repair
    Jun 11$80,858
  88. Jun 10$651,673
  89. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 750 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  90. Jun 9$362,682
  91. Jun 5$20,000
  92. Renovations to 5th and 6th floor suites
    1 Lincoln St · 750 ft NE · Alteration or repair
    Jun 4$337,125
  93. Jun 3$3,500
  94. May 27$6,000
  95. May 27$2,000
  96. May 27$1,500
  97. May 26$2,000
  98. May 26$12,000
  99. Replacement condenser
    106-112 Beach St · 810 ft E · Electrical
    May 22$1,800
  100. May 22$3,800
  101. May 21$1,000
  102. May 18$4,915
  103. May 15$16,200
  104. May 13$1,000
  105. May 13$10,000
  106. May 13$35,000
  107. Refresh of existing int
    183-186 Tremont St · 980 ft W · Alteration or repair
    May 12$171,574
  108. May 11$488,050
  109. May 11$615,100
  110. May 7$3,037
  111. May 7$20,000
  112. May 6$1,200
  113. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 83 permits
  1. Sep 30$1,000
  2. Sep 30$18,000
  3. Sep 29$110,000
  4. Sep 28$5,800
  5. Sep 28$25,000
  6. Sep 23$14,500
  7. Sep 21$15,000
  8. Sep 15$77,839
  9. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.19 mi NE · Alteration or repair
    Sep 14$326,600
  10. Sep 14$15,000
  11. Sep 11$14,000
  12. Sep 10$1,000
  13. Sep 10$150,000
  14. Repairs to rotted steel sidewalk hatch
    185-191 Harrison Av · 0.20 mi SW · Alteration or repair
    Sep 8$23,341
  15. 100 Summer Street - Jellyfish
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$42,328
  16. 100 Summer Street - DCAMM
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$139,810
  17. Sep 3$44,000
  18. Sep 3$41,000
  19. Sep 3$250,000
  20. Sep 3$150,000
  21. Sep 2$20,000
  22. Sep 2$52,000
  23. Aug 28$380,000
  24. Aug 21$139,100
  25. Aug 20$95,000
  26. Aug 19$835,000
  27. Aug 19$19,800
  28. Aug 14$1,399,886
  29. Aug 12$10,000
  30. Aug 11$1,500
  31. Aug 10$906,016
  32. Aug 5$4,700
  33. Jul 31$10,000
  34. Jul 30$41,000
  35. Jul 29$15,000
  36. Jul 28$400,000
  37. Jul 28$13,895
  38. Oxford - 16th floor - demolition
    125 Summer St · 0.20 mi NE · Fire systems
    Jul 27$200,000
  39. Jul 25$554,000
  40. Jul 22$2,500
  41. Jul 21$317,025
  42. Jul 21$6,000
  43. Jul 20$66,817
  44. Jul 14$90,000
  45. Jul 13$712,000
  46. Jul 10$54,007
  47. Remove and replace roof
    99 Summer St · 0.19 mi NE · Roofing
    Jul 7$92,700
  48. Work is to be done on the 11th
    100 Summer St · 0.23 mi NE · Alteration or repair
    Jul 7$9,652,831
  49. Jul 2$139,100
  50. Jul 1$28,000
  51. Jun 29$16,000
  52. Jun 29$350,000
  53. Jun 26$55,000
  54. Jun 26$10,437
  55. Jun 25$160,057
  56. Jun 25$3,600
  57. Jun 23$68,000
  58. Jun 18$24,600
  59. Jun 18$23,000
  60. Jun 15$19,090
  61. Jun 10$18,900
  62. Jun 10$2,500
  63. Jun 10$50,000
  64. Jun 10$75,000
  65. Jun 9$22,000
  66. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.19 mi NE · Alteration or repair
    Jun 9$117,625
  67. Jun 8$2,115
  68. Jun 5$106,500
  69. Jun 3$41,268
  70. Jun 3$444,280
  71. Jun 1$41,922
  72. May 21$369,000
  73. May 20$11,440
  74. May 20$5,000
  75. May 20$538,946
  76. May 12$22,000
  77. May 11$5,000
  78. May 11$40,000
  79. Demo, temp lights
    151 Tremont St · 0.24 mi NW · Electrical
    May 8$38,000
  80. May 8$3,554,969
  81. Removal of interior walls, sheet rock
    151 Tremont St · 0.24 mi NW · Alteration or repair
    May 7$500
  82. May 7$200,000
  83. Plumbing to restaurant
    75-79 Summer St · 0.20 mi NE · Plumbing
    May 6$35,000

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 15:19 UTC. Official data.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near