Nearby Permits
Map of 210 permits within a quarter mile of 8-8a Hudson StPlumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Electrical, 100 Summer St, Sep 30, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Electrical, 125 Summer St, Sep 30, 2026Electrical, 640-750 Atlantic Av, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Fire systems, 125 Summer St, Sep 28, 2026Fire systems, 640-750 Atlantic Av, Sep 28, 2026Electrical, 125 Summer St, Sep 28, 2026Electrical, 640-750 Atlantic Av, Sep 28, 2026Alteration or repair, 640-750 Atlantic Av, Sep 24, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Plumbing, 640-750 Atlantic Av, Sep 21, 2026Electrical, 100 Summer St, Sep 21, 2026Demolition, 640-750 Atlantic Av, Sep 21, 2026Alteration or repair, 640-750 Atlantic Av, Sep 17, 2026Alteration or repair, 640-750 Atlantic Av, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Fire systems, 125 Summer St, Sep 15, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Plumbing, 100 Summer St, Sep 14, 2026Electrical, 640-750 Atlantic Av, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Fire systems, 640-750 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Electrical, 100 Summer St, Sep 8, 2026Plumbing, 640-750 Atlantic Av, Sep 4, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Fire systems, 695 Atlantic Av, Sep 3, 2026Fire systems, 100 Summer St, Sep 3, 2026Electrical, 695 Atlantic Av, Sep 3, 2026Electrical, 100 Summer St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 695 Atlantic Av, Aug 28, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 640-750 Atlantic Av, Aug 25, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Fire systems, 125 Summer St, Aug 21, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Fire systems, 100 Summer St, Aug 20, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Electrical, 100 Summer St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Alteration or repair, 640-750 Atlantic Av, Aug 14, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Alteration or repair, 669-671 Atlantic Av, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Alteration or repair, 695 Atlantic Av, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 125 Summer St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Plumbing, 100 Summer St, Jul 30, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Electrical, 100 Summer St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 640-750 Atlantic Av, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Fire systems, 125 Summer St, Jul 27, 2026Alteration or repair, 125 Summer St, Jul 25, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Electrical, 640-750 Atlantic Av, Jul 23, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Fire systems, 100 Summer St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Electrical, 100 Summer St, Jul 13, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 100 Summer St, Jul 7, 2026Electrical, 125 Summer St, Jul 2, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Plumbing, 125 Summer St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Alteration or repair, 640-750 Atlantic Av, Jun 23, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Plumbing, 640-750 Atlantic Av, Jun 12, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Electrical, 100 Summer St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 640-750 Atlantic Av, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 100 Summer St, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Sign, 125 Summer St, Jun 3, 2026Alteration or repair, 100 Summer St, Jun 3, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Electrical, 640-750 Atlantic Av, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Electrical, 1-3 Nassau St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Fire systems, 109-119 Beach St, May 15, 2026Sign, 640-750 Atlantic Av, May 14, 2026Electrical, 75 Harrison Av, May 13, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 640-750 Atlantic Av, May 12, 2026Electrical, 640-750 Atlantic Av, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 640-750 Atlantic Av, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026Electrical, 640-750 Atlantic Av, May 4, 2026Electrical, 640-750 Atlantic Av, May 1, 2026660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Demolition
  • Paperwork or other

8-8a Hudson St

Boston, MA 02111

The biggest project within a quarter mile since May 1: a $108M demolition at 640-750 Atlantic Av, permitted Sep 21.

One permit here in the last two years. The newest, Jan 9: At Risk - Foundation for new 6-story mixed-use building with basement in existing vacant lots. Within a quarter mile, the city has issued 210 more permits (205 projects) since May 1.

The city's data portal didn't answer in time. "Here" shows our copy of the last two years, which we checked 2026-10-05 18:15 UTC. Data status

MayJunJulAugSepOct
Here1 permit · 8-8a Hudson St
  1. Jan 9$2,000,000
Next doorunder 250 ft · 5 permits
  1. Including Retail.in the restaurant
    60-62 Beach St · 230 ft N · Alteration or repair
    Aug 27$7,500
  2. Jul 23$267,785
  3. Jul 2$1,000
  4. Jun 8$17,000
  5. Change Occupancy/no work has to be done
    6-6a Tyler St · 180 ft NW · Alteration or repair
    Jun 5$500
This block250 to 1,000 ft · 102 permits in 97 projects
  1. Oct 2$6,000
  2. Oct 2$65,000
  3. Oct 2$20,000
  4. Oct 2$196,500
  5. Oct 1$89,172
  6. Access Control and CCTV
    55-57 Hudson St · 500 ft SW · Electrical
    Oct 1$160,000
  7. Oct 1$450,000
  8. Oct 1$10,000
  9. Oct 1$600,000
  10. Oct 1$3,000,000
  11. Sep 30$725,000
  12. Sep 29$396,999
  13. Sep 29$5,113,779
  14. Sep 24$90,000
  15. Sep 16$100,000
  16. Sep 11$29,324
  17. Sep 11$14,000
  18. Sep 11$10,000
  19. Sep 10$1,000
  20. Sep 9$2,700
  21. Sep 9$18,000
  22. Sep 8$23,341
  23. Sep 3$1,784
  24. Sep 3$4,460
  25. Sep 3$44,000
  26. Sep 3$250,000
  27. Aug 31$11,000
  28. Aug 28$380,000
  29. Data wiring for office
    68-74 Harrison Av · 350 ft W · Electrical
    Aug 27$3,000
  30. Aug 27$10,000
  31. Aug 25$10,000
  32. 8th floor interior demolition
    136-146 Harrison Av · 570 ft SW · Alteration or repair
    Aug 19$15,000
  33. Aug 19$3,000
  34. Aug 18$55,000
  35. Aug 17$300,000
  36. Aug 17$5,000
  37. Aug 14$20,000
  38. Aug 13$3,000
  39. Aug 12$225,000
  40. Aug 10$249,760
  41. Aug 10$906,016
  42. Aug 6$391,910
  43. Aug 6$4,500
  44. Aug 5$1,000
  45. Aug 4$8,135
  46. Aug 4$125,000
  47. Aug 3$69,500
  48. Aug 3$2,500
  49. Jul 30$93,000
  50. Jul 30$1,810
  51. Jul 30$14,738
  52. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 630 ft SW · Alteration or repair
    Jul 29$27,500
  53. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 630 ft SW · Alteration or repair
    Jul 29$27,500
  54. Jul 29$27,500
  55. Jul 29$27,500
  56. Work done in 5th floor office
    68-74 Harrison Av · 350 ft W · Alteration or repair
    Jul 28$62,300
  57. Jul 23$45,987
  58. Jul 21$190,000
  59. Renovation 2 bathroom
    66-86 Lincoln St · 680 ft NE · Plumbing
    Jul 21not listed
  60. Jul 16$152,409
  61. Jul 13$1,000
  62. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 940 ft NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  63. Remove old suspended ceiling
    90 Tyler St · 810 ft SW · Alteration or repair
    Jun 30$176,600
  64. Jun 26$11,875
  65. Jun 26$60,000
  66. Jun 26$121,914
  67. Jun 16$22,236
  68. Jun 15$50,000
  69. Interior demolition of partitions
    1 Lincoln St · 820 ft N · Alteration or repair
    Jun 15$500,000
  70. Jun 12$20,000
  71. Project Address: 112-6 Beach Street
    106-112 Beach St · 530 ft E · Alteration or repair
    Jun 11$80,858
  72. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 820 ft N · Alteration or repair
    May 26 to Jun 9$133,000
  73. Jun 9$362,682
  74. Jun 8$4,000
  75. Jun 8$4,000
  76. Jun 5$20,000
  77. Renovations to 5th and 6th floor suites
    1 Lincoln St · 820 ft N · Alteration or repair
    Jun 4$337,125
  78. Jun 3$7,978
  79. Jun 1$11,626
  80. May 27$6,000
  81. May 27$2,000
  82. May 26$2,000
  83. May 26$12,000
  84. May 22$9,000
  85. Replacement condenser
    106-112 Beach St · 530 ft E · Electrical
    May 22$1,800
  86. May 22$3,800
  87. May 21$1,000
  88. May 15$16,200
  89. May 13$1,000
  90. May 12$4,000
  91. May 11$488,050
  92. May 11$615,100
  93. May 8$6,000
  94. May 7$3,037
  95. May 7$20,000
  96. Interior Replacement of insulation
    13-17 Oxford St · 460 ft NW · Alteration or repair
    May 6$38,763
  97. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 103 permits
  1. Sep 30$1,000
  2. Sep 30$3,500
  3. Sep 30$18,000
  4. Sep 29$6,700,000
  5. Sep 28$5,800
  6. Sep 28$17,000
  7. Sep 28$25,000
  8. Sep 28$103,000
  9. Unit 4404 South Station Tower
    640-750 Atlantic Av · 0.20 mi E · Alteration or repair
    Sep 24$243,753
  10. Sep 24$3,500
  11. Sep 23$14,500
  12. Sep 21$30,000
  13. Sep 21$15,000
  14. Sep 21$108,227,700
  15. Condo renovation on levels 50-51
    640-750 Atlantic Av · 0.20 mi E · Alteration or repair
    Sep 17$2,336,348
  16. Sep 16$730,000
  17. Sep 15$77,839
  18. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.21 mi NE · Alteration or repair
    Sep 14$326,600
  19. Remodel masterbathroom
    558-580 Washington St · 0.21 mi NW · Alteration or repair
    Sep 14$10,400
  20. Sep 14$15,000
  21. Sep 14$855,000
  22. Sep 11$42,000
  23. Sep 9$4,200
  24. Sep 8$12,585
  25. Sep 8$7,000
  26. 100 Summer Street - Jellyfish
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$42,328
  27. 100 Summer Street - DCAMM
    100 Summer St · 0.23 mi NE · Electrical
    Sep 8$139,810
  28. Sep 4$40,000
  29. Equinox Boston Gym
    2-16 Avery St · 0.23 mi NW · Electrical
    Sep 3$5,000
  30. Sep 3$41,000
  31. Sep 3$150,000
  32. Sep 2$20,000
  33. Sep 2$52,000
  34. Aug 27$60,000
  35. Aug 27$8,000
  36. Aug 25$10,000
  37. Aug 21$139,100
  38. Aug 21$14,000
  39. Aug 20$95,000
  40. Aug 19$835,000
  41. Aug 17$74,000
  42. Aug 14$241,628
  43. Aug 14$1,399,886
  44. Aug 11$1,500
  45. Aug 10$10,000
  46. Aug 7$45,672
  47. HVAC Controls
    2-16 Avery St · 0.23 mi NW · Electrical
    Aug 6$45,000
  48. Aug 5$667,993
  49. Aug 5$4,700
  50. Jul 31$10,000
  51. Jul 30$41,000
  52. Jul 29$15,000
  53. Jul 29$75,000
  54. Jul 29$300,000
  55. Jul 28$400,000
  56. Jul 28$12,000
  57. Jul 28$13,895
  58. Jul 27$7,500
  59. Oxford - 16th floor - demolition
    125 Summer St · 0.20 mi NE · Fire systems
    Jul 27$200,000
  60. Jul 25$554,000
  61. Jul 23$8,500
  62. Jul 23$25,000
  63. Jul 21$317,025
  64. Jul 14$20,000
  65. Jul 14$90,000
  66. Jul 14$6,010,000
  67. Jul 13$712,000
  68. Jul 10$54,007
  69. Remove and replace roof
    99 Summer St · 0.21 mi N · Roofing
    Jul 7$92,700
  70. Work is to be done on the 11th
    100 Summer St · 0.23 mi NE · Alteration or repair
    Jul 7$9,652,831
  71. Jul 2$139,100
  72. Jun 29$16,000
  73. Jun 28$10,000
  74. Jun 26$10,437
  75. Jun 23$3,296,604
  76. Equinox Boston Gym
    2-16 Avery St · 0.23 mi NW · Electrical
    Jun 17$70,300
  77. Jun 16$4,000
  78. Jun 15$19,090
  79. Jun 12$7,000
  80. Jun 10$50,000
  81. Jun 10$651,673
  82. Jun 9$22,000
  83. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.21 mi NE · Alteration or repair
    Jun 9$117,625
  84. Water damage in units 3710,3810,3910
    640-750 Atlantic Av · 0.20 mi E · Alteration or repair
    Jun 8$10,000
  85. Jun 5$106,500
  86. Jun 3$3,500
  87. Jun 3$41,268
  88. Jun 3$444,280
  89. May 27$1,500
  90. May 21$35,000
  91. May 21$1,500
  92. May 20$5,000
  93. May 18$4,915
  94. May 14$13,628
  95. May 12$22,000
  96. May 12$5,000
  97. May 11$16,000
  98. May 11$40,000
  99. May 8$2,000
  100. Plumbing to restaurant
    75-79 Summer St · 0.23 mi N · Plumbing
    May 6$35,000
  101. May 6$1,200
  102. May 4$18,000
  103. May 1$1,500

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 4, 2026. We checked it Oct 5, 18:15 UTC. See the city's official records.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near