Nearby Permits
Map of 199 permits and 2 zoning requests within a quarter mile of 31-37 Beach StAlteration or repair, 821-831 Washington St, Oct 8, 2026Electrical, 89-103 Bedford St, Oct 8, 2026Electrical, 21-53 Summer St, Oct 8, 2026Fire systems, 89-103 Bedford St, Oct 7, 2026Fire systems, 89-103 Bedford St, Oct 7, 2026Roofing, 228 Tremont St, Oct 6, 2026Plumbing, 1 Lincoln St, Oct 6, 2026Plumbing, 177 Tremont St, Oct 6, 2026Electrical, 25-43 Kneeland St, Oct 6, 2026Alteration or repair, 99 Chauncy St, Oct 5, 2026Electrical, 1 Lincoln St, Oct 5, 2026Alteration or repair, 104-114 Lincoln St, Oct 5, 2026Plumbing, 90 Tyler St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Fire systems, 1 Lincoln St, Oct 2, 2026Plumbing, 1 Lincoln St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 55-57 Hudson St, Oct 1, 2026Electrical, 90 Tyler St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Alteration or repair, 1 Lincoln St, Oct 1, 2026Fire systems, 31-33 Kingston St, Sep 30, 2026Electrical, 1 Lincoln St, Sep 30, 2026Fire systems, 21-53 Summer St, Sep 29, 2026Alteration or repair, 150 Harrison Av, Sep 29, 2026Alteration or repair, 1 Lincoln St, Sep 29, 2026Electrical, 31-33 Kingston St, Sep 24, 2026Electrical, 17-23 Beach St, Sep 24, 2026Alteration or repair, 83-87 Summer St, Sep 23, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Plumbing, 179-185 Essex St, Sep 16, 2026Alteration or repair, 101-103 Summer St, Sep 14, 2026Alteration or repair, 558-580 Washington St, Sep 14, 2026Alteration or repair, 183-186 Tremont St, Sep 14, 2026Roofing, 75 Hudson St, Sep 11, 2026Electrical, 745 Atlantic Av, Sep 11, 2026Electrical, 35 Tyler St, Sep 11, 2026Sign, 183-186 Tremont St, Sep 11, 2026Electrical, 753-755 Atlantic Av, Sep 10, 2026Electrical, 98-106 Boylston St, Sep 10, 2026Other, 171-173 Harrison Av, Sep 9, 2026Electrical, 1 Lincoln St, Sep 9, 2026Sign, 216-218 Tremont St, Sep 9, 2026Fire systems, 216-218 Tremont St, Sep 8, 2026Alteration or repair, 185-191 Harrison Av, Sep 8, 2026Plumbing, 1-3 Avery St, Sep 8, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Electrical, 2-16 Avery St, Sep 3, 2026Electrical, 89-103 Bedford St, Sep 3, 2026Plumbing, 800 Washington St, Sep 2, 2026Electrical, 800 Washington St, Sep 2, 2026Electrical, 66-86 Lincoln St, Aug 31, 2026Alteration or repair, 31-33 Kingston St, Aug 27, 2026Plumbing, 31-33 Kingston St, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Electrical, 68-74 Harrison Av, Aug 27, 2026Alteration or repair, 60-62 Beach St, Aug 27, 2026Electrical, 89-103 Bedford St, Aug 25, 2026Electrical, 31-33 Kingston St, Aug 21, 2026Alteration or repair, 136-146 Harrison Av, Aug 19, 2026Electrical, 109-119 Beach St, Aug 19, 2026Fire systems, 151 Tremont St, Aug 19, 2026Mechanical (HVAC), 1 Lincoln St, Aug 18, 2026Sign, 183-186 Tremont St, Aug 18, 2026Alteration or repair, 1-3 Avery St, Aug 17, 2026Plumbing, 150 Harrison Av, Aug 17, 2026Electrical, 210-216 Lincoln St, Aug 17, 2026Plumbing, 89-103 Bedford St, Aug 14, 2026Electrical, 65-85 Kneeland St, Aug 13, 2026Plumbing, 151 Tremont St, Aug 12, 2026Electrical, 89-103 Bedford St, Aug 12, 2026Plumbing, 1-3 Nassau St, Aug 11, 2026Roofing, 89-103 Bedford St, Aug 10, 2026Electrical, 52-58 Chauncy St, Aug 10, 2026Plumbing, 2-16 Avery St, Aug 7, 2026Alteration or repair, 89-103 Bedford St, Aug 6, 2026Plumbing, 109-119 Beach St, Aug 6, 2026Electrical, 2-16 Avery St, Aug 6, 2026Plumbing, 2-16 Avery St, Aug 5, 2026Electrical, 65-85 Kneeland St, Aug 5, 2026Electrical, 99 Chauncy St, Aug 4, 2026Electrical, 89-103 Bedford St, Aug 4, 2026Roofing, 79 Harrison Av, Aug 3, 2026Electrical, 150 Harrison Av, Aug 3, 2026Plumbing, 75-79 Summer St, Jul 31, 2026Electrical, 105-111 Chauncy St, Jul 30, 2026Electrical, 23-27 Tyler St, Jul 30, 2026Fire systems, 81-83a Essex St, Jul 30, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 59-59a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 57-57a Harvard St, Jul 29, 2026Alteration or repair, 66-70 Tyler St, Jul 29, 2026Alteration or repair, 72 Tyler St, Jul 29, 2026Fire systems, 2-16 Avery St, Jul 29, 2026Electrical, 2-16 Avery St, Jul 29, 2026Alteration or repair, 68-74 Harrison Av, Jul 28, 2026Electrical, 800 Washington St, Jul 28, 2026Electrical, 99 Summer St, Jul 28, 2026Electrical, 1-3 Avery St, Jul 27, 2026Alteration or repair, 64-68 Beach St, Jul 23, 2026Electrical, 145 Harrison Av, Jul 23, 2026Fire systems, 2-16 Avery St, Jul 23, 2026Alteration or repair, 99 Summer St, Jul 21, 2026Roofing, 99 Chauncy St, Jul 21, 2026Plumbing, 66-86 Lincoln St, Jul 21, 2026Electrical, 100 Stuart St, Jul 21, 2026Alteration or repair, 252-272 Tremont St, Jul 20, 2026Alteration or repair, 107-129 Kingston St, Jul 16, 2026Plumbing, 1-3 Avery St, Jul 14, 2026Alteration or repair, 2-16 Avery St, Jul 14, 2026Sign, 14-40 Beach St, Jul 13, 2026Alteration or repair, 99 Summer St, Jul 10, 2026Alteration or repair, 89-103 Bedford St, Jul 8, 2026Roofing, 99 Summer St, Jul 7, 2026Alteration or repair, 18 Hudson St, Jul 2, 2026Alteration or repair, 151 Tremont St, Jul 1, 2026Alteration or repair, 90 Tyler St, Jun 30, 2026Fire systems, 70-80 Mason St, Jun 29, 2026Electrical, 1-3 Avery St, Jun 28, 2026Fire systems, 65-85 Kneeland St, Jun 26, 2026Electrical, 65-85 Kneeland St, Jun 26, 2026Electrical, 180 Tremont St, Jun 26, 2026Electrical, 659-665 Washington St, Jun 26, 2026Sign, 75-79 Summer St, Jun 26, 2026Fire systems, 180 Tremont St, Jun 25, 2026Electrical, 180 Tremont St, Jun 25, 2026Alteration or repair, 89-103 Bedford St, Jun 23, 2026Fire systems, 151 Tremont St, Jun 23, 2026Plumbing, 151 Tremont St, Jun 18, 2026Fire systems, 151 Tremont St, Jun 18, 2026Electrical, 2-16 Avery St, Jun 17, 2026Roofing, 3 Johnny Ct, Jun 16, 2026Roofing, 8 Oxford Pl, Jun 16, 2026Electrical, 2-22 Boylston St, Jun 16, 2026Electrical, 1 Lincoln St, Jun 15, 2026Alteration or repair, 1 Lincoln St, Jun 15, 2026Sign, 800 Washington St, Jun 15, 2026Electrical, 1 Lincoln St, Jun 12, 2026Alteration or repair, 106-112 Beach St, Jun 11, 2026Alteration or repair, 170-170a Tremont St, Jun 10, 2026Plumbing, 170-170a Tremont St, Jun 10, 2026Electrical, 70-80 Mason St, Jun 10, 2026Alteration or repair, 2-16 Avery St, Jun 10, 2026Alteration or repair, 800 Washington St, Jun 9, 2026Alteration or repair, 1 Lincoln St, Jun 9, 2026Alteration or repair, 101-103 Summer St, Jun 9, 2026Alteration or repair, 704-780 Washington St, Jun 9, 2026Other, 821-831 Washington St, Jun 8, 2026Fire systems, 57-59 Beach St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Electrical, 13-17 Oxford St, Jun 8, 2026Alteration or repair, 66-86 Lincoln St, Jun 5, 2026Electrical, 4 Boylston Pl, Jun 5, 2026Alteration or repair, 6-6a Tyler St, Jun 5, 2026Alteration or repair, 1 Lincoln St, Jun 4, 2026Plumbing, 39 Boylston St, Jun 3, 2026Fire systems, 14-40 Beach St, Jun 3, 2026Alteration or repair, 100 Stuart St, Jun 1, 2026Electrical, 14-40 Beach St, Jun 1, 2026Roofing, 65 Hudson St, May 27, 2026Plumbing, 146-158 Lincoln St, May 27, 2026Electrical, 1-3 Avery St, May 27, 2026Alteration or repair, 121-123 Beach St, May 26, 2026Alteration or repair, 1 Lincoln St, May 26, 2026Plumbing, 146-158 Lincoln St, May 26, 2026Electrical, 13-17 Oxford St, May 22, 2026Electrical, 106-112 Beach St, May 22, 2026Electrical, 28-30 Kingston St, May 22, 2026Electrical, 21-53 Summer St, May 21, 2026Sign, 75 Harrison Av, May 21, 2026Fire systems, 180 Tremont St, May 20, 2026Electrical, 1-3 Nassau St, May 20, 2026Alteration or repair, 151 Tremont St, May 20, 2026Sign, 41 Lagrange St, May 18, 2026Plumbing, 821-831 Washington St, May 15, 2026Fire systems, 109-119 Beach St, May 15, 2026Electrical, 75 Harrison Av, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Electrical, 183-186 Tremont St, May 13, 2026Alteration or repair, 183-186 Tremont St, May 12, 2026Fire systems, 75-79 Summer St, May 12, 2026Electrical, 13-17 Oxford St, May 12, 2026Electrical, 26-30 West St, May 11, 2026Electrical, 75-79 Summer St, May 11, 2026Alteration or repair, 150 Harrison Av, May 11, 2026Alteration or repair, 145 Harrison Av, May 11, 2026Electrical, 151 Tremont St, May 8, 2026Alteration or repair, 13-17 Oxford St, May 8, 2026Alteration or repair, 21-53 Summer St, May 8, 2026Alteration or repair, 151 Tremont St, May 7, 2026Fire systems, 89-103 Bedford St, May 7, 2026Electrical, 180 Tremont St, May 7, 2026Electrical, 65-85 Kneeland St, May 7, 2026Alteration or repair, 13-17 Oxford St, May 6, 2026Plumbing, 75-79 Summer St, May 6, 2026Electrical, 2-16 Avery St, May 6, 2026Electrical, 99 Chauncy St, May 5, 2026Zoning request · Filed May 14 · 51 to 59 Stuart St · to change existing static off premise sign to include digital format per Article 11-7 within the Theatre…Zoning request · Filed Jan 23 · 215 Harrison Av · Zoning appeal: "Addition and Conversion from 3 units residential to 4 units residential…"660 ft Map preview
Open mapBack to list
  • Searched address
  • Addition or alteration
  • Electrical, plumbing, HVAC
  • Roof, fence, sign, facade
  • Paperwork or other
  • Zoning request

31-37 Beach St

Boston, MA 02111

At this address
15 permits on record. Newest issued Jul 18, 2025: Fire alarm modifications and additions for bank renovation
Within ¼ mile
199 more permits (194 projects) issued since May 1.
Biggest nearby
A $6M alteration or repair at 2-16 Avery St, permitted Jul 14, within ¼ mile since May 1.
MayJunJulAugSepOct
Here15 permits · 31-37 Beach St
  1. Jul 18, 2025$5,000
  2. Renovation laundry room
    Alteration or repair
    Jun 27, 2025$10,400
  3. Apr 28, 2025$45,000
  4. Jan 27, 2025$32,000
  5. Check WET wiring after fire × 2 permits
    Electrical
    Jan 19, 2025$3,000
  6. Jan 14, 2025$20,000
  7. Dec 29, 2024$1,500
  8. Dec 24, 2024$423,940
  9. Nov 25, 2024$46,550
  10. Sep 15, 2021$9,750
  11. Aug 9, 2013$200
  12. Jun 26, 2013$100
  13. May 25, 2011$5,000
  14. Apr 7, 2011not listed
Next doorunder 250 ft · 10 permits
  1. Sep 24$90,000
  2. Data wiring for office
    68-74 Harrison Av · 170 ft SE · Electrical
    Aug 27$3,000
  3. Aug 27$10,000
  4. Aug 3$69,500
  5. Work done in 5th floor office
    68-74 Harrison Av · 170 ft SE · Alteration or repair
    Jul 28$62,300
  6. Jul 13$1,000
  7. Jun 3$7,978
  8. Jun 1$11,626
  9. May 21$1,000
  10. May 13$1,000
This block250 to 1,000 ft · 118 permits in 115 projects
  1. Oct 6$58,816
  2. Oct 6$70,000
  3. Oct 6$2,500
  4. Oct 6$22,000
  5. Oct 5$550,958
  6. Oct 5$600,000
  7. Oct 5not listed
  8. Oct 2$6,000
  9. Oct 2$65,000
  10. Oct 2$20,000
  11. Oct 2$196,500
  12. Oct 1$89,172
  13. Access Control and CCTV
    55-57 Hudson St · 630 ft S · Electrical
    Oct 1$160,000
  14. Oct 1$450,000
  15. Oct 1$10,000
  16. Oct 1$600,000
  17. Oct 1$3,000,000
  18. Sep 30$725,000
  19. Sep 29$396,999
  20. Sep 29$5,113,779
  21. Remodel masterbathroom
    558-580 Washington St · 760 ft N · Alteration or repair
    Sep 14$10,400
  22. Sep 14$74,290
  23. Sep 11$29,324
  24. Sep 11$10,000
  25. Sep 11$2,300
  26. Sep 9$2,700
  27. Sep 9$18,000
  28. Sep 9$4,200
  29. Sep 8$12,585
  30. Sep 8$23,341
  31. Sep 8$7,000
  32. Equinox Boston Gym
    2-16 Avery St · 740 ft NW · Electrical
    Sep 3$5,000
  33. Sep 2$20,000
  34. Sep 2$52,000
  35. Including Retail.in the restaurant
    60-62 Beach St · 410 ft E · Alteration or repair
    Aug 27$7,500
  36. 8th floor interior demolition
    136-146 Harrison Av · 560 ft S · Alteration or repair
    Aug 19$15,000
  37. Aug 18$55,000
  38. Aug 18$2,500
  39. Aug 17$74,000
  40. Aug 17$300,000
  41. Aug 17$5,000
  42. Aug 13$3,000
  43. Aug 10$10,000
  44. Aug 7$45,672
  45. HVAC Controls
    2-16 Avery St · 740 ft NW · Electrical
    Aug 6$45,000
  46. Aug 5$667,993
  47. Aug 5$1,000
  48. Aug 4$8,135
  49. Aug 3$2,500
  50. Jul 30$93,000
  51. Jul 30$1,810
  52. Jul 30$14,738
  53. Masonry work, brick pointing, gutter replacement × 2 permits
    59-59a Harvard St · 750 ft S · Alteration or repair
    Jul 29$27,500
  54. Masonry work, brick pointing, gutter replacement × 2 permits
    66-70 Tyler St · 720 ft S · Alteration or repair
    Jul 29$27,500
  55. Jul 29$27,500
  56. Jul 29$27,500
  57. Jul 29$75,000
  58. Jul 29$300,000
  59. Jul 28$400,000
  60. Jul 27$7,500
  61. Jul 23$267,785
  62. Jul 23$45,987
  63. Jul 23$8,500
  64. Jul 21$190,000
  65. Jul 20$66,817
  66. Jul 16$152,409
  67. Jul 14$20,000
  68. Jul 14$6,010,000
  69. Jul 2$1,000
  70. Remove old suspended ceiling
    90 Tyler St · 900 ft S · Alteration or repair
    Jun 30$176,600
  71. Jun 29$350,000
  72. Jun 28$10,000
  73. Jun 26$11,875
  74. Jun 26$60,000
  75. Jun 26$55,000
  76. Jun 26$121,914
  77. Jun 25$160,057
  78. Jun 25$3,600
  79. Equinox Boston Gym
    2-16 Avery St · 740 ft NW · Electrical
    Jun 17$70,300
  80. Jun 16$22,236
  81. Jun 16$4,000
  82. Jun 15$50,000
  83. Interior demolition of partitions
    1 Lincoln St · 980 ft NE · Alteration or repair
    Jun 15$500,000
  84. Jun 15$19,090
  85. Jun 12$20,000
  86. Jun 10$75,000
  87. Jun 10$651,673
  88. Jun 9$22,000
  89. Renovations to 24th floor suite × 2 permits
    1 Lincoln St · 980 ft NE · Alteration or repair
    May 26 to Jun 9$133,000
  90. Jun 9$362,682
  91. Jun 8$17,000
  92. Jun 8$4,000
  93. Jun 8$4,000
  94. Change Occupancy/no work has to be done
    6-6a Tyler St · 340 ft E · Alteration or repair
    Jun 5$500
  95. Renovations to 5th and 6th floor suites
    1 Lincoln St · 980 ft NE · Alteration or repair
    Jun 4$337,125
  96. Jun 3$3,500
  97. May 27$6,000
  98. May 27$2,000
  99. May 27$1,500
  100. May 26$12,000
  101. May 22$9,000
  102. May 20$11,440
  103. May 18$4,915
  104. May 13$10,000
  105. May 13$35,000
  106. Refresh of existing int
    183-186 Tremont St · 810 ft NW · Alteration or repair
    May 12$171,574
  107. May 12$4,000
  108. May 11$488,050
  109. May 11$615,100
  110. May 8$6,000
  111. May 7$200,000
  112. May 7$20,000
  113. Interior Replacement of insulation
    13-17 Oxford St · 360 ft NE · Alteration or repair
    May 6$38,763
  114. May 6$1,200
  115. May 5$13,200
Within a quarter mile1,000 ft to ¼ mi · 71 permits in 69 projects
  1. Oct 8$24,150
  2. Oct 8$2,000
  3. Oct 8$815,000
  4. Oct 7$8,000
  5. Oct 7$12,000
  6. Sep 30$3,500
  7. Sep 29$110,000
  8. Sep 24$3,500
  9. Sep 23$14,500
  10. Sep 16$100,000
  11. Re-pointing of stone, parging of stone
    101-103 Summer St · 0.24 mi NE · Alteration or repair
    Sep 14$326,600
  12. Sep 11$14,000
  13. Sep 10$1,000
  14. Sep 10$150,000
  15. Sep 3$1,784
  16. Sep 3$4,460
  17. Aug 31$11,000
  18. Aug 27$60,000
  19. Aug 27$8,000
  20. Aug 25$10,000
  21. Aug 21$14,000
  22. Aug 19$3,000
  23. Aug 19$19,800
  24. Aug 14$20,000
  25. Aug 12$10,000
  26. Aug 12$225,000
  27. Aug 11$1,500
  28. Aug 10$249,760
  29. Aug 6$391,910
  30. Aug 6$4,500
  31. Aug 4$125,000
  32. Jul 31$10,000
  33. Jul 28$13,895
  34. Jul 21$317,025
  35. Renovation 2 bathroom
    66-86 Lincoln St · 0.20 mi E · Plumbing
    Jul 21not listed
  36. Jul 21$6,000
  37. Jul 10$54,007
  38. Select interior non structural demolition × 2 permits
    89-103 Bedford St · 0.21 mi NE · Alteration or repair
    Jun 23 to Jul 8$1,550,000
  39. Remove and replace roof
    99 Summer St · 0.24 mi NE · Roofing
    Jul 7$92,700
  40. Jul 1$28,000
  41. Jun 26$10,437
  42. Jun 23$68,000
  43. Jun 18$24,600
  44. Jun 18$23,000
  45. Jun 16$15,366
  46. Project Address: 112-6 Beach Street
    106-112 Beach St · 0.19 mi E · Alteration or repair
    Jun 11$80,858
  47. Jun 10$18,900
  48. Jun 10$2,500
  49. Interior Lobby ADA lift replacement
    101-103 Summer St · 0.24 mi NE · Alteration or repair
    Jun 9$117,625
  50. Jun 8$10,700
  51. Jun 5$20,000
  52. Jun 5$9,800
  53. Jun 1$41,922
  54. May 26$2,000
  55. Replacement condenser
    106-112 Beach St · 0.19 mi E · Electrical
    May 22$1,800
  56. May 22$3,800
  57. May 21$369,000
  58. May 20$5,000
  59. May 20$538,946
  60. May 15$3,000
  61. May 15$16,200
  62. May 12$22,000
  63. May 11$5,000
  64. May 11$40,000
  65. Demo, temp lights
    151 Tremont St · 0.23 mi NW · Electrical
    May 8$38,000
  66. May 8$3,554,969
  67. Removal of interior walls, sheet rock
    151 Tremont St · 0.23 mi NW · Alteration or repair
    May 7$500
  68. May 7$3,037
  69. Plumbing to restaurant
    75-79 Summer St · 0.24 mi NE · Plumbing
    May 6$35,000
Zoning requests nearby2 requests · as of Oct 11

Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.

  1. Filed May 14
  2. Zoning appeal: "Addition and Conversion from 3 units residential to 4 units residential…"
    215 Harrison Av · 0.23 mi S · Requested · city: "Community Process" · case BOA1814235
    Filed Jan 23
More on this streetBeach St · 10 nearest addresses with permits

Alerts haven't started yet. When they do, we'll send one email to confirm. After that we'll only email you about permits, zoning requests and hearing dates at this address and nearby. You can unsubscribe at any time. Privacy policy

Boston Inspectional Services Department updated its data Oct 9, 2026. We checked it Oct 11, 18:15 UTC. See the city's official records.

Zoning requests come from the Boston Zoning Board of Appeal tracker. We read it Oct 11, 17:17 UTC.

At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.

For agents and scripts: This page as Markdown · JSON · Nearby as JSON · Zoning as JSON · MCP tool permits_near, and zoning_requests_near for zoning